Definitions listed in Part Two of this chapter shall be applied to the regulation, review, and administration of all critical areas, including flood hazard areas, unless the definition itself identifies the term as applying to flood hazard administration, in which case the definition only applies to that situation.
“Abutting”
means bordering upon, to touch upon, or in physical contact with. Sites are considered abutting even though the area of contact may be only a point.
“Adjacent”
means to be nearby and not necessarily abutting.
“Alluvial fan”
is a low, outspread, relatively flat to gently sloping feature, shaped like an open fan or a segment of a cone, deposited by a stream at the place where it issues from a valley upon a plain or broad valley; where a tributary stream is near or at its junction with the main stream; or wherever a constriction in a valley abruptly ceases or the gradient of the stream suddenly decreases. It is steepest near the mouth of the valley where its apex points upstream and it slopes gently and convexly outward with gradually decreasing gradient.
“Alteration of watercourse”
means any action that will change the location of the channel occupied by water within the banks of any portion of a riverine waterbody.
“Applicant”
means a person, party, firm, corporation, or other legal entity that proposes development, construction, or use on a parcel of property.
“Aquifer”
means a saturated geologic formation, which will yield a sufficient quantity of water to serve as a private or public water supply.
“Area of shallow flooding”
is a designated zone AO, AH, AR/AO or AR/AH on a community’s flood insurance rate map (FIRM) with a one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow. Also referred to as the sheet flow area.
“Area of special flood hazard”
is the land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year. It is shown on the flood insurance rate map (FIRM) as zone A, AO, AH, A1-30, AE, A99, AR. “Special flood hazard area” is synonymous in meaning with the phrase “area of special flood hazard.”
“ASCE 24”
is the most recently published version of ASCE 24, Flood Resistant Design and Construction, published by the American Society of Civil Engineers.
“Bank”
means the land surface above the ordinary high water mark that abuts a body of water and contains it to the bankfull depth.
“Bank stabilization”
means the construction or modification of bulkheads, retaining walls, dikes, levees, riprap, breakwaters, jetties, groins, weirs, and other structures along a bank, for the purpose of controlling stream undercutting or bank erosion.
“Bankfull depth”
means the average vertical distance between the channel bed and the estimated water surface elevation required to completely fill the channel to a point above which water would enter the floodplain or intersect a terrace or hillslope. In cases where multiple channels exist, the bankfull depth is the average depth of all channels along the cross-section.
“Base flood,”
for purposes of administering Part Four, means the flood having a one percent chance of being equaled or exceeded in any given year. (See IBC Section 1612.2.)
“Base flood elevation,”
for purposes of administering Part Four, means the elevation of the base flood, including wave height, relative to the National Geodetic Vertical Datum, North American Vertical Datum, or other datum specified on the flood insurance rate map. (See IBC Section 1612.2.)
“Basement,”
for purposes of administering Part Four, means any area of the building having its floor subgrade (below ground level) on all sides. (See IBC Section 1612.2.)
“Bed”
means the land below the ordinary high water lines of state waters. This definition shall not include irrigation ditches, canals, stormwater run-off devices, or other artificial watercourses except where they exist in a natural watercourse that may have been altered by unnatural means.
“Bedrock”
means the solid rock underlying unconsolidated surface materials.
“Berm”
means a mound or wall of earth material used as a protective barrier or to control the direction of water flow.
“Best management practices” or “BMPs”
means schedules of activities, practices, maintenance procedures, and structural and/or managerial practices that, when used singly or in a combination, prevent or reduce adverse impacts to the environment.
“Bioengineering”
means project designs or construction methods which use live woody vegetation or a combination of live woody vegetation and specially developed natural or synthetic materials to establish a complex root grid within the existing bank which is resistant to erosion, provides bank stability, and maintains a healthy riparian environment with habitat features important to fish life. Use of wood structures or limited use of clean angular rock may be allowable to provide stability for the establishment of vegetation.
“Breakwater”
means a fixed or floating in-water structure that protects the bank from the forces of waves or currents.
“Building official”
means the manager of the code administration and planning division or a designee.
“Bulkhead”
means a vertical or nearly vertical erosion protection structure placed parallel to the bank consisting of concrete, timber, steel, rock, or other permanent material not readily subject to erosion.
“Channel”
means an open conduit, either naturally or artificially created, which periodically or continuously contains moving water, or which forms a connecting link between two bodies of water.
