Sec. 11.1. - The following fees have been set by the woodbine planning commission for services listed below.

Schedule of Fees
Type of Permit Application Fee Process Fee Engineering
Review Fee
Legal
Review Fee
Wall 30 70 0 0
Ground 30 70 0 0
Pylon (7 to 75 Feet) 30 95 0 0
Pylon (75 to 100 Feet) 30 145 0 0
Pylon (Over 100 Feet) 30 170 0 0
Rezoning Permit
Residential/Commercial/Industrial/Planned Development
(0 s.f.—19,999 s.f.)
160 140 140 150
Residential/Commercial/Industrial/Planned Development(20,000 s.f.—74,999 s.f.) 260 190 235 150
Residential/Commercial/Industrial/Planned Development(75,000 s.f.—99,999 s.f.) 330 245 235 150
Residential/Commercial/Industrial/Planned Development(100,000 s.f.—149,000 s.f.) 335 240 330 300
Residential/Commercial/Industrial/Planned Development(150,000 s.f. - 299,999 s.f.) 385 290 425 450
Residential/Commercial/Industrial/Planned Development(over 299,999 s.f.) 550 225 565 750
Rezoning Permits for Uses Not Listed Above 160 140 140 150
Special Use Permit 160 140 140 150
Variance Permit 100 150 0 150
Home Occupation Permit 155 145 140 150
Temporary Use Permit 150 0 140 150

 

Building Fees
Type: Fee:
Building—New, Addition, Pools, etc. 1/2 of 1% of Total Building Cost, net of following
Plumbing 2% of Plumbing Cost
Electrical 2% of Electrical Cost
Low Voltage Electrical 2% of Low Voltage Electrical Cost
HVAC 2% of HVAC Cost
Gas 2% of Gas Cost
Fire Suppression System 2% of Fire Suppression System Cost
Underground Utilities 2% of Underground Utilities Cost
* A flat fee of $50.00 shall be charged if the total permit fee for any of the above permits is less than $50.00

 

Flat Fees
Type: Fee:
Temporary Power Pole $25.00
Permanent Power $25.00
Above Ground Pools $25.00
Mobile Homes $70.00
Demolition $200.00
Land Disturbing Activities $100.00
Culvert/Additional Driveway Installation $100.00

 

Penalty Fees
Type: Fee:
Reinspection Fee $20.00
If any person or organization commences work prior to obtaining a permit will incure an additional charge. $60.00

 