STANDARD WATER LINE EXTENSION SPECIFICATIONS
(a)
Work under this article shall include the furnishing of all materials, equipment, labor, and means of construction necessary for the construction of water mains, railroad and highway crossings, creek crossings, and appurtenances as shown on the extension plans and/or as specified herein. The work is extension of water lines under approved EPD and city standards and includes all application, qualification and implementation required.
(b)
The work shall include all clearing, grubbing, trenching and excavation, pumping, bailing and draining, sheeting, boring, piping, fitting and valve installation, testing, sterilization, and all other work as necessary for the completion of the work as detailed on the drawings and as specified.
(c)
All work pertaining to any requirements contained herein shall be included in the overall bid submitted unless such cost is designated as a separate pay item in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 1.01)
(a)
Contractor shall be responsible for obtaining and paying for all necessary local and state licenses and permits.
(b)
The contractor will be required to deliver all pipe, fittings, valves, meters, and other materials to the location of installation. Care shall be exercised in handling all materials and equipment, and the contractor will be held responsible for all breakage or damage to same. Pipe may be delivered to places that will not interfere with other construction operations and unloaded or yarded and distributed as required, at the contractor's discretion.
(Ord. of 3-1-2005(02), app. E, § 1.02)
(a)
All construction work on streets, roads or railroad rights-of-way shall be done in accordance with the rules and regulations of the agency having control and with the applicable permits. All safety equipment and markings shall be furnished by the contractor.
(b)
All construction work shall be performed in accordance with established construction safety standards, and the contractor shall be responsible for the safety of his employees and the public.
(Ord. of 3-1-2005(02), app. E, § 1.03)
(a)
During the course of work under this contract, the contractor shall be responsible for keeping the inspector on the job informed of his work schedule and of his requirements concerning staking and inspection, as herein specified.
(b)
In the event that any work subject to inspection or testing by the inspector is installed without notification in time for such testing or inspection to be done, that work shall be subject to removal and replacement by the contractor at no additional cost to the owner.
(c)
The contractor shall not put workers on the job or perform any work on any portion of the project without prior knowledge of the inspector that such work is to be done, the place of work, and the scheduled starting time. A minimum 24-hour notification to the inspector is required.
(Ord. of 3-1-2005(02), app. E, § 1.04)
(a)
The contractor shall be responsible for contacting owners or operators of existing utilities to determine exact locations of underground obstructions. Specifically, the telephone, gas, cable TV, and electrical utility companies shall be contacted, and all existing utilities shall be fully protected by the contractor during his construction operations. All damage to existing utilities shall be repaired by the contractor at no additional cost to the owner, and all existing service lines shall be protected or replaced by the contractor at no additional cost to the owner.
(b)
Work involving the temporary or permanent removal of existing facilities from service shall be in accordance with a workable agreement with the owner.
(Ord. of 3-1-2005(02), app. E, § 1.05)
(a)
Working drawings (six copies each) must be submitted to the engineer for approval before any fabrication, erection, or the installation of the work is started.
(b)
The contractor shall check all working drawings for accuracy of dimensions and details and for conformation with contract drawings and specifications before submitting to the engineer for approval.
(c)
The contractor shall indicate, by an appropriate stamp or notation, that the working drawings have been checked by him.
(Ord. of 3-1-2005(02), app. E, § 1.06)
(a)
Within 30 days after notice to proceed is issued, the contractor shall submit shop drawings and/or manufacturers' description sheets and recommendations for installation for the following materials and/or equipment for the approval of the engineer.
(1)
Piping and fittings.
(2)
Valves and valve boxes.
(3)
Fire hydrants.
(4)
Metered services.
(b)
Submittals shall include six copies for each item. Drawings and manufacturer's descriptive material shall include sufficient detail to clearly establish that the item submitted meets the specifications.
(c)
Items installed without approval of the engineer shall be subject to removal and replacement at no additional cost to the owner.
(Ord. of 3-1-2005(02), app. E, § 1.07)
(a)
The city will furnish water for construction operations and testing as available through the system under construction. Otherwise, water will be contractor-supplied. All city water will be metered.
(b)
The contractor shall make his own arrangements to convey the water from the city's hydrant or tap to points of construction.
(c)
The contractor will furnish chemicals necessary for sterilization required for the project.
(d)
The city will supply all pipe, fittings, valves, and piping accessories.
(Ord. of 3-1-2005(02), app. E, § 1.08)
The contractor shall employ only competent and skilled personnel on the work. At all times when the work is in progress, the contractor shall have a competent superintendent or foreman present with authority to receive orders and execute the work. The contractor shall, upon demand from the engineer, immediately remove any superintendent, foreman, or worker whom the engineer may consider incompetent, undesirable, or both.
(Ord. of 3-1-2005(02), app. E, § 1.09)
All materials furnished and work done by the contractor at any time during the progress of the work shall be subject to the inspection of the engineer, who shall have full power to accept or reject any part thereof. The contractor shall remedy any defective unsatisfactory work or material at no additional cost to the owner. In the event the contractor fails to initiate corrections within 48 hours after written notice, the engineer shall have full right to have same done and to bill the contractor for cost thereof. Any condemned material must be removed from the work within 24 hours at no additional cost to the owner.
(Ord. of 3-1-2005(02), app. E, § 1.10)
Testing will be performed according to the procedures detailed for each portion of the water system improvements. Payment for testing is to be included in the construction costs bid for the item to be tested.
(Ord. of 3-1-2005(02), app. E, § 1.11)
(a)
Payments to the contractor shall be in accordance with paragraph 19 of the general conditions.
(b)
The owner shall retain 25 percent of the unit price of mains and appurtenances which are eligible for payment, in the monthly partial payment request, and which have failed to pass the pressure and leakage test.
(c)
Materials used in pipeline not approved for payment shall be considered as material stored.
(Ord. of 3-1-2005(02), app. E, § 1.12)
Whenever a material or article required is specified or shown on the plans by using the name of the proprietary product or of a particular manufacturer or vendor, and material or article which will meet design criteria and is equal in function and durability, as determined by the engineer, will be considered acceptable. City standard items such as valves, meters, etc., shall be as currently used by the city. The contractor shall verify current items with city public works director.
(Ord. of 3-1-2005(02), app. E, § 1.13)
(a)
All salvageable items of material and equipment, as determined by the engineer, removed during the course of the new construction shall remain the property of the owner and shall be stored on the owner's property by the contractor, as directed by the engineer.
(b)
The contractor shall dispose of all unwanted materials, trash and rubbish of all kinds. The method of disposal shall be approved by the engineer.
(Ord. of 3-1-2005(02), app. E, § 1.14)
The contractor shall maintain at the project site a separate set of contract drawings for the purpose of recording as-built changes made during the course of the work. The changes shall be marked and noted on a regular and timely basis, as the changes occur, and shall be submitted to the engineer prior to the final work claim.
(Ord. of 3-1-2005(02), app. E, § 1.15)
No separate payment will be made for work under this section of the specifications except as set forth in the bid schedule. The cost of such work and all cost incidental thereto shall be included in the price bid for the item to which the work pertains.
(Ord. of 3-1-2005(02), app. E, § 1.16)
System and plant piping may be adjusted to suit actual conditions and final development plan (within adjustment limitations).
(Ord. of 3-1-2005(02), app. E, § 1.17)
Limits of unit price work for this contract are shown on the plans at existing line west of Phillips Drive, to the north entrance to Fenwick Woods. If adjustments are needed, they will be performed at the unit price for like work in the bid schedule. No adjustments are expected at the ends of the lake crossings.
(Ord. of 3-1-2005(02), app. E, § 1.18)
(a)
Work under this division shall include all clearing and grubbing, trench excavation, preparation of trench for pipe laying, pipe bedding, tamping of fill around piping, complete trench backfill, dressing of completed backfill, seeding and restoration of surfaces as nearly as possible to their original conditions.
(b)
The contractor shall determine, as far as possible in advance, the location of all existing water, sewer, and telephone cables, storm drains, and all existing buried cables. Coordination with the local utilities, in particular the telephone and cable television utilities, shall be maintained to allow those utilities sufficient time to locate and protect their properties in accordance with local and/or state laws. Cost of damage to any existing structures, repair and restoration shall be made at once and backfill shall not be replaced until this is done.
