25 SPECIAL USE PERMITS
Table 22.25.010-1. Conditional Use Permit Application Requirements | |||
|---|---|---|---|
Conditional Uses | Bed and Breakfast Conditional Uses | Short-Term Rental Conditional Uses | Island Conditional Uses |
The applicant may be required to consult with agencies that are responsible for certain portions of the project review. These agencies may include but not be limited to public works and engineering for sewer/water utilities; state DOT/PF; State Department of Environmental Conservation; Army Corps of Engineers; Sitka fire department; local telephone utility; cable television utility; electric department. | |||
Written Documentation • Legal description of all properties involved in the project; • Statement of the objectives expected to be achieved by the project; • Detailed description of all aspects of the project, including land use, building types and sizes, population density, parking and traffic circulation, building coverage and other information which the applicant feels would assist in decision making; • All comments received from each of the agencies and utilities reviewing the project and a statement by the applicant on how the applicant will resolve or meet any problems or anticipated adverse conditions noted by the utility or agency, the statement to list any unresolved problems or adverse conditions. | Written Documentation • Legal description of all property involved in the project; • Statement of the objectives expected to be achieved by the project. | Written Documentation • Legal description of all property involved in the project; • Statement of the objectives expected to be achieved by the project. | Written Documentation • Legal description of all properties involved in the project; • Statement of the objectives expected to be achieved by the project; • Detailed description of all aspects of the project, including land use, building types and sizes, population density, building coverage, waterfront use, clearing, changes to existing visual appearance, and other information which the applicant feels would assist in decision making; • All comments received from each of the agencies and utilities reviewing the project and a statement by the applicant on how the applicant will resolve or meet any problems or anticipated adverse conditions noted by the utility or agency, the statement to list any unresolved problems or adverse conditions. |
Site Plan and Supporting Drawings • As determined by the administration, details of the proposed project showing land use layout, building locations, vehicular and pedestrian circulation, open space and recreation areas, parking layout, schematic water and sewer layout, and any other information necessary to adequately describe the project; • Preliminary subdivision plat layout if required; • Site grading and drainage plan including present and proposed topography; • Conceptual drawings of proposed buildings, signs, and other features that may be required by the administrator. | Site Plan and Supporting Drawings • As determined by the administration, details of the proposed project showing building locations, vehicular and pedestrian circulation, parking layout, and any other information necessary to adequately describe the project; conceptual drawings of proposed buildings or renovations, signs, and other features that may be required by the administrator. | Site Plan and Supporting Drawings • As determined by the administration, details of the proposed project showing building locations, vehicular and pedestrian circulation, parking layout, and any other information necessary to adequately describe the project; conceptual drawings of proposed buildings or renovations, signs, and other features that may be required by the administrator. | Site Plan and Supporting Drawings • As determined by the administration, details of the proposed project showing land use layout, building locations, open space and recreation areas, waterfront development, clearing, schematic water and sewer layout, and any other information necessary to adequately describe the project; • Preliminary subdivision plat layout if required; • Site grading and drainage plan including present and proposed topography; conceptual drawings of proposed buildings, and other features that may be required by the administrator. |
Table 22.25.010-2. Initiation and Termination Periods | ||||
|---|---|---|---|---|
Short-Term Rental Conditional Use Permits | Bed and Breakfast Conditional Use Permits | Interim Mobile Homes Conditional Use | All Other Conditional Use Permits | |
Period in which the permit must be activated following planning commission approval or permit becomes void | One year | One year | One year | Two years |
If permit is not used during period, permit becomes void after activation | One year | One year | One year | Two years |
Mandatory review period1 | Set by planning commission at time of approval | Set by planning commission at time of approval | Set by planning commission at time of approval | Set by planning commission at time of approval |
Number of years after approval that permit sunsets | Set by planning commission at time of approval | Set by planning commission at time of approval | Set by planning commission at time of approval | Set by planning commission at time of approval |
Whether permit is transferable upon sale or transfer of ownership of subject property | No | No | Yes | Yes |
Notes: |
|---|
Note (1): It shall be the responsibility of the applicant to submit materials one month prior to the end of any review period. Failure to submit materials within the time specified shall automatically void the approval. |
Note (2): Substantial construction progress must be made on a project approved through the variance process within one year of the date of the variance approval or the approval becomes void. In the event it can be documented that other substantial progress has been made, a one-year extension may be granted by the planning commission if a request is filed within 11 months of the initial approval. |
