Zoneomics Logo
search icon

Arden Hills City Zoning Code

SECTION 1365

Building Permits and Certificates of Occupancy

1365.01 Building Permits.

   Subd. 1   No building permit or other permit pertaining to the use of land or buildings shall be issued unless such building is designed and arranged to conform to the provisions of this Section.
   Subd. 2   Every application for a building permit shall be accompanied by a site plan, drawn to scale showing actual dimensions of the lot or lots to be built upon, the location and size of the structures, improvement or use to be erected, altered or placed, location of required parking and loading areas, size of yards and open spaces, existing and proposed streets and alleys adjoining or within the lot and such other information required in this Chapter or in the Appendix A, Procedure Manual. The City may request a certified survey in addition to a site plan if deemed necessary by the City.

1365.02 Certificates of Occupancy.

   Subd. 1   No land shall be occupied or used and no building hereafter erected, reconstructed or structurally altered shall be occupied or used, in whole or in part, for any purpose whatsoever, until a certificate of occupancy has been issued by the Building Official, stating that the building and the use appears to comply with all of the provisions of this Code applicable to the building or premises of the use in the district in which it is to be located.
   Subd. 2   No change in use shall be made in any building or part thereof, now existing or hereafter erected, reconstructed or structurally altered, without a certificate of occupancy having been issued by the Building Official, and no such permit shall be issued to make such a change unless it is in conformity with the provisions of this chapter. Application for a certificate of occupancy shall be made with the application for a building permit and shall be issued within ten (10) days after the lawful erection, reconstruction or structural alteration is completed.