(c)
The contractor shall be responsible for maintaining the roadway and right-of-way in a neat, orderly and safe condition. Unsightly accumulation of trash and waste from construction will not be tolerated. Clean-up and dressing of all backfilled pipe trenches shall immediately follow construction. All hazardous trenches or excavations left overnight shall be marked by barricades with flashing lights. Stockpile areas alongside roadways or in road right-of-way shall be maintained in a neat and orderly fashion. All ruts, gouges and damage to grasses shall be immediately repaired.
(Ord. of 3-1-2005(02), app. E, § 2.01)
(a)
The contractor shall not close more than one block at a time to traffic and shall maintain at least one lane open for local traffic except for locations where this is not possible in the opinion of the engineer.
(b)
Driveways which are cut for installation of piping must be backfilled and cleared for traffic within four hours of being cut. Property owners must be given 24 hours' advance notice that work will be done.
(c)
The county administration shall be notified of any scheduled street closing, and his approval must be obtained for such closing. Notification must include a schedule time for closing the street and a scheduled time for completion of work.
(Ord. of 3-1-2005(02), app. E, § 2.02)
(a)
Prior to starting construction operations, the contractor shall remove all vegetation, debris and other objectionable matter standing or lying on the surface within the limits of the areas to be excavated or filled. Removal and disposal of such materials shall be done in a manner acceptable to the engineer.
(b)
Areas occupied by trees, brush or other vegetation shall be cleared of such growth and suitably grubbed. All large roots or stumps shall be removed to a depth at least two feet below original ground surface. Any pits or cavities thereby created which extend beyond the excavation limits shall be filled with the materials and in the manner specified herein.
(c)
Ornamental trees, cultivated shrubs, and similar growth which occupies streets, alleys, or other public rights-of-way or easements but which lies outside the exact limits of excavation shall remain undisturbed and shall be carefully preserved and protected by the contractor throughout all stages of the construction work.
(d)
The owner will secure rights-of-way or easements through private lands where required, but the contractor shall give due notice to tenants therein and shall be responsible for damage to property therein. Each building, wall, fence, pole, tree, lawn, or other property or improvement encountered, whether public or private, shall be carefully protected from all injury, and in case of damage or removal, shall be completely repaired or restored to its original condition. All costs related to damage to such improvements shall be borne by the contractor. Special care shall be taken in trenching under or near buildings to avoid or minimize all damage or injury thereto.
(e)
Exploratory excavation shall be made when necessary to locate underground obstructions. Every pipe, conduit, foundation or other "underground structure" encountered in trenching shall be carefully protected from injury or displacement. All costs related to damage to such structures and pipelines or damage to property or persons resulting from damage to such structures and pipelines shall be borne by the contractor. Damage shall be completely repaired within a reasonable time. No claim shall be made for damage or delay of the work on account of the proximity of or the leakage from such structures and pipelines.
(f)
Preparation of the site as specified in this section shall be considered as an integral part of the excavation, and no separate payment therefor will be allowed.
(Ord. of 3-1-2005(02), app. E, § 2.03)
(a)
Trench excavation or excavation for pipelines shall consist of excavation necessary for the construction of water lines and all appurtenant facilities therefor, including sand or crushed stone cushion, and pipe protection as called for on the plans or as specified herein. It shall include site preparation, backfilling and tamping of pipe trenches and the disposal of waste materials, all of which shall conform to the applicable provisions of these specifications.
(b)
Excavation for pipe trenches shall have straight sides and shall be to such depth as will provide a minimum depth of cover of 30 inches over the pipe, except as noted on the plans. Piping installed on state highway rights-of-way side slopes, shoulders, or in ditches shall have a minimum cover of 30 inches over the pipe. Piping installed in the back slopes shall have a minimum of 30 inches of cover over the pipe. Wherever possible, piping shall be located five feet from edge of pavement. All work in state rights-of-way shall be in accord with installation permits.
(c)
Trench excavation shall be made by the open cut method unless boring or jacking is shown or specified. The sides of the trench shall be cut in vertical, parallel planes and the minimum overall width of the trench shall be equal to the pipe diameter plus 12 inches. When sheeting is used, the distance between the vertical faces of the sheeting shall be equal to the overall trench width as specified above. Where vertical banks for trench excavation are not practical to construct or create dangerous working conditions, the banks may be sloped, provided that such excavation does not damage existing structures or roadways. When trench banks are sloped, the portion of the trench below the level of 12 inches above the top of the pipe shall be cut with vertical sides and to the width specified above. The bottom of the trench shall be level in cross section and shall be cut true to the required depth of the pipe except where cushion materials are specified or authorized by the engineer, in which case the excavation shall extend to the bottom of the cushion.
(d)
Holes for bell-and-spigot pipe shall be excavated at proper intervals so that the barrel of the pipe will rest for its entire length upon the bottom of the trench. Bell holes shall be large enough to permit proper installation of joints in the pipe.
(e)
When muck, quicksand, soft clay, swampy soil or other materials unsuitable for foundations or subgrade are encountered extending beyond the limits of the excavation, such material shall be removed and replaced with sand cushion as specified herein.
(f)
Pipe trenching shall be performed so as to cause the least possible inconvenience to the public. Temporary bridges or crosswalks shall be constructed where necessary to maintain vehicular or pedestrian traffic. Crosswalks and bridges shall have handrails or other features necessary for safe use by the public.
(g)
In all cases where materials are deposited along open trenches, they shall be placed and pipe ends capped so that, in the event of rain, no damage will result to the work or adjacent property.
(h)
Rock will not be classified as such for additional payment. The bidder shall satisfy himself as to rock and other materials which may be encountered in excavation and make proper allowances for all contingencies in his price bid per linear foot of pipe.
(Ord. of 3-1-2005(02), app. E, § 2.04)
(a)
When necessary to protect structures, paving or facilities, the sides of all excavations shall be sufficiently sheeted, shored and braced whenever necessary to prevent slides, cave-ins, settlement or movement of the banks and to maintain the excavation clear of obstructions that will, in any way, hinder or delay the progress of the work or endanger workers. Wood or steel sheet piling of ample design and type shall be used when necessary. All sheeting, shoring and bracing shall have sufficient strength and rigidity to withstand the pressures exerted and to maintain the walls of the excavation properly in place and protect all persons and property from injury or damage.
(b)
Where excavations are made adjacent to existing buildings or other structures or in paved streets or alleys, the contractor shall take particular care to sheet, shore and brace the sides of the excavation adequately so as to prevent any undermining of or settlement beneath such structures or pavement. The contractor will be liable for any damage to any structure or any injury to any person that results from his operations.
(c)
Sheeting and shoring materials shall be withdrawn as trenches are being backfilled, after backfill has been placed over pipe at least 18 inches. If their removal before backfill is complete endangers any adjacent structure, they shall be left in place until backfill is complete and pulled then, if possible. Voids caused by sheeting withdrawals shall be backfilled and tamped with thin rammers designed for the purpose. If not withdrawn, sheeting shall be cut off at least 18 inches below surface.
(d)
Sheeting, shoring and bracing shall be considered as an integral part of the excavation work and no specific payment will be allowed therefor.
(Ord. of 3-1-2005(02), app. E, § 2.05)
(a)
Where the excavation area shown on the plans falls under the groundwater surface or near the banks of a flowing stream or other body of water, the contractor may adopt and carry out any method he may deem feasible for the performance of the excavation work and for the protection of the work thereafter, provided the method and equipment to be used result in completed work which complies with the specifications and is acceptable to the engineer. In such cases, the excavation area shall be effectively protected from damage during the excavation period and until all contemplated construction work therein has been completed. Underwater excavation shall be in accord with the current United States Corps of Engineers National Permit for water line crossing of waterways.
(b)
The cost of all temporary construction work necessary or incidental to work under water or in wet conditions, including the cost of installing and removing sand bags, coffer dams, sheet piling, excavation and backfill, pumping and dewatering, shall be considered as an integral part of the cost of excavation, and no separate payment therefor shall be allowed or made.
(Ord. of 3-1-2005(02), app. E, § 2.07)
(a)
Excavation for structures shall be sufficiently large for the proper placing of forms and concrete and for dewatering purposes but shall not be excessively large in horizontal area. Banks may be sloped at a safe angle provided that such excavation does not endanger or damage existing or proposed structures, pipelines, etc. The bottom of the excavation shall be true to the required shape and elevations shown on the plans. No earth backfilling will be permitted under structures unless specifically shown on the plans. Should the contractor excavate below the elevations shown or specified, he shall fill the void thus made with thoroughly compacted, dense graded, crushed stone, with aggregate (sand cushion) acceptable to the engineer, or with class C concrete at no additional cost to the owner.