“Classification”
means value and hazard categories to which critical areas and natural resource lands will be assigned.
“Clearing”
means the removal of timber, brush, grass, ground cover or other vegetative matter from a parcel of land.
“Compaction”
means compressing soil or other material through some mechanical means to make it denser.
“Construction”
means the assembly, placement, or installation of structures, roadways, transmission lines, and other improvements within a parcel of land.
“Construction materials,”
for the purpose of Part Four, means all new construction and substantial improvements shall be constructed with material and utility equipment resistant to flood damage. See Technical Bulletin 2-93 for qualifying materials. (FEMA Section 60.3(a)(3)(ii))
“Construction methods,”
for the purpose of Part Four, means all new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage.
“Critical aquifer recharge area”
means an area with a critical recharging effect on an aquifer(s) used for potable water or areas where a drinking water aquifer is vulnerable to contamination that would affect the potability of the water.
“Critical facility”
means a facility for which even a slight chance of flooding might be too great. Critical facilities include (but are not limited to) schools, nursing homes, hospitals, police, fire and emergency response installations, and installations which produce, use, or store hazardous materials or hazardous waste.
“Department”
means the city of Yakima department of community and economic development.
“Designated”
means formal legislative action to identify and describe a critical area.
“Development”
means the division of land into lots or parcels in accordance with the city’s subdivision ordinance (YMC Title 14), and any clearing, excavation, dredging, drilling, filling, dumping, removal of earth and mineral materials, or other permanent or temporary modification of a parcel of land up to, but not including, “construction” as defined in this chapter. For the purpose of YMC §§ 15.27.400 through 15.27.436, “development” also means any manmade change to improved or unimproved real estate located within a special flood hazard area, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling, temporary or permanent storage of equipment or material and “works” as defined in this chapter. (See IBC Section G 201.2)
“Dike”
means an embankment to prevent flooding by a stream or other waterbody. A dike is also referred to as a levee.
“Dock”
means a structure built over or floating upon the water and used as a landing place for boats and other marine transport, fishing, swimming, and other recreational uses.
“Dredging”
means removal of earth from the bed of a stream, lake, or pond for the purpose of increasing the depth of surface water or obtaining minerals, construction aggregate, or landfill materials. This definition does not include excavation for mining within a pond created by a mining operation approved under this chapter or under a local zoning ordinance, or a mining operation in existence before zoning, shorelines, or critical areas permits were required for such operations.
“Earth material”
means any rock, natural soil, organic material or combination thereof.
“Elevated building”
means, for insurance purposes, a nonbasement building that has its lowest elevated floor raised above ground level by foundation walls, shear walls, posts, piers, pilings, or columns.
“Elevation certificate”
means an administrative tool of the National Flood Insurance Program (NFIP) that can be used to provide elevation information, to determine the proper insurance premium rate, and to support a request for a letter of map amendment (LOMA) or letter of map revision based on fill (LOMR-F).
“Enhance”
means to strengthen any of the basic functional properties listed in YMC § 15.27.504 that exist but do not perform at optimum efficiency. “Optimum” refers to the most favorable or best performance of each function achievable for a specific segment of stream corridor.
“Ephemeral stream”
means a stream that flows only in response to precipitation with no groundwater association, usually thirty days or less per year. The lack of any groundwater association results in a lack of distinctive riparian vegetation compared to the surrounding landscape.
“Erosion”
means the wearing away of the earth’s surface as a result of the movement of wind, water, or ice.
Essential Facility.
This term has the same meaning as “essential facility” defined in ASCE 24. Table 1-1 in ASCE 24-14 further identifies building occupancies that are essential facilities.
“Excavation”
means the mechanical removal of earth material.
“Existing manufactured home park or subdivision”
means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by the community.
“Expansion to an existing manufactured home park or subdivision”
means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).
“Fill”
means the addition of any material, such as (by way of illustration) earth, clay, sand, rock, gravel, concrete rubble, rubble, wood chips, bark, or waste of any kind, which is placed, stored or dumped upon the surface of the ground resulting in an increase in the natural surface elevation. The physical structure of a bank stabilization structure shall not be considered fill. However, fill placed behind the structure is considered fill. Stream bed manipulation for irrigation diversions shall not be considered fill.
