Whenever a wall, fence or berm is required within a buffer yard, these are shown as "structure required" in the following illustrations, wherein their respective specifications are also shown. All required structures shall be the responsibility of the higher-intensity use. Whenever a wall is required in addition to a berm, the wall shall be located between the berm and the higher-intensity use, in order to provide maximum sound absorption.