05: ENGINEERING AND DESIGN STANDARDS AND CONSTRUCTION STANDARDS

















View
|
Scale
|
Plans view | 1" = 50' |
Profile view, horizontal | 1" = 50' (or match plan view scale) |
Profile view, vertical | 1" = 50' |
Stational interview | 100 feet or 50 feet |
Table 5-1. Curb Return Radius at Intersections*
| |
Street Classification | Radius in Feet(1) |
Arterial | ** |
Local | 10 |
Major collector | 15 |
Minor collector | 15 |
* Measured from back of curb ** Per AASHTO standards or approved engineering analysis (1) Minimum radius, may be larger based on engineering justification. | |
Table 5-2. Street Design Standards/Criteria
| ||||
Design/Standard Criteria | Street Type | |||
Arterial | Collector Ordinary | Local | ||
Major | Minor | |||
Table 5-2. Street Design Standards/Criteria
| ||||
Design/Standard Criteria | Street Type | |||
Arterial | Collector Ordinary | Local | ||
Major | Minor | |||
Angle at intersection centerline (maximum) | ** | 85° | 75° | 75° |
Centerline radius on curves (minimum) | ** | 250' | 200' | 100' |
Cul-de-sac length | NA | NA | NA | 600' |
K Factor (minimum) | (1) | (1) | (1) | (1) |
Length of tangent at intersection | ** | 150' | 100' | 75' |
Maximum grade | 6% | 8% | 10% | 12% |
Maximum grade within 75' of intersection centerline | ** | 3% | 4% | 5% |
Minimum grade | ** | 0.5% | 0.5% | 0.5% |
Minimum design speed (mph) | 40 | 35 | 25 | 20 |
Standard street crown | 2% | 3% | 3% | 3% |
Stopping sight distance (minimum) | (1) | (1) | (1) | (1) |
Tangent length between reverse curves | ** | 150' | 100' | 50' |
Vertical curve required when algebraic difference in grade greater than | 1% | 1% | 1.5% | 2% |
** All design criteria per AASHTO standards (1) Per AASHTO based on design speed | ||||
Test Specification/Material
|
Test Method
|
Minimum Required Frequency
|
Test Specification/Material
|
Test Method
|
Minimum Required Frequency
|
Asphalt Concrete Pavement | ||
Asphalt concrete pavement (base course and surface course) | Asphalt oil content | 1 test/first day or 1/1000 TN |
Gradation | 1 test/first day or 1/1000 TN | |
Marshal test | 1 test/day or 1/1500 TN | |
Mix design | 1 submittal | |
Rice specific gravity (MPWSS 02510) | 1 test/day or 1/1500 TN | |
Compaction of asphalt concrete pavement | In-place density/thickness (MPWSS 02510) | 1 core/day or 1core/500 TN |
Earthworks | ||
Compaction of crushed base course for roadways | In-place density (MPWSS 02235/1.3) 95% minimum | 1 test/lift/4,00 square feet |
Compaction of crushed base course under curbs, gutters and sidewalks | In-place density (MPWSS 02235/1.3) 95% minimum | 1 test/lift/200 LF (C & G) or 1 test/lift/1,000 square feet (flatwork) |
Compaction of subbase course for roadways | In-place density (MPWSS 02234/1.3) 95% minimum | 1 test/lift/4,000 square feet |
Compaction of subgrade and embarkment for roadways | In-place density (MPWSS 02230/1.3) 95% minimum | 1 test/lift/4,000 square feet |
Compaction of subgrade under curbs, gutters and sidewalks | In-place density (MPWSS 02230/1.3) 95% minimum | 1 test/lift/200 LF (C & G) or 1 test/lift/1,000 square feet (flatwork) |
Crushed base course | Gradation - moisture density - fractured faces (crushed) - LA abrasion, LL, PL and PI (MPWSS 02235) | 1 submittal |
Pipe bedding | Type I bedding gradation and plasticity index/type II bedding gradation (MPWSS 02221) | 1 submittal |
Subbase course | Gradation - moisture density - fractured faces (crushed) - LA abrasion, LL, PL and PI (MPWSS 02234) | 1 sbmittal |
Subgrade and embankment | Moisture-density (MPWSS 02230) | 1 submittal per soil type encountered/1 submittal per borrow source |
Trench backfill | Moisture-density (MPWSS 02221) | 1 sub/soil type encountered 1 submittal/borrow source |
Trench compaction | In-place density (MPWSS 02221/1.4) 97% minimum | 1 test/lift/200 LF |
Trench compaction (laterals outside the road template, structures, valves, hydrants and manholes) | In-place density (MPWSS 02221/1.4) 97% minimum | 1 test/for each 2 feet of vertical depth/2 feet from edge of structure, valve, hydrant or manhole |
Portland Cement Concrete | ||
Portland cement concrete | Mix design | 1 submittal |
Portland cement concrete flatwork and curb and gutter | Air, slump, and 7-day and 28-day compression strength (MPWSS 025152) | Every 50 CY |
Portland cement concrete pavement | Air, slump, and 7-day and 28-day compression strength (MPWSS 025152) | Every 100 CY |