(b)
When muck, quicksand, soft clay, or other materials unsuitable for foundations are encountered extending beyond the limits of the excavation, such materials shall be removed and replaced with thoroughly compacted, dense graded, crushed stone, with aggregate (sand cushion) acceptable to the engineer, or with class C concrete.
(c)
In all cases where materials are deposited along open excavation, they shall be placed so that, in the event of rain, no damage will result to the work or adjacent property.
(Ord. of 3-1-2005(02), app. E, § 2.08)
(a)
The backfilling of pipeline trenches shall be started immediately after the pipe work has been inspected and approved by the engineer. Backfill material shall consist of fine loose earth free of large clods, stones, vegetable matter, debris, and/or other objectionable material. Backfill shall be carefully deposited in six-inch layers (before compaction) on each side of the pipe and then thoroughly and carefully tamped or rammed around the pipe with approved power tools until enough material has been placed and compacted to provide a cover of not less than one foot over the top of the pipe. If the trench extends along or across streets, roadways, proposed roadways, usable alleys or sidewalks, the remainder of the trench shall be backfilled and tamped to its full depth in the manner specified above with a minimum density of 95 percent standard proctor for the full depth. Otherwise, it may be filled with loose material without compaction. Where tamping of material is not required for the full depth of the trench, this material (from a height of one foot above the pipe upward) shall be as hereinbefore specified, except that a broken stone content of not more than 50 percent by volume will be allowed of stones not exceeding six-inch maximum dimensions, provided that these stones are thoroughly mixed with earth.
(b)
Before being placed under pavement, earth material for backfill which is, in the opinion of the engineer, too dry to allow thorough compaction, shall receive an admix of sufficient water prior to compaction to insure such compaction. Earth material considered by the engineer to have excessive water content shall not be placed.
(c)
Backfill material having less than a ten percent clay content may be compacted by puddling with water in lieu of tamping when authorized by the engineer. Such puddling shall consist of applying water under pressure to the entire content of the trench beginning near the trench bottom and working through pipes or well points.
(d)
Backfill materials used shall contain a sufficient amount of moisture for proper compaction. In areas to be paved and areas not to be paved but inside road rights-of-way, the backfill shall be brought up in accordance with section 30-300(a) and compacted to not less than 95 percent of standard proctor.
(e)
Compaction tests will be required at varying depths and intervals determined by the engineer. Tests shall be made by a qualified independent testing laboratory selected by the engineer. The owner shall pay for all compaction testing. However, in the event that such tests fail to meet the requirements of the specifications, the expense of such tests shall be borne by the contractor.
(f)
Where the test results indicate that compaction is less than the allowable minimum specified in section 30-300(a), the material will be removed to the depths and limits determined by the engineer and new material placed and compacted to minimum standards at no additional cost to the owner.
(g)
Where excavation has been made within the limits of easements across private property, the top one foot of backfill material shall consist of fine loose earth free of large clods, vegetable matter, debris, stone and/or other objectionable materials.
(h)
Where tamping of backfill material is not required for the full depth, the backfill material shall be neatly rounded over the trench to a sufficient height to allow for settlement to grade after consolidation. Any deficiency in the quantity of materials for backfilling the trenches or for filling the depressions caused by settlement shall be supplied by the contractor.
(i)
Where pipe trenches are cut across pavement, the contractor shall construct a temporary surface over the cut by filling and tamping the upper six inches of the cut with selected gravel or crushed stone which will not disintegrate under the traffic and which shall be maintained in good condition under traffic until the permanent pavement has been constructed. No specific payment will be allowed for temporary surfacing.
(j)
All backfilling shall be done in a manner which will not disturb or injure the pipe or structure over or against which it is being placed. Any pipe or structure injured, damaged or moved from its proper alignment during backfilling operations shall be opened up and then rebackfilled as herein specified.
(k)
The contractor shall replace all surface materials and shall restore drives, curbing, sidewalks, gutters, shrubbery, fences, sod, and other disturbed surfaces to a condition equal to that before the work began, furnishing all labor and materials incidental thereto. No payment for such items shall be made unless specifically stated in these specifications and or in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 2.09)
(a)
Sand cushion shall consist of either coarse sand, gravel, or crushed stone. All cushion material shall pass a 1½-inch screen, and 90 percent shall be retained on 20 mesh screen. The material shall be handled on the job so that it will be kept clean and free of dirt, clay, and other foreign matter and will retain its ability to pass water freely.
(b)
Sand cushion shall be used at the following locations:
(1)
At locations shown on the plans or when specified to provide bedding for pipe where rock has been removed from the trench;
(2)
In local areas where rock has been removed from the pipe trench and the excavated materials are not suitable for bedding the pipe; and
(3)
In local areas where unsuitable materials such as muck, quicksand, soft clay, swampy material or excessive groundwater make it necessary to provide a satisfactory pipe foundation.
(c)
Sand cushion used to provide bedding for pipe where rock has been removed from the trench shall be placed to the overall width of trench, which shall be as specified in section 30-298(a). It shall be placed to the depth of six inches below the bottom of the pipe. Sand cushion used to provide additional bedding for pipe installed in deep cuts shall be placed to the width and depth shown on the plans or as directed by the engineer.
(d)
Sand cushion under structures shall be placed in the areas and to the depth shown on the plans or as authorized by the engineer.
(e)
Cushion material shall be compacted by tamping with suitable tools and shaped to receive the pipe and to support the full length of the barrel of the pipe at exact line and grade.
(f)
All costs pertaining to sand cushion requirements contained herein shall be included in the unit price bid per foot of pipe submitted in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 2.10)
(a)
All materials removed by excavation which are suitable for the purpose shall be used whenever practicable for fills, embankments, backfilling pipe trenches, and for such other purposes as may be shown on the plans or authorized by the engineer. All materials not used for such purposes shall be considered as waste materials and disposed of by the contractor. Disposal shall be in accordance with all applicable permits (United States Corps of Engineers National Permit).
(b)
Waste materials may be deposited in waste banks at locations authorized by the engineer. Such materials shall not be left in unsightly piles but shall be spread in uniform layers and neatly leveled and shaped. Waste banks shall be provided with adequate openings to permit surface drainage of adjacent lands.
(c)
Upon completion of any part of the work, proper disposal shall be made of all surplus or unused materials left within the construction limits of such work and the surface of the work left in a neat and workmanlike condition.
(d)
Disposal of excavated materials shall be considered an integral part of the excavation work and no separate payment therefor will be allowed.
(Ord. of 3-1-2005(02), app. E, § 2.11)
(a)
All excavated areas, backfills, embankments, trenches and access roads, grading and ditches shall be maintained by the contractor in good condition at all times until final acceptance by the owner. Where trench backfill has settled, trenches shall be rebackfilled.
(b)
At the end of each work week, the contractor shall inspect road surfaces where excavations have been made and make all necessary repairs to the surfaces disturbed by the construction work.
(Ord. of 3-1-2005(02), app. E, § 2.12)
(a)
Where pipe trenches are cut across paved driveways, a temporary surface, as specified in section 30-298(i) shall be provided before permanent pavement patch is made.
(b)
Where pipe is installed running longitudinally with paving, installation of backfill shall be done in accordance with section 30-298(a).
(c)
Payment for pavement replacement shall be per linear foot of pipeline covered and shall include excavation, class A concrete trench cap, and surfacing material. Trench widths are considered to be widths specified in section 30-294(c), and extra paving width due to sloping trench sides shall be done at no additional cost to owner.
(d)
Contractor shall be responsible for any pavement replacement that is made necessary by construction equipment while working on off-road excavation.
(e)
Where pipe trenches cut across or along dirt or gravel based roads or driveways, installation of backfill shall be according to section 30-298(a).
(Ord. of 3-1-2005(02), app. E, § 2.13)
(a)
In locations where piping is installed across grass areas, the contractor shall be responsible for reseeding or resodding all disturbed areas. Such areas shall be restored as nearly as possible to original condition and no specific payment shall be made for this item of work.
(b)
Sod replacement due to erosion on steep slopes will be done at no additional cost to the owner.
(c)
Grassing will be in accord with the erosion control plans and as specified in the special conditions.
(Ord. of 3-1-2005(02), app. E, § 2.14)
All associated costs shall be at developer's expense.
