The uses and structures listed in each district, with the exception of the Aquifer Protection District, which require conditional permits are recognized as potentially desirable for the town. However, the uses and structures requiring conditional permits may, because of their nature, present some degree of hazard or danger to the Town and its people. In the Aquifer Protection District, special permits shall be considered pursuant to Article X.
The purpose of this article is to establish guidelines for the Planning Board to use in determining whether or not a conditional permit should be issued.
§ 178-74 Application procedure; Planning Board review and decision.
Application shall be made to the Zoning Officer and shall include detailed site plan to scale. Topographic information may be required in certain instances. With each application a fee shall be paid in the amount as set forth from time to time by Town Board resolution, except with an application for a change in use, in which case a fee in a different amount as set forth from time to time by Town Board resolution shall be paid.
[Amended 4-1-1987 by L.L. No. 4-1987; 8-5-1998 by L.L. No. 2-1998]
At its next regular meeting following application, the Planning Board shall review the plan and give tentative approval or ask for revisions or for more detail. More detail may include complete architectural drawings of proposed structures and landscaping. (At the same time the Planning Board may set a date for a final review of the application).
Within five days of first review, the Planning Board shall refer the application to the Cortland County Planning Board along with Town comments and recommendations (if required by General Municipal Law) and set a date for final review.
The Planning Board may conduct a public hearing on the application. If a public hearing is considered desirable by a majority of the authorized members of the Planning Board, such public hearing shall be conducted within 45 days of the acceptance of the application and shall be advertised in a newspaper of general circulation in the Town at least five days before the public hearing.
The Town Planning Board will take no final action until it has received comments and recommendations from the County Planning Board or 45 days have passed from the date of submittal to the County Planning Board, if such is required by General Municipal Law § 239.
The Town Planning Board will make a factual record of all proceedings in issuing a conditional permit, and such record shall contain the reasons for the decision.
If approval or conditional approval is given, a building permit shall be authorized at such time as all conditions are met. Application to the Zoning Officer for any building permit or certificate of zoning compliance authorized by resolution of the Planning Board under which a conditional permit is granted shall be made within 60 days from the date the resolution is filed with the Town Clerk or within a time period agreed upon by the applicant and the Planning Board. If a building permit is not applied for within this time frame or a building permit has expired, the applicant shall submit a new application to the Planning Board.
[Amended 8-17-1988 by L.L. No. 2-1988; amended 12-16-2009 by L.L. No. 3-2009]
The Planning Board, on its own motion, may revoke any conditional permit for noncompliance with conditions set forth in the granting of said permit after first holding a public hearing and giving notice of such hearing as provided in § 178-74C. The foregoing shall not be the exclusive remedy, and it shall be unlawful and punishable hereunder for any person to violate any condition imposed by a conditional permit.
[Added 8-17-1988 by L.L. No. 2-1988]
§ 178-75 Structure/use requirements for permit approval.
Provides a suitable transition when located between differing uses or districts where none is provided or provides a visual buffer by landscaped green areas or fencing.
Provides for safe handling of vehicular traffic to and from the site without causing congestion. No new vehicular entrances shall be permitted within 50 feet of an existing intersection.
Enhances neighboring property and does not lead to depreciation of properties (by reason of noise, traffic, dust, fumes, smoke, odor, fire, glare, flashing lights or sewage disposal).
In granting a conditional use, the Planning Board shall make findings of fact consistent with the provisions of this chapter. The Planning Board shall not approve a conditional use except in conformity with the spirit, purposes, conditions and standards outlined in this chapter. In order to obtain the Planning Board's approval of a conditional permit, the applicant must prove that the location, structure, and/or use:
Is suitable for the property in question and designed to be constructed, operated, and maintained so as to be in harmony with and appropriate in appearance with the existing or intended character of the general vicinity.
Multifamily dwellings with over four dwelling units must have two means of egress and ingress, unless, at the approval of the Cortlandville Code Office and Cortlandville Board of Fire Commissioners, the building is equipped with proper fire prevention equipment pursuant to the New York State Fire Code, Appendix D, Fire Apparatus Access Roads, Section D105.1.