05: ENGINEERING AND DESIGN STANDARDS AND CONSTRUCTION STANDARDS

















View
|
Scale
|
Plans view | 1" = 50' |
Profile view, horizontal | 1" = 50' (or match plan view scale) |
Profile view, vertical | 1" = 50' |
Stational interview | 100 feet or 50 feet |
Table 5-1. Curb Return Radius at Intersections*
| |
Street Classification | Radius in Feet(1) |
Arterial | ** |
Local | 10 |
Major collector | 15 |
Minor collector | 15 |
* Measured from back of curb ** Per AASHTO standards or approved engineering analysis (1) Minimum radius, may be larger based on engineering justification. | |
Table 5-2. Street Design Standards/Criteria
| ||||
Design/Standard Criteria | Street Type | |||
Arterial | Collector Ordinary | Local | ||
Major | Minor | |||
Table 5-2. Street Design Standards/Criteria
| ||||
Design/Standard Criteria | Street Type | |||
Arterial | Collector Ordinary | Local | ||
Major | Minor | |||
Angle at intersection centerline (maximum) | ** | 85° | 75° | 75° |
Centerline radius on curves (minimum) | ** | 250' | 200' | 100' |
Cul-de-sac length | NA | NA | NA | 600' |
K Factor (minimum) | (1) | (1) | (1) | (1) |
Length of tangent at intersection | ** | 150' | 100' | 75' |
Maximum grade | 6% | 8% | 10% | 12% |
Maximum grade within 75' of intersection centerline | ** | 3% | 4% | 5% |
Minimum grade | ** | 0.5% | 0.5% | 0.5% |
Minimum design speed (mph) | 40 | 35 | 25 | 20 |
Standard street crown | 2% | 3% | 3% | 3% |
Stopping sight distance (minimum) | (1) | (1) | (1) | (1) |
Tangent length between reverse curves | ** | 150' | 100' | 50' |
Vertical curve required when algebraic difference in grade greater than | 1% | 1% | 1.5% | 2% |
** All design criteria per AASHTO standards (1) Per AASHTO based on design speed | ||||
Test Specification/Material
|
Test Method
|
Minimum Required Frequency
|
Test Specification/Material
|
Test Method
|
Minimum Required Frequency
|
Asphalt Concrete Pavement | ||
Asphalt concrete pavement (base course and surface course) | Asphalt oil content | 1 test/first day or 1/1000 TN |
Gradation | 1 test/first day or 1/1000 TN | |
Marshal test | 1 test/day or 1/1500 TN | |
Mix design | 1 submittal | |
Rice specific gravity (MPWSS 02510) | 1 test/day or 1/1500 TN | |
Compaction of asphalt concrete pavement | In-place density/thickness (MPWSS 02510) | 1 core/day or 1core/500 TN |
Earthworks | ||
Compaction of crushed base course for roadways | In-place density (MPWSS 02235/1.3) 95% minimum | 1 test/lift/4,00 square feet |
Compaction of crushed base course under curbs, gutters and sidewalks | In-place density (MPWSS 02235/1.3) 95% minimum | 1 test/lift/200 LF (C & G) or 1 test/lift/1,000 square feet (flatwork) |
Compaction of subbase course for roadways | In-place density (MPWSS 02234/1.3) 95% minimum | 1 test/lift/4,000 square feet |
Compaction of subgrade and embarkment for roadways | In-place density (MPWSS 02230/1.3) 95% minimum | 1 test/lift/4,000 square feet |
Compaction of subgrade under curbs, gutters and sidewalks | In-place density (MPWSS 02230/1.3) 95% minimum | 1 test/lift/200 LF (C & G) or 1 test/lift/1,000 square feet (flatwork) |
Crushed base course | Gradation - moisture density - fractured faces (crushed) - LA abrasion, LL, PL and PI (MPWSS 02235) | 1 submittal |
Pipe bedding | Type I bedding gradation and plasticity index/type II bedding gradation (MPWSS 02221) | 1 submittal |
Subbase course | Gradation - moisture density - fractured faces (crushed) - LA abrasion, LL, PL and PI (MPWSS 02234) | 1 sbmittal |
Subgrade and embankment | Moisture-density (MPWSS 02230) | 1 submittal per soil type encountered/1 submittal per borrow source |
Trench backfill | Moisture-density (MPWSS 02221) | 1 sub/soil type encountered 1 submittal/borrow source |
Trench compaction | In-place density (MPWSS 02221/1.4) 97% minimum | 1 test/lift/200 LF |
Trench compaction (laterals outside the road template, structures, valves, hydrants and manholes) | In-place density (MPWSS 02221/1.4) 97% minimum | 1 test/for each 2 feet of vertical depth/2 feet from edge of structure, valve, hydrant or manhole |
Portland Cement Concrete | ||
Portland cement concrete | Mix design | 1 submittal |
Portland cement concrete flatwork and curb and gutter | Air, slump, and 7-day and 28-day compression strength (MPWSS 025152) | Every 50 CY |
Portland cement concrete pavement | Air, slump, and 7-day and 28-day compression strength (MPWSS 025152) | Every 100 CY |