On every lot in a C-1, C-2 or I-1 district, and on any lot on which is conducted any public or semi-public use, there shall be space provided for the loading of goods and materials. Such spaces shall not be less than 10 feet in width nor 25 feet in length. Such space shall be provided with adequate
access to a public right-of-way.
(Ord. 2018-02 § 2 (Exh. A), 2018)