In the B2 and B3 District, multiple-family is only allowed as a mixed use with commercial. For one-story structures the commercial use shall have a minimum of 50% of the gross floor area in use for business. For multistory buildings the commercial use shall have a minimum gross floor area equal to the story with the greatest floor area. For projects with multiple structures, these percentages shall apply to gross square footage allowing for a mix of commercial and residential structures.
Sufficient visual and sound screening shall be provided between activities and adjacent residential neighborhoods to limit noise and sight disturbances.
Health, medical and care services. Hospital and clinic emergency traffic entrances shall have sufficient capacity to handle loads without interrupting neighboring traffic patterns. Entrances to parking areas shall be of sufficient width for two-way traffic or shall have separate entrance and exit locations.
Utility substations shall be screened with vegetative material from adjacent residential and commercial properties and shall be adequately fenced to prevent entry by unauthorized personnel.
Entrances to warehousing, bus and truck terminals shall be of sufficient width to allow turns out into the nearest traffic lane without necessitating a swing into another lane.
In residential neighborhoods, all new utility lines shall be underground to the maximum extent possible. Where existing services use poles, this condition may be waived, at the discretion of the Planning Board.
Communication antennas and towers shall be located so as not to interfere with adjacent property's solar access. Siting of facilities over 30 feet in height will not be permitted in residential neighborhoods.
Commercial garages, gasoline service stations, automotive repair shops and other facilities storing petroleum products on-site shall have tanks tested in accordance with Cortland County Health Department requirements and NFPA 329 or latest NFPA code on testing of underground storage tanks. Above-ground petroleum storage shall be placed within impervious containment structures a minimum of 30 feet from any structure or property line.
Uses and/or activities such as but not limited to the storage of or use of chemicals of any form or quantity shall not pose a significant threat to the Town of Cortlandville's sole source aquifer or its delineated wellhead protection zones.
Buildings shall be architecturally designed to enhance or be compatible with surrounding structures in terms of form, function, and design. Structures will be consistent with the aesthetic general intent of the Town's current Master Plan.
Structures and uses will have adequate buffers to prevent negative impacts associated with noise, traffic, dust, fumes, smoke, odor, fire, glare, and/or flashing lights.
The use will have adequate site access to protect streets from undue congestion and hazard and will not cause unsuitable effects on highway traffic and safety.
The production from raw materials of cement, explosives, fertilizer, rubber, soaps, starch and the by-products of coal, coke, petroleum and natural gas.
The milling or processing of flour; the reduction, refining, smelting and alloying of metal or metal ores; the distillation of wood or bones; and the reduction and processing of wood pulp and fiber.
Storage of crude oil or any of its volatile products or other highly inflammable liquids except in accordance with the laws and regulations of the State of New York, and all such tanks shall be properly diked with dikes having a capacity equal to 1 1/2 times the capacity of tank or tanks surrounded.
Visible grey smoke of a shade darker than No. 1 as shown on the Power's Micro-Ringelmann Chart, McGraw-Hill Publishing Co., 1954, except that visible grey smoke of a shade not darker than No. 2 on said chart may be emitted for not more more than four minutes in any 30 minutes. These provisions, applicable to a visible grey smoke, shall also apply to visible smoke of a different color but with an equivalent apparent density.
Emissions from any chimney or other orifice which can cause any damage to health, to animals or vegetation, or other forms of property or which can cause any excessive soiling at any point, and in no event any emission, from any chimney or otherwise, of any solid or liquid particles in concentrations exceeding 0.3 grains per cubic foot of the conveying gas or air at any point. For measurement of an amount of particles in gases resulting from combustion, standard corrections shall be applied to a stack temperature of 500° F. and 50% excess air.
Discharges into any private sewage disposal system or stream, or into the ground, of any materials of such a nature or temperature as can contaminate any watercourse or supply, or can cause any dangerous or unhealthy condition, except:
In the event that approval is not required from such department, upon conformity to standards equivalent to those approved by such department or board for similar situations.
