M-1, M-2 and M-3 Industrial Districts; Gateway Overlay District.
M-1 District | M-2 District | M-3 District | |
|---|---|---|---|
Maximum Height | |||
Stories (maximum) | 2.5 | 2.5 | 2.5 |
Stories (minimum) | 2.0 | None | 2.0 |
Feet | 35 | 40 | 35 |
Principal building minimum | |||
Lot area | 5,000 square feet | 5 acres | 5,000 square feet |
Side yards (each) (feet) | 102 | 252 | 102 |
Front yards (feet) | 10 | 100 | 10 |
Rear yard buffer1 (feet) | 15 | 25 | 15 |
Accessory structures | |||
Minimum side yard (feet) | 5 | 15 | 5 |
Minimum rear yard (feet) | 10 | 15 | 10 |
Maximum height (feet) | 15 | 15 | 15 |
Total Development Maximum | |||
Lot coverage (percent) | 80% | 20% | 75% |
NOTES: | |
|---|---|
1 | Buffers are required along all lot lines between M Zones and residential zoning districts (except where said lot lines coincide with existing railroad rights-of-way) and all lot lines/properties in the M Zones that abut the Passaic River. Required buffers shall consist of screening with a minimum width of 15 feet; there shall be no debris, structures, parking or storage permitted in the buffer area. All buffers shall be planted and maintained with native plantings, trees, shrubs and plant material at least five feet in height at time of planting. Depending on the location, a fence may also be required. |
2 | Whenever a lot developed with nonresidential uses in the M-1 or M-3 Districts abuts a residential district (except when adjoining lot lines coincide with existing railroad rights-of-way), all buildings shall be set back at least 25 feet from the residential district boundary line. In the M-2 District, this setback shall be at least 35 feet. |
Block | Lot(s) |
|---|---|
135 | 1, 2, 3, 4, 5, 6, 7, 8 |
136 | 1, 2, 3, 4, 5, 6 |
137 | 1, 2, 3, 4, 5 |
138 | 1, 2, 3, 4, 5, 6, 7 |
139 | 1, 2, 3, 4, 5, 6, 7 |
140 | 1, 2, 3, 4, 5, 6, 7.01, 7.02, 8, 9, 10, 17 |
Block | Lot(s) |
|---|---|
140 | 11, 12, 12.01, 13, 14, 15, 16 |
M-1, M-2 and M-3 Industrial Districts; Gateway Overlay District.
M-1 District | M-2 District | M-3 District | |
|---|---|---|---|
Maximum Height | |||
Stories (maximum) | 2.5 | 2.5 | 2.5 |
Stories (minimum) | 2.0 | None | 2.0 |
Feet | 35 | 40 | 35 |
Principal building minimum | |||
Lot area | 5,000 square feet | 5 acres | 5,000 square feet |
Side yards (each) (feet) | 102 | 252 | 102 |
Front yards (feet) | 10 | 100 | 10 |
Rear yard buffer1 (feet) | 15 | 25 | 15 |
Accessory structures | |||
Minimum side yard (feet) | 5 | 15 | 5 |
Minimum rear yard (feet) | 10 | 15 | 10 |
Maximum height (feet) | 15 | 15 | 15 |
Total Development Maximum | |||
Lot coverage (percent) | 80% | 20% | 75% |
NOTES: | |
|---|---|
1 | Buffers are required along all lot lines between M Zones and residential zoning districts (except where said lot lines coincide with existing railroad rights-of-way) and all lot lines/properties in the M Zones that abut the Passaic River. Required buffers shall consist of screening with a minimum width of 15 feet; there shall be no debris, structures, parking or storage permitted in the buffer area. All buffers shall be planted and maintained with native plantings, trees, shrubs and plant material at least five feet in height at time of planting. Depending on the location, a fence may also be required. |
2 | Whenever a lot developed with nonresidential uses in the M-1 or M-3 Districts abuts a residential district (except when adjoining lot lines coincide with existing railroad rights-of-way), all buildings shall be set back at least 25 feet from the residential district boundary line. In the M-2 District, this setback shall be at least 35 feet. |
Block | Lot(s) |
|---|---|
135 | 1, 2, 3, 4, 5, 6, 7, 8 |
136 | 1, 2, 3, 4, 5, 6 |
137 | 1, 2, 3, 4, 5 |
138 | 1, 2, 3, 4, 5, 6, 7 |
139 | 1, 2, 3, 4, 5, 6, 7 |
140 | 1, 2, 3, 4, 5, 6, 7.01, 7.02, 8, 9, 10, 17 |
Block | Lot(s) |
|---|---|
140 | 11, 12, 12.01, 13, 14, 15, 16 |