Commercial And Manufacturing Districts. In "C" and "M" Districts all provisions for the proposed building or structure and a detailed set of plans, its location on the lot, the basic materials of which it is to be constructed, and the details and type of construction to be used. The Building Inspector shall present to the City Council, at the next regularly scheduled Council meeting, a copy of the application along with the recommendation of the Building Inspector as to whether the building/zoning permit should be issued. The City Council shall consider the application and either approve the application, deny the application or continue consideration of the matter until the next regular meeting or any meeting thereafter as may be required so as to obtain additional or supplemental information as required. Upon the approval of any such building/zoning permit application, one (1) set of the plans as submitted with the application shall be retained by the Building Inspector or City Clerk as a permanent record and one (1) set shall be returned to the applicant if two (2) sets were so delivered. Additionally, for commercial or manufacturing buildings that exceed one hundred twenty-five thousand dollars ($125,000.00) in value, the drawings and plans shall be signed and sealed by an architect.