(Ord. of 3-1-2005(02), app. E, § 2.15)
The work to be done under this division of the specifications consists of furnishing all materials and performing all labor necessary for the complete construction of additions to the water distribution system, including all piping, valves, service connections, fire hydrants and connections to the well and tank site piping, as indicated on the drawings and/or specified.
(Ord. of 3-1-2005(02), app. E, § 3.01)
All materials used in the construction shall be new and unused when delivered to the site and shall be subject to inspection by the engineer before installation.
(Ord. of 3-1-2005(02), app. E, § 3.02)
(a)
Within 30 days after notice to proceed is issued, the contractor shall submit, for the approval of the engineer, shop drawings and/or manufacturer's description sheets for the following materials and/or equipment (valves, hydrants, and meters shall be current items in use by the city, as confirmed by the public works director):
(1)
Piping and fittings;
(2)
Valves and valve boxes;
(3)
Fire hydrants;
(4)
Tapping sleeves and valves; and
(5)
Meters, boxes, and service pipe/fittings.
(b)
Submittals shall include six copies for each item. Drawings and manufacturer's descriptive material shall include sufficient detail to clearly establish that the item submitted meets the specifications.
(c)
Items installed without approval of the engineer shall be subject to removal and replacement at no additional cost to owner.
(Ord. of 3-1-2005(02), app. E, § 3.03)
(a)
Excavation and backfill shall be as specified in division 2 of this article.
(b)
All lines shall be installed in accordance with section 30-294(b) except as indicated on the contract drawings or required by utility accommodation permits.
(Ord. of 3-1-2005(02), app. E, § 3.04)
(a)
Polyvinyl chloride (PVC) plastic pipes shall be in accordance with the following:
(1)
Bell-and-ring type integral bell or gasketed coupling, and conform to all requirements of AWWA C-900 latest edition. Class 150 pipe only shall be used.
(2)
Manufactured by Clow Corporation, Certainteed Products Corporation, Uponor ETI Company or approved equal.
(3)
Pipe, fittings and appurtenances shall be not more than six months old.
(b)
Fitting for six inches or larger PVC pipe shall be manufactured of ductile iron, grade 80-55-06 in accordance with ASTM A-536. Fittings shall have mechanical joints or push-on joints with gaskets meeting ASTM F-477. Fittings shall have radii of curvatures conforming to AWWA C110 and shall be cement lined in accordance with AWWA C104. The price of PVC fittings shall be included in the per foot price bid for PVC pipe.
(c)
Fittings for PVC pipe smaller than six inches shall use either PVC fittings supplied by the pipe manufacturer or ductile iron fittings as specified above at the contractor's option.
(Ord. of 3-1-2005(02), app. E, § 3.05)
(a)
Ductile cast iron pipe supplied shall be push-on, mechanical or flanged joint, as indicated on the drawings.
(b)
Mechanical or push-on joint ductile cast iron pipe shall:
(1)
Conform to AWWA C106 or C108;
(2)
Be thickness class 53, AWWA C150;
(3)
Be cement-lined in accordance with AWWA C104;
(4)
Be rated working pressure 150 psi, AWWA C151;
(5)
Have rubber-gasket joints conforming to AWWA C111.
(c)
The weight, casting period, and class or nominal thickness shall be shown on each pipe. The manufacturers mark, the year in which the pipe was produced, and the letters "DI" or "DUCTILE" shall be clear and legible, and all cast marks shall be on or near the bell.
(Ord. of 3-1-2005(02), app. E, § 3.06)
(a)
Fittings for ductile cast iron pipe shall be mechanical joint ductile iron fittings conforming to AWWA C110 and shall have a working pressure of 250 psi.
(b)
Fittings shall be cement-lined in accordance with AWWA C104.
(c)
The price of fittings shall be included in the per ton price bid for ductile iron pipe fittings.
(Ord. of 3-1-2005(02), app. E, § 3.07)
(a)
New water lines shall be connected to existing water lines at locations shown on the drawings.
(b)
At locations where new a line connects into an existing main and/or where an existing main is disconnected and plugged, the cost shall be included in the per foot price bid for pipe. The cost shall be for removal of existing fittings, valves and piping as required for the connection as shown on the drawings. Payments for new valves shall be made separately, where applicable, as stated in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 3.08)
(a)
Concrete surge blocks shall be installed at all bends of 11¼ degrees or greater in the pipeline, and at all valves, plugs, tees, and caps. Concrete shall be of a mix not leaner than one part cement to 2½ parts sand and five parts stone, and shall have a compressive strength of not less than 2,000 psi after 28 days.
(b)
Surge blocks shall be of mass concrete with minimum dimensions not less than the block dimensions shown on the drawings. In no case shall surge blocks be poured so that piping connections are covered so as to prevent removal of fittings or valves.
(c)
Surge blocks shall be backed against firm, undisturbed earth. Any extra concrete volume required due to over-excavation shall be installed at no additional cost to the owner.
(d)
Surge blocks in place shall be paid for at the unit price bid for concrete blocking in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 3.09)
(a)
Gate valves shall be located as shown on the drawings and installed as detailed on the drawings, complete with cast iron valve boxes. Any valve which cannot be easily hand-operated from ground surface shall be provided with operating extension by the contractor. The contractor shall provide at least two operating handles for each different sized operating nut on valves in the system.
(b)
Gate valves four inches through 24 inches shall be resilient wedge type in compliance with AWWA C509, latest revision, with ductile iron wall thickness that meets or exceeds AWWA C153 ductile iron fittings. Gate valves shall be rated for 250 psi cold water working pressure and hydrostatically tested at 500 psi. Gate valves shall meet UL-FM standards. Valve body, bonnet, wedge and operating nuts shall be constructed of ductile iron. The exterior of the wedge shall be 100 percent rubber encapsulated. The wedge shall be symmetrical and seal equally well with flow in either direction.
(c)
Operating nuts shall be constructed of ductile iron and shall have four flats at stem connection to assure even input torque to the stem. All gaskets shall be pressure energized O-rings. Bolts shall follow ANSI A161.1. Allen screws or metric bolting shall not be allowed. Stem shall be sealed by three O-rings. The top two O-rings shall be replaceable with valve fully opened and while subject to fully rated working pressure. O-rings set in cartridge shall not be allowed. Valves shall have two thrust washers with one located above and one below the thrust collar to assure trouble-free operation of the valve. All internal and external surfaces of the valve body and bonnet shall have a fusion bonded epoxy coating complying with ANSI/AWWA C550, applied hydrostatically prior to assembly. The epoxy coating shall be of the orange color. Valves shall be American Flow Control Series 2500.
(Ord. of 3-1-2005(02), app. E, § 3.10)
(a)
Tapping valves shall comply with the above specifications, and shall include the following as well.
(b)
Tapping valves shall be flanged x-mechanical joint connection. The flanged-end connector shall have a raised face or alignment lip. A quarter-inch undersize cutter may be used unless otherwise specified.
(Ord. of 3-1-2005(02), app. E, § 3.11)
(a)
All hydrants shall meet or exceed AWWA C-502, latest revision for dry-top fire hydrants. Hydrants must meet UL-FM standards. The hydrant shall be of traffic-model type, rated at 250 psi and hydrostatically tested at 500 psi The hydrant main valve shall be of compression type opening against pressure and closing with pressure and shall not be less than 5¼-inch opening.
(b)
All operating parts shall be of bronze material in full compliance with AWWA C502, section 2.2.5-01. The seat and seat ring must be bronze to bronze. Bronze to cast iron seating will not be accepted. The hydrant shall have a 1½-inch pentagon one piece bronze operating nut and open left (counterclockwise). The hydrant shall be a tree-way design, with two 2½-inch hose nozzles and one 4½-inch pumper nozzle. The nozzle threads must meet city specifications. Hydrants must have a breakaway traffic feature and be designed for 360 degree rotation of the nozzle section. Friction loss through the pumper nozzle shall not exceed 3.0 psi per 1,000 gpm at 60 psi working pressure.
(c)
The hydrant base and lower barrel shall be made of the same material. Hydrants shall allow for easy installation of extensions and repair at the ground line without having to shut off the water main. All interior parts shall be accessible through the top of the hydrant without excavation. Lubrication can be either by grease or oil. Allen head screws may be used in location of inserting lubrication, otherwise no Allen head screws or metric bolting will be allowed. The bolts shall meet ASTM A-307 grade B, in accordance with the requirements of specification of ASTM B-633. The hydrant valve assembly shall be a three-piece design consisting of a valve top, valve bottom and the hydrant valve rubber. A one-piece valve assembly will not be accepted.
