[Amended 3-11-2013 by Ord. No. 13-04]
In addition to submission of all other forms, site plans, plans, and other documentation required for an application by this chapter, all applicants for a conditional use permit for the installation, construction, erection, movement, reconstruction, or modification of any WT facilities shall also submit a needs analysis. The needs analysis shall contain documentary evidence demonstrating the need for the proposed installation, construction, erection, movement, reconstruction or modification of any WT facilities within the Borough. This evidence shall include, at a minimum:
A. The WT service provider's wireless telecommunications network layout and coverage area for a radius of at least five miles from the location where the WT facilities are planned, identifying all locations:
(1) In operation as of the filing date of the conditional use permit application;
(2) Under construction as of the filing date of the conditional use permit application; and
(3) Pending approval before any licensing authority as of the filing date of the conditional use permit application.
B. All results and supporting data derived from tests which must be conducted to determine before and after signal strength plots. These results and data:
(1) Shall demonstrate the actual existing signal coverage in effect at the time of application, contrasted with the proposed signal coverage which would result from the proposed installation, construction, erection, movement, reconstruction, or modification of WT facilities within the Borough of Chatham; and
(2) Shall be certified by a qualified radio frequency engineer. The Borough reserves the right to retain a radio frequency engineer on its own behalf at applicant's expense to review the results or data submitted by the application.
C. A search ring of the zone in which the WT facilities are proposed, prepared by a qualified radio frequency engineer and overlaid on an appropriate background map, demonstrating the area within the zone where the WT facilities need to be located in order to provide reasonably necessary signal strength and coverage to the target cell.
D. In connection with the signal strength plots and search ring described above, the applicant must provide a report prepared by a qualified radio frequency engineer which explains why the proposed location was selected and which specifically addresses at a minimum:
(1) If the applicant proposes to install, construct, erect, move, reconstruct or modify a WT antenna upon an existing structure or building, including poles used for power, telecommunications and the like, why it is reasonably necessary to locate that WT antenna within the Borough of Chatham.
(2) If the applicant proposes to install, construct, erect, move, reconstruct or modify a WT antenna upon an existing WT tower, applicant must show:
(a) Why it is reasonably necessary to locate that WT antenna within the Borough of Chatham; and
(b) Why it is not reasonably practicable to locate or collocate that WT antenna upon an existing building or structure within the zone.
(3) If the applicant proposes to install, construct or erect a WT antenna upon a new WT tower, applicant must show:
(a) Why it is reasonably necessary to locate that WT antenna within the Borough of Chatham;
(b) Why it is not reasonably practicable to locate or collocate that WT antenna upon an existing building or structure within the zone; and
(c) Why it is not reasonably practicable to locate or collocate that WT antenna upon an existing WT tower within the zone.
(4) These requirements do not apply to changing the direction of any existing WT antenna.
E. An affidavit from applicant or an officer of applicant describing the frequency and power at which the proposed WT facilities are expected to operate and the authority by which they were granted.