“Fish and wildlife habitat conservation”
means land management for maintaining populations of species in suitable habitats within their natural geographic distribution so that the habitat available is sufficient to support viable populations over the long term and isolated subpopulations are not created. This does not mean maintaining all individuals of all species at all times, but it does mean not degrading or reducing populations or habitats so that they are no longer viable over the long term. Counties and cities should engage in cooperative planning and coordination to help assure long-term population viability.
“Fish and wildlife habitat conservation areas”
are areas that serve a critical role in sustaining needed habitats and species for the functional integrity of the ecosystem, and which, if altered, may reduce the likelihood that the species will persist over the long term. These areas may include, but are not limited to, rare or vulnerable ecological systems, communities, and habitat or habitat elements including seasonal ranges, breeding habitat, winter range, and movement corridors; and areas with high relative population density or species richness. Counties and cities may also designate locally important habitats and species. “Fish and wildlife habitat conservation areas” does not include such artificial features or constructs as irrigation delivery systems, irrigation infrastructure, irrigation canals, or drainage ditches that lie within the boundaries of, and are maintained by, a port district or an irrigation district or company.
“Flood” or “flooding”
means:
1)
A general and temporary condition of partial or complete inundation of normally dry land areas from:
a.
The overflow of inland or tidal waters.
b.
The unusual and rapid accumulation or runoff of surface waters from any source.
c.
Mudslides (i.e., mudflows) which are proximately caused by flooding as defined in subsection (1)(b) of this definition and are akin to a river of liquid and flowing mud on the surfaces of normally dry land areas, as when earth is carried by a current of water and deposited along the path of the current.
2)
The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding as defined in subsection (1)(a) of this definition.
“Flood elevation study”
means an examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation and determination of mudslide (i.e., mudflow) and/or flood-related erosion hazards. Also known as a flood insurance study (FIS).
“Flood hazard permit”
means written approval applied for and obtained in accordance with such rules and regulations as are established under this chapter.
“Flood insurance rate map (FIRM)”
means the official map on which the Federal Insurance Administrator has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. A FIRM that has been made available digitally is called a digital flood insurance rate map (DFIRM).
Flood Insurance Study.
See “Flood elevation study.”
“Flood-prone”
means a land area for which a floodway and floodplain has not been determined with respect to any specific flood frequency, but for which the potential for flooding can be identified by information observable in the field, such as soils or geological evidence, or by materials such as flood studies, topographic surveys, photographic evidence or other data.
“Floodplain” or “flood-prone area”
means any land area susceptible to being inundated by water from any source. See “Flood” or “flooding.”
“Floodplain administrator”
is the community official designated by title to administer and enforce the flood-plain management regulations.
“Floodplain management regulations”
means zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances (such as floodplain ordinance, grading ordinance and erosion control ordinance) and other application of police power. The term describes such state or local regulations, in any combination thereof, which provide standards for the purpose of flood damage prevention and reduction.
“Floodproofing”
means any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate risk of flood damage to real estate or improved real property, water and sanitary facilities, structures, and their contents. Floodproofed structures are those that have the structural integrity and design to be impervious to floodwater below the base flood elevation.
“Floodway”
means the channel of a river, stream, or other watercourse, plus the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation a designated height. Also referred to as “regulatory floodway.”
“Floodway fringe,”
for purposes of administering Part Four, means that portion of a floodplain which is inundated by floodwaters but is not within a defined floodway. Floodway fringes serve as temporary storage for floodwaters.
“Functionally dependent use”
means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, and does not include long-term storage or related manufacturing facilities.
“Grade”
means the vertical location of the ground surface.
“Grade, existing”
is the current grade in either its undisturbed, natural condition or as disturbed by some previous modification.
“Grade, finish”
is the final grade of the site which conforms to an approved plan.
“Grade, natural”
is the grade as it exists or may have existed in its original undisturbed condition.
“Grade, rough”
is a stage where grade conforms approximately to an approved plan.
“Grading”
means any excavation, filling, or combination thereof.
“Groundwater”
means water that occurs beneath the land surface, also called subsurface water or subterranean water. “Groundwater” includes water in the zone of saturation of a water-bearing formation.
“Habitats of local importance”
are designated as fish and wildlife habitat conservation areas based on a finding by the city that they are locally important.
“Highest adjacent grade”
means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure.