(d)
Upon request, all hydrant manufacturers shall furnish a list of ten cities that have used the submitted hydrant for at least ten years. All hydrants must have a ten-year warranty, identified from the cast date on the upper barrel of the hydrant.
(e)
Approved hydrants are American Darling B-84-B, Mueller A-423, or preapproved hydrants.
(Ord. of 3-1-2005(02), app. E, § 3.12)
(a)
Pipe, appurtenances, and fittings shall be laid to the line and grade established on the plans or as directed by the engineer. The minimum cover, as stated in section 30-294(b), shall be maintained over all pipe unless otherwise indicated. The bed for the pipe is to be shaped either by trimming the bottom of the trench or by placing excavated earth thereon and tamping so that each piece of pipe has uniform bearing. The trench shall be further excavated around each bell or hub so that it will be entirely clear of the ground and leave ample room for making joints.
(b)
The inside of the bells and the outside of the spigots shall be thoroughly cleaned before they are placed. The inside of all pipe shall be thoroughly swabbed to insure that the pipe is clean and free of obstruction and foreign matter until the work is completed.
(c)
Where pipe laying ceases at the end of the day or for any cause, the end of the pipe shall be securely closed in order to prevent the entrance of water, mud, or any other objectionable matter.
(d)
The contractor shall furnish and install a no. 14 copper wire or detection tape in the trenches for all PVC mains and service lines. The wire shall be placed on top of the pipe and secured thereto to prevent movement during the backfill operation. The tape shall be placed approximately 12 inches below the ground surface and shall be joined by a common bond. The detection tape shall be continuously printed with the words "Buried Water Main Below." The tape shall be "Terra Tape" as manufactured by Reef Industries, Inc., or approved equal.
(Ord. of 3-1-2005(02), app. E, § 3.13)
(a)
All valves, service lines and connections shall be subject to inspection and approval by the inspector on the job before being covered and backfilled.
(b)
Items covered without approval of the inspector shall be uncovered for inspection and rebackfilled at no additional cost to owner.
(Ord. of 3-1-2005(02), app. E, § 3.14)
(a)
All branches of the new distribution system shall be disinfected in accordance with AWWA C601-68. The slug method, as defined in AWWA C601-68, shall be the method used. The form of chlorine used shall be calcium hypochlorite.
(b)
After each section of piping is disinfected and flushed clear of chlorine, the contractor shall take samples for bacteriological analysis to an approved independent testing laboratory in accordance with the department of environmental regulation.
(c)
Copies of sample reports shall be furnished to the owner, the contractor and the engineer.
(d)
Should the samples fail to be acceptable, the contractor shall be obligated to again disinfect the system completely, flush the system clear and have additional samples taken for analysis.
(e)
The contractor shall notify the inspector at least 48 hours prior to the chlorination of the system and shall provide the necessary apparatus and labor for conducting the tests.
(f)
No separate payment will be made for disinfecting and sampling. The cost of these operations shall be included in the unit price bid for pipe.
(Ord. of 3-1-2005(02), app. E, § 3.15)
(a)
Water service connections shall include tapping saddles on all sizes of mains, three-fourths inches corporation stop at main, three-fourths inches diameter service pipe from main to meter, five-eighths inches × three-fourths inches meter, three-fourths inches curb stop, meter box and all fittings through the outlet end of the service line of the meter, to the limits as indicated on the drawings.
(b)
Service piping shall be polybutylene service pipe, PB 2110, manufactured from polybutylene as defined by ASTM D2581, type II, grade I, rated at a working pressure of 160 psi at 73 degrees Fahrenheit, meeting requirements of the National Sanitation Foundation and dimensional tolerances of ASTM D2666. Piping connection shall be made by the compression method.
(c)
Corporation stops shall be three-quarter inches minimum, bronze with Mueller threads and compression joint outlets, or approved equals.
(d)
Tapping saddles shall be Dresser Style 194 or approved equal.
(e)
Curb stops shall be Mueller 110, or approved equal, with connectors for polybutylene pipe.
(f)
Service take-offs from the main shall be made from the top quadrant of the main, with the axis of tap being no more than 45-degrees in inclination from the vertical.
(g)
Extreme care shall be taken to provide adequate compaction and support under the service tubing adjacent to the main in order to prevent deflection of the tubing at the point of connection to the corporation stop.
(h)
Service meters shall be as follows:
(1)
Meters shall be five-eighths by three-quarter inches positive displacement, magnetic drive, and shall conform with AWWA specifications C700 for cold water service (current city make/model).
(2)
Registers shall be direct-reading in U.S. gallons and be hermetically sealed.
(3)
Measuring chambers shall be made of bronze or plastic polymer.
(4)
The complete meter shall be guaranteed for not less than five years.
(5)
Meters shall be manufactured by Neptune, Badger, Kent, Rockwell or approved equal.
(6)
The bidder shall submit complete data on touch-read system compatible with and warranted by meter manufacturer.
(i)
Meter box shall have minimum dimensions of 18½ inches in length by 13¼ inches in width by 12 inches in depth with cast iron lockless cover. Meter box shall be the "Superflexon" model as supplied by Southern Meter and Supply Company, Inc., or approved equal.
(j)
Payment for service connections shall include all the items detailed on the drawings and/or described herein and shall be paid for at the price bid in the bid schedule.
(k)
Payment for jacked or bored service lines shall be made separately at the price bid in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 3.16)
No separate payment will be made for work under this section of the specifications, except as set forth in the bid schedule. The cost of such work and all costs incidental thereto shall be included in the price bid for the item to which the work pertains.
(Ord. of 3-1-2005(02), app. E, § 3.17)
This division covers hydrostatic pressure and leakage testing in the new water main, which shall be performed by the contractor, in accordance with the AWWA specification C600, as specified herein, and as directed by the engineer.
(Ord. of 3-1-2005(02), app. E, § 4.01)
(a)
The pressure and leakage tests shall be performed on the entire line.
(b)
All concrete reaction blocking and anchorage shall be in place and ready for use before the line is initially filled with water.
(Ord. of 3-1-2005(02), app. E, § 4.02)
Water for filling the line will be furnished through the system under construction or imported by the contractor. The contractor shall not be charged for water provided through the system.
(Ord. of 3-1-2005(02), app. E, § 4.03)
(a)
The contractor shall furnish all materials, equipment and labor necessary to connect the line to be tested and the source of water supply, together with test pumping equipment, water meter, pressure gauge, and other equipment, materials and facilities required for the tests.
(b)
Test pressures shall be applied by means of a force pump of such design and capacity that the required pressure can be applied and maintained without interruption for the duration of the test.
(c)
The water meter and the pressure gauge shall be accurately calibrated and shall be acceptable to the inspector.
(Ord. of 3-1-2005(02), app. E, § 4.04)
(a)
The pipeline shall be subjected to a pressure test for the purpose of testing the line stability and for defective materials or workmanship.
(b)
A test pressure of 50 psi above working pressure shall then be applied and maintained for a period of not less than one hour and for whatever longer period may be necessary to complete the inspection of the line and to locate any and all defective joints and pipeline materials.
(c)
If the pressure test discloses that repairs or replacements are needed, such repairs or replacements shall be made, the line refilled, and the test pressure applied as before; this operation shall be repeated until the line withstands the test pressure in a satisfactory manner.
(Ord. of 3-1-2005(02), app. E, § 4.05)
(a)
The contractor shall conduct a leakage test after the pressure test has been satisfactorily completed.
(b)
The duration of each leakage test shall be two hours, and during the test the main shall be subjected to 150 psi based on the elevation of the lowest point in the section of line to be tested and corrected to the elevation of the test gauge.
(c)
For the purpose of this section, the term "leakage" means the quantity of water that must be supplied into the section of pipe being tested to maintain the specified leakage test pressure after the air in the pipeline has been released and the pipe has been filled with water.
(d)
The maximum allowable leakage shall not exceed ten gallons per inch of pipe diameter per mile per day.
(e)
If any test of the pipeline indicates leakage in excess of the allowable amount, the contractor shall locate and repair the defective joints, and the line shall be retested at no additional cost to the owner.
(f)
The contractor shall furnish the engineer with a written report of the results of each test that identifies the length of pipe tested, the pressure, the duration of the test, and the amount of leakage. The report shall be signed by the contractor.