The uses and structures listed in each district, with the exception of the Aquifer Protection District, which require conditional permits are recognized as potentially desirable for the town. However, the uses and structures requiring conditional permits may, because of their nature, present some degree of hazard or danger to the Town and its people. In the Aquifer Protection District, special permits shall be considered pursuant to Article X.
The purpose of this article is to establish guidelines for the Planning Board to use in determining whether or not a conditional permit should be issued.
§ 178-74 Application procedure; Planning Board review and decision.
Application shall be made to the Zoning Officer and shall include detailed site plan to scale. Topographic information may be required in certain instances. With each application a fee shall be paid in the amount as set forth from time to time by Town Board resolution, except with an application for a change in use, in which case a fee in a different amount as set forth from time to time by Town Board resolution shall be paid.
[Amended 4-1-1987 by L.L. No. 4-1987; 8-5-1998 by L.L. No. 2-1998]
At its next regular meeting following application, the Planning Board shall review the plan and give tentative approval or ask for revisions or for more detail. More detail may include complete architectural drawings of proposed structures and landscaping. (At the same time the Planning Board may set a date for a final review of the application).
Within five days of first review, the Planning Board shall refer the application to the Cortland County Planning Board along with Town comments and recommendations (if required by General Municipal Law) and set a date for final review.
The Planning Board may conduct a public hearing on the application. If a public hearing is considered desirable by a majority of the authorized members of the Planning Board, such public hearing shall be conducted within 45 days of the acceptance of the application and shall be advertised in a newspaper of general circulation in the Town at least five days before the public hearing.
The Town Planning Board will take no final action until it has received comments and recommendations from the County Planning Board or 45 days have passed from the date of submittal to the County Planning Board, if such is required by General Municipal Law § 239.
The Town Planning Board will make a factual record of all proceedings in issuing a conditional permit, and such record shall contain the reasons for the decision.
If approval or conditional approval is given, a building permit shall be authorized at such time as all conditions are met. Application to the Zoning Officer for any building permit or certificate of zoning compliance authorized by resolution of the Planning Board under which a conditional permit is granted shall be made within 60 days from the date the resolution is filed with the Town Clerk or within a time period agreed upon by the applicant and the Planning Board. If a building permit is not applied for within this time frame or a building permit has expired, the applicant shall submit a new application to the Planning Board.
[Amended 8-17-1988 by L.L. No. 2-1988; amended 12-16-2009 by L.L. No. 3-2009]
The Planning Board, on its own motion, may revoke any conditional permit for noncompliance with conditions set forth in the granting of said permit after first holding a public hearing and giving notice of such hearing as provided in § 178-74C. The foregoing shall not be the exclusive remedy, and it shall be unlawful and punishable hereunder for any person to violate any condition imposed by a conditional permit.
[Added 8-17-1988 by L.L. No. 2-1988]
§ 178-75 Structure/use requirements for permit approval.
Provides a suitable transition when located between differing uses or districts where none is provided or provides a visual buffer by landscaped green areas or fencing.
Provides for safe handling of vehicular traffic to and from the site without causing congestion. No new vehicular entrances shall be permitted within 50 feet of an existing intersection.
Enhances neighboring property and does not lead to depreciation of properties (by reason of noise, traffic, dust, fumes, smoke, odor, fire, glare, flashing lights or sewage disposal).
In granting a conditional use, the Planning Board shall make findings of fact consistent with the provisions of this chapter. The Planning Board shall not approve a conditional use except in conformity with the spirit, purposes, conditions and standards outlined in this chapter. In order to obtain the Planning Board's approval of a conditional permit, the applicant must prove that the location, structure, and/or use:
Is suitable for the property in question and designed to be constructed, operated, and maintained so as to be in harmony with and appropriate in appearance with the existing or intended character of the general vicinity.
Multifamily dwellings with over four dwelling units must have two means of egress and ingress, unless, at the approval of the Cortlandville Code Office and Cortlandville Board of Fire Commissioners, the building is equipped with proper fire prevention equipment pursuant to the New York State Fire Code, Appendix D, Fire Apparatus Access Roads, Section D105.1.