“Historic structure”
means any structure that is:
1)
Listed individually in the National Register of Historic Places (a listing maintained by the Department of the Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;
2)
Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;
3)
Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or
“Hyporheic”
means a groundwater area adjacent to and below channels where water is exchanged with channel water and water movement is mainly in the downstream direction.
“Intermittent stream”
means a stream which flows only during certain times of the year, with inputs from precipitation and groundwater, but usually more than thirty days per year. Groundwater association generally produces an identifiable riparian area. This definition does not include streams that are intermittent because of irrigation diversion or other manmade diversions of the water.
“Lake” or “pond”
means an inland body of standing water. The term can include the reservoir or expanded part of a river behind a dam.
“Lowest floor,”
for purposes of administering Part Four, means the lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access or storage, in an area other than a basement area, is not considered a building’s lowest floor; provided, that such enclosure is not built so as to render the structure in violation of the applicable nonelevation design requirements of this chapter.
“Manufactured home”
means a structure fabricated on a permanent chassis that is transportable in one or more sections; is designed to be used with or without a permanent foundation when connected to the required facilities and is used for human occupancy as a residential dwelling. The term “manufactured home” shall include “mobile home” for regulatory purposes under this chapter. The term shall not include “recreation vehicle,” “commercial coach,” “camping vehicle,” “travel trailer,” “park trailer,” “tip-out,” and any other similar vehicle which is not intended, designed, constructed, or used as a single-family dwelling.
“Manufactured home park or subdivision”
means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale pursuant to this title.
“Manufactured home park or subdivision, existing”
means a manufactured home park or subdivision that was completed before December 15, 1981, the effective date of the floodplain management regulations.
“Mean sea level”
means, for purposes of the National Flood Insurance Program, the vertical datum to which base flood elevations shown on a community’s flood insurance rate map are referenced.
“Minerals”
means gravel, sand, and metallic and nonmetallic substances of commercial value.
“Mining”
means the removal of naturally occurring minerals and materials from the earth for commercial value. Mining includes processing and batching. Mining does not include large excavations for structures, foundations, parking areas, etc. (See YMC § 15.27.516.)
“Minor revision”
includes minor changes in facility orientation or location, minor changes in structural design that do not change the height or increase ground floor area, and minor accessory structures (such as equipment covers or small sheds near the main structure, etc.).
“Native”
means indigenous to or originating naturally within the city of Yakima and surrounding areas.
“Natural conditions”
means those conditions which arise from or are found in nature and not modified by human intervention.
“New construction,”
for purposes of administering Part Four of this chapter and for the purposes of determining insurance rates, means structures for which the “start of construction” commenced on or after the effective date of the initial flood insurance rate map or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, “new construction” means structures for which the “start of construction” commenced on or after the effective date of a floodplain management regulation adopted by a community and includes any subsequent improvements to such structures.
“New manufactured home park or subdivision”
means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of adopted floodplain management regulations adopted by the community.
“Nonconforming structure,”
for purposes of administering Part Four of this chapter, means a structure which was lawful prior to the adoption or amendment of this chapter, but which fails by reason of such adoption or amendment to conform to the present requirements of the zoning district in which it is located. In addition, the structure may not be permitted as a new structure under the terms of this chapter because the structure may not be in conformance with the applicable elevation and/or floodproofing requirements.
“Nonconforming use,”
for purposes of administering Part Four of this chapter, means a use of land or structure which was lawfully established and maintained prior to the adoption or amendment of this chapter, but does not conform to this chapter for the zoning district in which it is located. In addition, the use may not be permitted as a new use under the terms of this chapter because the use may not be in conformance with the applicable elevation and/or floodproofing requirements.
“Normal appurtenances”
includes: garages, decks, driveways, utilities, fences, and grading which does not exceed two hundred fifty cubic yards.
“Normal repair”
means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction.
One-Hundred-Year Flood or 100-Year Flood.
See “Base flood.”
“Ordinary high water mark”
means a mark on lakes and streams which can be found by examining the bed and banks and ascertaining where the presence and action of waters are so common and usual, and so long continued in ordinary years as to mark upon the soil or vegetation a character distinct from the abutting upland; provided, that in any area where the ordinary high water line cannot be found, the ordinary high water line is the elevation of the mean annual flood.
“Perennial stream”
means a stream that flows year-round in normal water years.