(g)
No portion of the pipeline and appurtenances which has not successfully met the pressure and leakage tests shall be eligible for payment.
(Ord. of 3-1-2005(02), app. E, § 4.06)
The contractor shall bear the cost of testing, incidental to system expansion.
(Ord. of 3-1-2005(02), app. E, § 4.07)
STANDARD WATER LINE EXTENSION SPECIFICATIONS
(a)
Work under this article shall include the furnishing of all materials, equipment, labor, and means of construction necessary for the construction of water mains, railroad and highway crossings, creek crossings, and appurtenances as shown on the extension plans and/or as specified herein. The work is extension of water lines under approved EPD and city standards and includes all application, qualification and implementation required.
(b)
The work shall include all clearing, grubbing, trenching and excavation, pumping, bailing and draining, sheeting, boring, piping, fitting and valve installation, testing, sterilization, and all other work as necessary for the completion of the work as detailed on the drawings and as specified.
(c)
All work pertaining to any requirements contained herein shall be included in the overall bid submitted unless such cost is designated as a separate pay item in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 1.01)
(a)
Contractor shall be responsible for obtaining and paying for all necessary local and state licenses and permits.
(b)
The contractor will be required to deliver all pipe, fittings, valves, meters, and other materials to the location of installation. Care shall be exercised in handling all materials and equipment, and the contractor will be held responsible for all breakage or damage to same. Pipe may be delivered to places that will not interfere with other construction operations and unloaded or yarded and distributed as required, at the contractor's discretion.
(Ord. of 3-1-2005(02), app. E, § 1.02)
(a)
All construction work on streets, roads or railroad rights-of-way shall be done in accordance with the rules and regulations of the agency having control and with the applicable permits. All safety equipment and markings shall be furnished by the contractor.
(b)
All construction work shall be performed in accordance with established construction safety standards, and the contractor shall be responsible for the safety of his employees and the public.
(Ord. of 3-1-2005(02), app. E, § 1.03)
(a)
During the course of work under this contract, the contractor shall be responsible for keeping the inspector on the job informed of his work schedule and of his requirements concerning staking and inspection, as herein specified.
(b)
In the event that any work subject to inspection or testing by the inspector is installed without notification in time for such testing or inspection to be done, that work shall be subject to removal and replacement by the contractor at no additional cost to the owner.
(c)
The contractor shall not put workers on the job or perform any work on any portion of the project without prior knowledge of the inspector that such work is to be done, the place of work, and the scheduled starting time. A minimum 24-hour notification to the inspector is required.
(Ord. of 3-1-2005(02), app. E, § 1.04)
(a)
The contractor shall be responsible for contacting owners or operators of existing utilities to determine exact locations of underground obstructions. Specifically, the telephone, gas, cable TV, and electrical utility companies shall be contacted, and all existing utilities shall be fully protected by the contractor during his construction operations. All damage to existing utilities shall be repaired by the contractor at no additional cost to the owner, and all existing service lines shall be protected or replaced by the contractor at no additional cost to the owner.
(b)
Work involving the temporary or permanent removal of existing facilities from service shall be in accordance with a workable agreement with the owner.
(Ord. of 3-1-2005(02), app. E, § 1.05)
(a)
Working drawings (six copies each) must be submitted to the engineer for approval before any fabrication, erection, or the installation of the work is started.
(b)
The contractor shall check all working drawings for accuracy of dimensions and details and for conformation with contract drawings and specifications before submitting to the engineer for approval.
(c)
The contractor shall indicate, by an appropriate stamp or notation, that the working drawings have been checked by him.
(Ord. of 3-1-2005(02), app. E, § 1.06)
(a)
Within 30 days after notice to proceed is issued, the contractor shall submit shop drawings and/or manufacturers' description sheets and recommendations for installation for the following materials and/or equipment for the approval of the engineer.
(1)
Piping and fittings.
(2)
Valves and valve boxes.
(3)
Fire hydrants.
(4)
Metered services.
(b)
Submittals shall include six copies for each item. Drawings and manufacturer's descriptive material shall include sufficient detail to clearly establish that the item submitted meets the specifications.
(c)
Items installed without approval of the engineer shall be subject to removal and replacement at no additional cost to the owner.
(Ord. of 3-1-2005(02), app. E, § 1.07)
(a)
The city will furnish water for construction operations and testing as available through the system under construction. Otherwise, water will be contractor-supplied. All city water will be metered.
(b)
The contractor shall make his own arrangements to convey the water from the city's hydrant or tap to points of construction.
(c)
The contractor will furnish chemicals necessary for sterilization required for the project.
(d)
The city will supply all pipe, fittings, valves, and piping accessories.
(Ord. of 3-1-2005(02), app. E, § 1.08)
The contractor shall employ only competent and skilled personnel on the work. At all times when the work is in progress, the contractor shall have a competent superintendent or foreman present with authority to receive orders and execute the work. The contractor shall, upon demand from the engineer, immediately remove any superintendent, foreman, or worker whom the engineer may consider incompetent, undesirable, or both.
(Ord. of 3-1-2005(02), app. E, § 1.09)
All materials furnished and work done by the contractor at any time during the progress of the work shall be subject to the inspection of the engineer, who shall have full power to accept or reject any part thereof. The contractor shall remedy any defective unsatisfactory work or material at no additional cost to the owner. In the event the contractor fails to initiate corrections within 48 hours after written notice, the engineer shall have full right to have same done and to bill the contractor for cost thereof. Any condemned material must be removed from the work within 24 hours at no additional cost to the owner.
(Ord. of 3-1-2005(02), app. E, § 1.10)
Testing will be performed according to the procedures detailed for each portion of the water system improvements. Payment for testing is to be included in the construction costs bid for the item to be tested.
(Ord. of 3-1-2005(02), app. E, § 1.11)
(a)
Payments to the contractor shall be in accordance with paragraph 19 of the general conditions.
(b)
The owner shall retain 25 percent of the unit price of mains and appurtenances which are eligible for payment, in the monthly partial payment request, and which have failed to pass the pressure and leakage test.
(c)
Materials used in pipeline not approved for payment shall be considered as material stored.
(Ord. of 3-1-2005(02), app. E, § 1.12)
Whenever a material or article required is specified or shown on the plans by using the name of the proprietary product or of a particular manufacturer or vendor, and material or article which will meet design criteria and is equal in function and durability, as determined by the engineer, will be considered acceptable. City standard items such as valves, meters, etc., shall be as currently used by the city. The contractor shall verify current items with city public works director.
(Ord. of 3-1-2005(02), app. E, § 1.13)
(a)
All salvageable items of material and equipment, as determined by the engineer, removed during the course of the new construction shall remain the property of the owner and shall be stored on the owner's property by the contractor, as directed by the engineer.
(b)
The contractor shall dispose of all unwanted materials, trash and rubbish of all kinds. The method of disposal shall be approved by the engineer.
(Ord. of 3-1-2005(02), app. E, § 1.14)
The contractor shall maintain at the project site a separate set of contract drawings for the purpose of recording as-built changes made during the course of the work. The changes shall be marked and noted on a regular and timely basis, as the changes occur, and shall be submitted to the engineer prior to the final work claim.
(Ord. of 3-1-2005(02), app. E, § 1.15)
No separate payment will be made for work under this section of the specifications except as set forth in the bid schedule. The cost of such work and all cost incidental thereto shall be included in the price bid for the item to which the work pertains.
(Ord. of 3-1-2005(02), app. E, § 1.16)
System and plant piping may be adjusted to suit actual conditions and final development plan (within adjustment limitations).
(Ord. of 3-1-2005(02), app. E, § 1.17)
Limits of unit price work for this contract are shown on the plans at existing line west of Phillips Drive, to the north entrance to Fenwick Woods. If adjustments are needed, they will be performed at the unit price for like work in the bid schedule. No adjustments are expected at the ends of the lake crossings.
(Ord. of 3-1-2005(02), app. E, § 1.18)
(a)
Work under this division shall include all clearing and grubbing, trench excavation, preparation of trench for pipe laying, pipe bedding, tamping of fill around piping, complete trench backfill, dressing of completed backfill, seeding and restoration of surfaces as nearly as possible to their original conditions.
