Actual final locations of wind turbine generators, below-ground electrical cables, and aboveground electrical transmission towers will be established during the micrositing process, occurring after permit review and prior to actual construction; provided, that all such facilities must be sited within the study corridors reviewed and approved by the county. During the micrositing process (when the final, exact locations of the turbines and other project elements and equipment are determined), the applicant will typically balance a number of technical and engineering factors, including limitations posed by the terrain, wind data (speed, wind shear, etc.), wake effects of turbines on others, feasibility of access, setbacks (internally established or based on permit requirements), geotechnical considerations (subsurface conditions), environmental restrictions (avoidance of sensitive habitat), cultural/archaeological restrictions (avoidance of cultural resource sites), telecommunications constraints (line of sight microwave paths), FAA requirements, and other site-specific criteria that are not fully resolved until final engineering is completed.