“Priority habitat”
means a habitat type with unique or significant value to one or more species. An area classified and mapped as priority habitat must have one or more of the following attributes: comparatively high fish or wildlife density, comparatively high fish or wildlife species diversity, fish spawning habitat, important wildlife habitat, important fish or wildlife seasonal range, important fish or wildlife movement corridor, rearing and foraging habitat, refuge, limited availability, high vulnerability to habitat alteration, unique or dependent species, or shellfish bed. A priority habitat may be described by a unique vegetation type or by a dominant plant species that is of primary importance to fish and wildlife. A priority habitat may also be described by a successional stage. Alternatively, a priority habitat may consist of a specific habitat element (such as talus slopes, caves, or snags) of key value to fish and wildlife. A priority habitat may contain priority and/or nonpriority fish and wildlife.
“Priority species”
means species requiring protective measures and/or management guidelines to ensure their persistence at genetically viable population levels. Priority species are those that meet any of the criteria listed below:
1)
Washington State (State) Listed or State-Proposed Species. State-listed species are those native fish and wildlife species legally designated as endangered (WAC 232-12-014), threatened (WAC 232-12-011), or sensitive (WAC 232-12-011). State-proposed species are those fish and wildlife species that will be reviewed by WDFW (POL-M-6001) for possible listing as endangered, threatened, or sensitive according to the process and criteria defined in WAC 232-12-297.
2)
Vulnerable Aggregations. Vulnerable aggregations include those species or groups of animals susceptible to significant population declines, within a specific area or statewide, by virtue of their inclination to congregate.
3)
Species of Recreational, Commercial, and/or Tribal Importance. Native and nonnative fish, shellfish, and wildlife species of recreational or commercial importance and recognized species used for tribal ceremonial and subsistence purposes that are vulnerable to habitat loss or degradation.
4)
Species listed under the federal Endangered Species Act as either proposed, threatened, or endangered.
“Project site”
means that portion of any lot, parcel, tract, or combination thereof which encompasses all phases of the total development proposal.
“Qualified professional”
means a person with experience, training, expertise, and related work experience appropriate for the relevant critical area subject in accordance with WAC 365-195-905(4). The professional shall provide their qualifications to the administrative official to ensure the professional has the acceptable level of qualifications and experience for the relevant critical area they will be working in.
“Reasonably safe from flooding”
means development that is designed and built to be safe from flooding based on consideration of current flood elevation studies, historical data, high water marks and other reliable data known to the community. In unnumbered A zones where flood elevation information is not available and cannot be obtained by practicable means, “reasonably safe from flooding” means that the lowest floor is at least two feet above the highest adjacent grade.
“Recreation vehicle”
means a vehicle which is:
1)
Built on a single chassis;
2)
Four hundred square feet or less when measured at the largest horizontal projection;
3)
Designed to be self-propelled or permanently towable by a light-duty truck; and
4)
Designed primarily for temporary living quarters used during recreational, camping, travel, or seasonal conditions.
“Restore,” “restoration” or “ecological restoration”
means the reestablishment or upgrading of impaired functions, such as those listed in YMC § 15.27.504, that have been lost or destroyed through natural events or human activity. This may be accomplished through measures including, but not limited to, revegetation, removal of intrusive structures, and removal or treatment of toxic materials. Restoration does not imply a requirement for returning the site to aboriginal or pre-European settlement conditions.
“Revetment”
means a facing placed on a bank or bluff to protect a slope, embankment, or structure against erosion by wave action or currents.
“Riparian vegetation”
means the terrestrial vegetation that grows beside rivers, streams, and other freshwater bodies and that depends on these water sources for soil moisture greater than would otherwise be available from local precipitation.
“Riprap”
means a layer, facing, or protective mound of rubble or stones randomly placed to prevent erosion, scour, or sloughing of a structure or embankment; also the stone used for this purpose.
“Scour”
means the removal of underwater material by waves and currents, especially at the base or toe of a bank stabilization or other in-water structure.
“Shoreline,”
as used in this chapter, means those water areas, the associated features, and the land areas that are subject to the State Shoreline Management Act, as defined in RCW 90.58.030 and the city of Yakima’s current shoreline master program (YMC § 17.01.090).
“Single-family residence”
means a detached dwelling designed for and occupied by one family, including those structures and developments which are a normal appurtenance.
“Slope”
means an inclined ground surface, the inclination of which is expressed as a ratio of horizontal distance to vertical distance.