(b)
The contractor shall determine, as far as possible in advance, the location of all existing water, sewer, and telephone cables, storm drains, and all existing buried cables. Coordination with the local utilities, in particular the telephone and cable television utilities, shall be maintained to allow those utilities sufficient time to locate and protect their properties in accordance with local and/or state laws. Cost of damage to any existing structures, repair and restoration shall be made at once and backfill shall not be replaced until this is done.
(c)
The contractor shall be responsible for maintaining the roadway and right-of-way in a neat, orderly and safe condition. Unsightly accumulation of trash and waste from construction will not be tolerated. Clean-up and dressing of all backfilled pipe trenches shall immediately follow construction. All hazardous trenches or excavations left overnight shall be marked by barricades with flashing lights. Stockpile areas alongside roadways or in road right-of-way shall be maintained in a neat and orderly fashion. All ruts, gouges and damage to grasses shall be immediately repaired.
(Ord. of 3-1-2005(02), app. E, § 2.01)
(a)
The contractor shall not close more than one block at a time to traffic and shall maintain at least one lane open for local traffic except for locations where this is not possible in the opinion of the engineer.
(b)
Driveways which are cut for installation of piping must be backfilled and cleared for traffic within four hours of being cut. Property owners must be given 24 hours' advance notice that work will be done.
(c)
The county administration shall be notified of any scheduled street closing, and his approval must be obtained for such closing. Notification must include a schedule time for closing the street and a scheduled time for completion of work.
(Ord. of 3-1-2005(02), app. E, § 2.02)
(a)
Prior to starting construction operations, the contractor shall remove all vegetation, debris and other objectionable matter standing or lying on the surface within the limits of the areas to be excavated or filled. Removal and disposal of such materials shall be done in a manner acceptable to the engineer.
(b)
Areas occupied by trees, brush or other vegetation shall be cleared of such growth and suitably grubbed. All large roots or stumps shall be removed to a depth at least two feet below original ground surface. Any pits or cavities thereby created which extend beyond the excavation limits shall be filled with the materials and in the manner specified herein.
(c)
Ornamental trees, cultivated shrubs, and similar growth which occupies streets, alleys, or other public rights-of-way or easements but which lies outside the exact limits of excavation shall remain undisturbed and shall be carefully preserved and protected by the contractor throughout all stages of the construction work.
(d)
The owner will secure rights-of-way or easements through private lands where required, but the contractor shall give due notice to tenants therein and shall be responsible for damage to property therein. Each building, wall, fence, pole, tree, lawn, or other property or improvement encountered, whether public or private, shall be carefully protected from all injury, and in case of damage or removal, shall be completely repaired or restored to its original condition. All costs related to damage to such improvements shall be borne by the contractor. Special care shall be taken in trenching under or near buildings to avoid or minimize all damage or injury thereto.
(e)
Exploratory excavation shall be made when necessary to locate underground obstructions. Every pipe, conduit, foundation or other "underground structure" encountered in trenching shall be carefully protected from injury or displacement. All costs related to damage to such structures and pipelines or damage to property or persons resulting from damage to such structures and pipelines shall be borne by the contractor. Damage shall be completely repaired within a reasonable time. No claim shall be made for damage or delay of the work on account of the proximity of or the leakage from such structures and pipelines.
(f)
Preparation of the site as specified in this section shall be considered as an integral part of the excavation, and no separate payment therefor will be allowed.
(Ord. of 3-1-2005(02), app. E, § 2.03)
(a)
Trench excavation or excavation for pipelines shall consist of excavation necessary for the construction of water lines and all appurtenant facilities therefor, including sand or crushed stone cushion, and pipe protection as called for on the plans or as specified herein. It shall include site preparation, backfilling and tamping of pipe trenches and the disposal of waste materials, all of which shall conform to the applicable provisions of these specifications.
(b)
Excavation for pipe trenches shall have straight sides and shall be to such depth as will provide a minimum depth of cover of 30 inches over the pipe, except as noted on the plans. Piping installed on state highway rights-of-way side slopes, shoulders, or in ditches shall have a minimum cover of 30 inches over the pipe. Piping installed in the back slopes shall have a minimum of 30 inches of cover over the pipe. Wherever possible, piping shall be located five feet from edge of pavement. All work in state rights-of-way shall be in accord with installation permits.
(c)
Trench excavation shall be made by the open cut method unless boring or jacking is shown or specified. The sides of the trench shall be cut in vertical, parallel planes and the minimum overall width of the trench shall be equal to the pipe diameter plus 12 inches. When sheeting is used, the distance between the vertical faces of the sheeting shall be equal to the overall trench width as specified above. Where vertical banks for trench excavation are not practical to construct or create dangerous working conditions, the banks may be sloped, provided that such excavation does not damage existing structures or roadways. When trench banks are sloped, the portion of the trench below the level of 12 inches above the top of the pipe shall be cut with vertical sides and to the width specified above. The bottom of the trench shall be level in cross section and shall be cut true to the required depth of the pipe except where cushion materials are specified or authorized by the engineer, in which case the excavation shall extend to the bottom of the cushion.
(d)
Holes for bell-and-spigot pipe shall be excavated at proper intervals so that the barrel of the pipe will rest for its entire length upon the bottom of the trench. Bell holes shall be large enough to permit proper installation of joints in the pipe.
(e)
When muck, quicksand, soft clay, swampy soil or other materials unsuitable for foundations or subgrade are encountered extending beyond the limits of the excavation, such material shall be removed and replaced with sand cushion as specified herein.
(f)
Pipe trenching shall be performed so as to cause the least possible inconvenience to the public. Temporary bridges or crosswalks shall be constructed where necessary to maintain vehicular or pedestrian traffic. Crosswalks and bridges shall have handrails or other features necessary for safe use by the public.
(g)
In all cases where materials are deposited along open trenches, they shall be placed and pipe ends capped so that, in the event of rain, no damage will result to the work or adjacent property.
(h)
Rock will not be classified as such for additional payment. The bidder shall satisfy himself as to rock and other materials which may be encountered in excavation and make proper allowances for all contingencies in his price bid per linear foot of pipe.
(Ord. of 3-1-2005(02), app. E, § 2.04)
(a)
When necessary to protect structures, paving or facilities, the sides of all excavations shall be sufficiently sheeted, shored and braced whenever necessary to prevent slides, cave-ins, settlement or movement of the banks and to maintain the excavation clear of obstructions that will, in any way, hinder or delay the progress of the work or endanger workers. Wood or steel sheet piling of ample design and type shall be used when necessary. All sheeting, shoring and bracing shall have sufficient strength and rigidity to withstand the pressures exerted and to maintain the walls of the excavation properly in place and protect all persons and property from injury or damage.
(b)
Where excavations are made adjacent to existing buildings or other structures or in paved streets or alleys, the contractor shall take particular care to sheet, shore and brace the sides of the excavation adequately so as to prevent any undermining of or settlement beneath such structures or pavement. The contractor will be liable for any damage to any structure or any injury to any person that results from his operations.
(c)
Sheeting and shoring materials shall be withdrawn as trenches are being backfilled, after backfill has been placed over pipe at least 18 inches. If their removal before backfill is complete endangers any adjacent structure, they shall be left in place until backfill is complete and pulled then, if possible. Voids caused by sheeting withdrawals shall be backfilled and tamped with thin rammers designed for the purpose. If not withdrawn, sheeting shall be cut off at least 18 inches below surface.
(d)
Sheeting, shoring and bracing shall be considered as an integral part of the excavation work and no specific payment will be allowed therefor.
(Ord. of 3-1-2005(02), app. E, § 2.05)
(a)
Where the excavation area shown on the plans falls under the groundwater surface or near the banks of a flowing stream or other body of water, the contractor may adopt and carry out any method he may deem feasible for the performance of the excavation work and for the protection of the work thereafter, provided the method and equipment to be used result in completed work which complies with the specifications and is acceptable to the engineer. In such cases, the excavation area shall be effectively protected from damage during the excavation period and until all contemplated construction work therein has been completed. Underwater excavation shall be in accord with the current United States Corps of Engineers National Permit for water line crossing of waterways.
(b)
The cost of all temporary construction work necessary or incidental to work under water or in wet conditions, including the cost of installing and removing sand bags, coffer dams, sheet piling, excavation and backfill, pumping and dewatering, shall be considered as an integral part of the cost of excavation, and no separate payment therefor shall be allowed or made.