25 SPECIAL USE PERMITS
Table 22.25.010-1. Conditional Use Permit Application Requirements | |||
|---|---|---|---|
Conditional Uses | Bed and Breakfast Conditional Uses | Short-Term Rental Conditional Uses | Island Conditional Uses |
The applicant may be required to consult with agencies that are responsible for certain portions of the project review. These agencies may include but not be limited to public works and engineering for sewer/water utilities; state DOT/PF; State Department of Environmental Conservation; Army Corps of Engineers; Sitka fire department; local telephone utility; cable television utility; electric department. | |||
Written Documentation • Legal description of all properties involved in the project; • Statement of the objectives expected to be achieved by the project; • Detailed description of all aspects of the project, including land use, building types and sizes, population density, parking and traffic circulation, building coverage and other information which the applicant feels would assist in decision making; • All comments received from each of the agencies and utilities reviewing the project and a statement by the applicant on how the applicant will resolve or meet any problems or anticipated adverse conditions noted by the utility or agency, the statement to list any unresolved problems or adverse conditions. | Written Documentation • Legal description of all property involved in the project; • Statement of the objectives expected to be achieved by the project. | Written Documentation • Legal description of all property involved in the project; • Statement of the objectives expected to be achieved by the project. | Written Documentation • Legal description of all properties involved in the project; • Statement of the objectives expected to be achieved by the project; • Detailed description of all aspects of the project, including land use, building types and sizes, population density, building coverage, waterfront use, clearing, changes to existing visual appearance, and other information which the applicant feels would assist in decision making; • All comments received from each of the agencies and utilities reviewing the project and a statement by the applicant on how the applicant will resolve or meet any problems or anticipated adverse conditions noted by the utility or agency, the statement to list any unresolved problems or adverse conditions. |
Site Plan and Supporting Drawings • As determined by the administration, details of the proposed project showing land use layout, building locations, vehicular and pedestrian circulation, open space and recreation areas, parking layout, schematic water and sewer layout, and any other information necessary to adequately describe the project; • Preliminary subdivision plat layout if required; • Site grading and drainage plan including present and proposed topography; • Conceptual drawings of proposed buildings, signs, and other features that may be required by the administrator. | Site Plan and Supporting Drawings • As determined by the administration, details of the proposed project showing building locations, vehicular and pedestrian circulation, parking layout, and any other information necessary to adequately describe the project; conceptual drawings of proposed buildings or renovations, signs, and other features that may be required by the administrator. | Site Plan and Supporting Drawings • As determined by the administration, details of the proposed project showing building locations, vehicular and pedestrian circulation, parking layout, and any other information necessary to adequately describe the project; conceptual drawings of proposed buildings or renovations, signs, and other features that may be required by the administrator. | Site Plan and Supporting Drawings • As determined by the administration, details of the proposed project showing land use layout, building locations, open space and recreation areas, waterfront development, clearing, schematic water and sewer layout, and any other information necessary to adequately describe the project; • Preliminary subdivision plat layout if required; • Site grading and drainage plan including present and proposed topography; conceptual drawings of proposed buildings, and other features that may be required by the administrator. |
Table 22.25.010-2. Initiation and Termination Periods | ||||
|---|---|---|---|---|
Short-Term Rental Conditional Use Permits | Bed and Breakfast Conditional Use Permits | Interim Mobile Homes Conditional Use | All Other Conditional Use Permits | |
Period in which the permit must be activated following planning commission approval or permit becomes void | One year | One year | One year | Two years |
If permit is not used during period, permit becomes void after activation | One year | One year | One year | Two years |
Mandatory review period1 | Set by planning commission at time of approval | Set by planning commission at time of approval | Set by planning commission at time of approval | Set by planning commission at time of approval |
Number of years after approval that permit sunsets | Set by planning commission at time of approval | Set by planning commission at time of approval | Set by planning commission at time of approval | Set by planning commission at time of approval |
Whether permit is transferable upon sale or transfer of ownership of subject property | No | No | Yes | Yes |
Notes: |
|---|
Note (1): It shall be the responsibility of the applicant to submit materials one month prior to the end of any review period. Failure to submit materials within the time specified shall automatically void the approval. |
Note (2): Substantial construction progress must be made on a project approved through the variance process within one year of the date of the variance approval or the approval becomes void. In the event it can be documented that other substantial progress has been made, a one-year extension may be granted by the planning commission if a request is filed within 11 months of the initial approval. |