“Solid waste”
means all putrescible and nonputrescible solid and semisolid wastes including, but not limited to, garbage, rubbish, wood waste, ashes, industrial wastes, swill, demolition and construction wastes, abandoned vehicles or parts thereof, and discarded commodities.
“Special flood hazard area”
means the land in the floodplain identified by the Federal Emergency Management Agency that is subject to a one percent or greater chance of flooding in any given year, commonly known as the one-hundred-year floodplain.
“Species of local importance”
are those species that are of local concern due to their population status or their sensitivity to habitat alteration or that are game species.
“Start of construction,”
for purposes of administering Part Four, includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, placement or other improvement was within one hundred eighty days of the permit date. The “actual start” means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include the excavation for a basement, footings, piers or foundations, or the erection of temporary forms; nor does it include the installation of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the “actual start of construction” means the first alteration of any wall, ceiling, floor, or structural part of a building, whether or not that alteration affects the external dimensions of the building.
“Stream”
means water contained within a channel either perennial, intermittent, or ephemeral. Streams include both natural watercourses or those modified by man (example: stream flow manipulation, channelization, and relocation of the channel). They do not include irrigation ditches, wasteways, drains, outfalls, operational spillways, canals, stormwater runoff facilities, or other artificial watercourses except those that are located within existing wetland or streams.
“Structure”
means anything constructed or erected which requires location on the ground, or attached to something having a location on the ground, but not including fences or walls used as fences less than six feet in height, and including gas or liquid storage tanks when located aboveground. For purposes of administering Part Four, “structure” means a walled and roofed building, including a gas or liquid storage tank that is principally aboveground, as well as a manufactured home.
“Substantial damage”
means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed fifty percent of the market value of the structure before the damage occurred.
“Substantial improvement,”
for purposes of administering Part Four, means any repair, reconstruction, addition, or other improvement of a structure, the cost of which equals or exceeds fifty percent of the assessed value of the structure before the “start of construction” of the improvement. This term includes structures which have incurred “substantial damage,” regardless of the actual repair work performed. The term does not, however, include either:
1)
Any project for improvement to a structure to correct previously identified existing violations of state or local health, sanitary or safety code specifications that have been identified by the local code enforcement official and that are solely necessary to assure safe living conditions; or
2)
Any alteration of a “historic structure”; provided, that the alteration will not preclude the structure’s continued designation as a “historic structure.”
Use.
See “use” as defined in YMC Chapter 15.02.
“Utility equipment,”
for the purposes of Part Four, means all electrical, heating, ventilation, plumbing and air-conditioning equipment and other service facilities shall be designed and/or otherwise elevated or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
“Variance”
means a grant of relief by a community from the terms of a floodplain management regulation.
“Vegetative buffer” or “buffer”
means an area extending landward from the ordinary high water mark of a lake or stream and/or from the edge of a wetland which is maintained or otherwise allowed to provide support for the performance of the basic functional properties of a fish and wildlife habitat conservation area and wetlands as set forth in YMC §§ 15.27.504 and 15.27.603.
“Water surface elevation”
means the height in relation to vertical datum utilized in the applicable flood insurance study of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.
“Waters of the state”
are all lakes, rivers, ponds, streams, inland waters, underground waters, salt waters, and all other surface waters and watercourses within the jurisdiction of the state of Washington.
“Wetland”
means areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Wetlands do not include those artificial wetlands intentionally created from nonwetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. Wetlands may include those artificial wetlands intentionally created from nonwetland areas created to mitigate conversion of wetlands.
“Wildlife”
means all species of the animal kingdom whose members exist in Washington in a wild state, which includes, but is not limited to, any mammal, bird, reptile, amphibian, fish, or invertebrate, at any stage of development.
“Wildlife habitat”
means an area of climate, soils, vegetation, relationship to water, location and/or other physical properties which are identified as having a critical importance to the maintenance of wildlife species.
“Works”
means any dam, wall, wharf, embankment, levee, dike, berm, pile, bridge, improved road, abutment, projection, excavation, channel rectification, or improvement.
(Ord. 2008-46 § 1 (part), 2008; Ord. 2015-036 § 6, 2015; Ord. 2016-029 § 1 (Exh. A) (part), 2016; Ord. 2017-017 § 2 (Exh. B) (part), 2017; Ord. 2021-021 § 2 (Exh. A), 2021)