Overlay Districts
Permanent construction does not include land preparation (such as clearing, excavation, grading or filling), the installation of streets or walkways, excavation for a basement, footings, piers or foundations, the erection of temporary forms or the installation of accessory buildings such as garages or sheds not occupied as dwelling units or not part of the main building. For a substantial improvement, the actual "start of construction" means the first alteration of any wall, ceiling, floor or other structural part of a building, whether or not that alteration affects the external dimensions of the building. [Base Code, Chapter 2, Section 202] |
FEMA Region I Risk Analysis Branch Chief |
And copy of notification to: |
Massachusetts NFIP State Coordinator MA Dept. of Conservation & Recreation |
Table 9 - Use Regulations Wireless Communications | |
|---|---|
Indoor Wireless Communications Link | Allowed* |
Accessory Wireless Communications Link | Special Permit** |
Building Mounted Wireless Communications Link | Special Permit** |
Wireless Communications Link mounted on Existing, Free-standing Structure | Special Permit** |
Free-standing, Exterior Wireless Communications Link | Special Permit** |
* | Allowed as of right subject to dimensional and performance requirements. |
Allowed within an existing structure in the Central Business District. | |
** | May be permitted by Special Permit from the Zoning Board of Appeals. |
Map/Block | Map/Block | Map/Block | Map/Block | Map/Block |
|---|---|---|---|---|
91-4 | 91-8 | 91-42 | 91-48 | 107-66 |
91-5 | 91-9 | 91-44 | 107-58 | 107-105 |
91-7-1020 | 91-26A | 91-45 | 107-64 | 107-108 |
91-26B | 91-47 | 107-65 | 107-109 |
Overlay Districts
Permanent construction does not include land preparation (such as clearing, excavation, grading or filling), the installation of streets or walkways, excavation for a basement, footings, piers or foundations, the erection of temporary forms or the installation of accessory buildings such as garages or sheds not occupied as dwelling units or not part of the main building. For a substantial improvement, the actual "start of construction" means the first alteration of any wall, ceiling, floor or other structural part of a building, whether or not that alteration affects the external dimensions of the building. [Base Code, Chapter 2, Section 202] |
FEMA Region I Risk Analysis Branch Chief |
And copy of notification to: |
Massachusetts NFIP State Coordinator MA Dept. of Conservation & Recreation |
Table 9 - Use Regulations Wireless Communications | |
|---|---|
Indoor Wireless Communications Link | Allowed* |
Accessory Wireless Communications Link | Special Permit** |
Building Mounted Wireless Communications Link | Special Permit** |
Wireless Communications Link mounted on Existing, Free-standing Structure | Special Permit** |
Free-standing, Exterior Wireless Communications Link | Special Permit** |
* | Allowed as of right subject to dimensional and performance requirements. |
Allowed within an existing structure in the Central Business District. | |
** | May be permitted by Special Permit from the Zoning Board of Appeals. |
Map/Block | Map/Block | Map/Block | Map/Block | Map/Block |
|---|---|---|---|---|
91-4 | 91-8 | 91-42 | 91-48 | 107-66 |
91-5 | 91-9 | 91-44 | 107-58 | 107-105 |
91-7-1020 | 91-26A | 91-45 | 107-64 | 107-108 |
91-26B | 91-47 | 107-65 | 107-109 |