In the B2 and B3 District, multiple-family is only allowed as a mixed use with commercial. For one-story structures the commercial use shall have a minimum of 50% of the gross floor area in use for business. For multistory buildings the commercial use shall have a minimum gross floor area equal to the story with the greatest floor area. For projects with multiple structures, these percentages shall apply to gross square footage allowing for a mix of commercial and residential structures.
Sufficient visual and sound screening shall be provided between activities and adjacent residential neighborhoods to limit noise and sight disturbances.
Health, medical and care services. Hospital and clinic emergency traffic entrances shall have sufficient capacity to handle loads without interrupting neighboring traffic patterns. Entrances to parking areas shall be of sufficient width for two-way traffic or shall have separate entrance and exit locations.
Utility substations shall be screened with vegetative material from adjacent residential and commercial properties and shall be adequately fenced to prevent entry by unauthorized personnel.
Entrances to warehousing, bus and truck terminals shall be of sufficient width to allow turns out into the nearest traffic lane without necessitating a swing into another lane.
In residential neighborhoods, all new utility lines shall be underground to the maximum extent possible. Where existing services use poles, this condition may be waived, at the discretion of the Planning Board.
Communication antennas and towers shall be located so as not to interfere with adjacent property's solar access. Siting of facilities over 30 feet in height will not be permitted in residential neighborhoods.
Commercial garages, gasoline service stations, automotive repair shops and other facilities storing petroleum products on-site shall have tanks tested in accordance with Cortland County Health Department requirements and NFPA 329 or latest NFPA code on testing of underground storage tanks. Above-ground petroleum storage shall be placed within impervious containment structures a minimum of 30 feet from any structure or property line.
Uses and/or activities such as but not limited to the storage of or use of chemicals of any form or quantity shall not pose a significant threat to the Town of Cortlandville's sole source aquifer or its delineated wellhead protection zones.
Buildings shall be architecturally designed to enhance or be compatible with surrounding structures in terms of form, function, and design. Structures will be consistent with the aesthetic general intent of the Town's current Master Plan.
Structures and uses will have adequate buffers to prevent negative impacts associated with noise, traffic, dust, fumes, smoke, odor, fire, glare, and/or flashing lights.
The use will have adequate site access to protect streets from undue congestion and hazard and will not cause unsuitable effects on highway traffic and safety.
The production from raw materials of cement, explosives, fertilizer, rubber, soaps, starch and the by-products of coal, coke, petroleum and natural gas.
The milling or processing of flour; the reduction, refining, smelting and alloying of metal or metal ores; the distillation of wood or bones; and the reduction and processing of wood pulp and fiber.
Storage of crude oil or any of its volatile products or other highly inflammable liquids except in accordance with the laws and regulations of the State of New York, and all such tanks shall be properly diked with dikes having a capacity equal to 1 1/2 times the capacity of tank or tanks surrounded.
Visible grey smoke of a shade darker than No. 1 as shown on the Power's Micro-Ringelmann Chart, McGraw-Hill Publishing Co., 1954, except that visible grey smoke of a shade not darker than No. 2 on said chart may be emitted for not more more than four minutes in any 30 minutes. These provisions, applicable to a visible grey smoke, shall also apply to visible smoke of a different color but with an equivalent apparent density.
Emissions from any chimney or other orifice which can cause any damage to health, to animals or vegetation, or other forms of property or which can cause any excessive soiling at any point, and in no event any emission, from any chimney or otherwise, of any solid or liquid particles in concentrations exceeding 0.3 grains per cubic foot of the conveying gas or air at any point. For measurement of an amount of particles in gases resulting from combustion, standard corrections shall be applied to a stack temperature of 500° F. and 50% excess air.
Discharges into any private sewage disposal system or stream, or into the ground, of any materials of such a nature or temperature as can contaminate any watercourse or supply, or can cause any dangerous or unhealthy condition, except:
In the event that approval is not required from such department, upon conformity to standards equivalent to those approved by such department or board for similar situations.