(Ord. of 3-1-2005(02), app. E, § 2.07)
(a)
Excavation for structures shall be sufficiently large for the proper placing of forms and concrete and for dewatering purposes but shall not be excessively large in horizontal area. Banks may be sloped at a safe angle provided that such excavation does not endanger or damage existing or proposed structures, pipelines, etc. The bottom of the excavation shall be true to the required shape and elevations shown on the plans. No earth backfilling will be permitted under structures unless specifically shown on the plans. Should the contractor excavate below the elevations shown or specified, he shall fill the void thus made with thoroughly compacted, dense graded, crushed stone, with aggregate (sand cushion) acceptable to the engineer, or with class C concrete at no additional cost to the owner.
(b)
When muck, quicksand, soft clay, or other materials unsuitable for foundations are encountered extending beyond the limits of the excavation, such materials shall be removed and replaced with thoroughly compacted, dense graded, crushed stone, with aggregate (sand cushion) acceptable to the engineer, or with class C concrete.
(c)
In all cases where materials are deposited along open excavation, they shall be placed so that, in the event of rain, no damage will result to the work or adjacent property.
(Ord. of 3-1-2005(02), app. E, § 2.08)
(a)
The backfilling of pipeline trenches shall be started immediately after the pipe work has been inspected and approved by the engineer. Backfill material shall consist of fine loose earth free of large clods, stones, vegetable matter, debris, and/or other objectionable material. Backfill shall be carefully deposited in six-inch layers (before compaction) on each side of the pipe and then thoroughly and carefully tamped or rammed around the pipe with approved power tools until enough material has been placed and compacted to provide a cover of not less than one foot over the top of the pipe. If the trench extends along or across streets, roadways, proposed roadways, usable alleys or sidewalks, the remainder of the trench shall be backfilled and tamped to its full depth in the manner specified above with a minimum density of 95 percent standard proctor for the full depth. Otherwise, it may be filled with loose material without compaction. Where tamping of material is not required for the full depth of the trench, this material (from a height of one foot above the pipe upward) shall be as hereinbefore specified, except that a broken stone content of not more than 50 percent by volume will be allowed of stones not exceeding six-inch maximum dimensions, provided that these stones are thoroughly mixed with earth.
(b)
Before being placed under pavement, earth material for backfill which is, in the opinion of the engineer, too dry to allow thorough compaction, shall receive an admix of sufficient water prior to compaction to insure such compaction. Earth material considered by the engineer to have excessive water content shall not be placed.
(c)
Backfill material having less than a ten percent clay content may be compacted by puddling with water in lieu of tamping when authorized by the engineer. Such puddling shall consist of applying water under pressure to the entire content of the trench beginning near the trench bottom and working through pipes or well points.
(d)
Backfill materials used shall contain a sufficient amount of moisture for proper compaction. In areas to be paved and areas not to be paved but inside road rights-of-way, the backfill shall be brought up in accordance with section 30-300(a) and compacted to not less than 95 percent of standard proctor.
(e)
Compaction tests will be required at varying depths and intervals determined by the engineer. Tests shall be made by a qualified independent testing laboratory selected by the engineer. The owner shall pay for all compaction testing. However, in the event that such tests fail to meet the requirements of the specifications, the expense of such tests shall be borne by the contractor.
(f)
Where the test results indicate that compaction is less than the allowable minimum specified in section 30-300(a), the material will be removed to the depths and limits determined by the engineer and new material placed and compacted to minimum standards at no additional cost to the owner.
(g)
Where excavation has been made within the limits of easements across private property, the top one foot of backfill material shall consist of fine loose earth free of large clods, vegetable matter, debris, stone and/or other objectionable materials.
(h)
Where tamping of backfill material is not required for the full depth, the backfill material shall be neatly rounded over the trench to a sufficient height to allow for settlement to grade after consolidation. Any deficiency in the quantity of materials for backfilling the trenches or for filling the depressions caused by settlement shall be supplied by the contractor.
(i)
Where pipe trenches are cut across pavement, the contractor shall construct a temporary surface over the cut by filling and tamping the upper six inches of the cut with selected gravel or crushed stone which will not disintegrate under the traffic and which shall be maintained in good condition under traffic until the permanent pavement has been constructed. No specific payment will be allowed for temporary surfacing.
(j)
All backfilling shall be done in a manner which will not disturb or injure the pipe or structure over or against which it is being placed. Any pipe or structure injured, damaged or moved from its proper alignment during backfilling operations shall be opened up and then rebackfilled as herein specified.
(k)
The contractor shall replace all surface materials and shall restore drives, curbing, sidewalks, gutters, shrubbery, fences, sod, and other disturbed surfaces to a condition equal to that before the work began, furnishing all labor and materials incidental thereto. No payment for such items shall be made unless specifically stated in these specifications and or in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 2.09)
(a)
Sand cushion shall consist of either coarse sand, gravel, or crushed stone. All cushion material shall pass a 1½-inch screen, and 90 percent shall be retained on 20 mesh screen. The material shall be handled on the job so that it will be kept clean and free of dirt, clay, and other foreign matter and will retain its ability to pass water freely.
(b)
Sand cushion shall be used at the following locations:
(1)
At locations shown on the plans or when specified to provide bedding for pipe where rock has been removed from the trench;
(2)
In local areas where rock has been removed from the pipe trench and the excavated materials are not suitable for bedding the pipe; and
(3)
In local areas where unsuitable materials such as muck, quicksand, soft clay, swampy material or excessive groundwater make it necessary to provide a satisfactory pipe foundation.
(c)
Sand cushion used to provide bedding for pipe where rock has been removed from the trench shall be placed to the overall width of trench, which shall be as specified in section 30-298(a). It shall be placed to the depth of six inches below the bottom of the pipe. Sand cushion used to provide additional bedding for pipe installed in deep cuts shall be placed to the width and depth shown on the plans or as directed by the engineer.
(d)
Sand cushion under structures shall be placed in the areas and to the depth shown on the plans or as authorized by the engineer.
(e)
Cushion material shall be compacted by tamping with suitable tools and shaped to receive the pipe and to support the full length of the barrel of the pipe at exact line and grade.
(f)
All costs pertaining to sand cushion requirements contained herein shall be included in the unit price bid per foot of pipe submitted in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 2.10)
(a)
All materials removed by excavation which are suitable for the purpose shall be used whenever practicable for fills, embankments, backfilling pipe trenches, and for such other purposes as may be shown on the plans or authorized by the engineer. All materials not used for such purposes shall be considered as waste materials and disposed of by the contractor. Disposal shall be in accordance with all applicable permits (United States Corps of Engineers National Permit).
(b)
Waste materials may be deposited in waste banks at locations authorized by the engineer. Such materials shall not be left in unsightly piles but shall be spread in uniform layers and neatly leveled and shaped. Waste banks shall be provided with adequate openings to permit surface drainage of adjacent lands.
(c)
Upon completion of any part of the work, proper disposal shall be made of all surplus or unused materials left within the construction limits of such work and the surface of the work left in a neat and workmanlike condition.
(d)
Disposal of excavated materials shall be considered an integral part of the excavation work and no separate payment therefor will be allowed.
(Ord. of 3-1-2005(02), app. E, § 2.11)
(a)
All excavated areas, backfills, embankments, trenches and access roads, grading and ditches shall be maintained by the contractor in good condition at all times until final acceptance by the owner. Where trench backfill has settled, trenches shall be rebackfilled.
(b)
At the end of each work week, the contractor shall inspect road surfaces where excavations have been made and make all necessary repairs to the surfaces disturbed by the construction work.
(Ord. of 3-1-2005(02), app. E, § 2.12)
(a)
Where pipe trenches are cut across paved driveways, a temporary surface, as specified in section 30-298(i) shall be provided before permanent pavement patch is made.
(b)
Where pipe is installed running longitudinally with paving, installation of backfill shall be done in accordance with section 30-298(a).
(c)
Payment for pavement replacement shall be per linear foot of pipeline covered and shall include excavation, class A concrete trench cap, and surfacing material. Trench widths are considered to be widths specified in section 30-294(c), and extra paving width due to sloping trench sides shall be done at no additional cost to owner.
(d)
Contractor shall be responsible for any pavement replacement that is made necessary by construction equipment while working on off-road excavation.
(e)
Where pipe trenches cut across or along dirt or gravel based roads or driveways, installation of backfill shall be according to section 30-298(a).
(Ord. of 3-1-2005(02), app. E, § 2.13)
(a)
In locations where piping is installed across grass areas, the contractor shall be responsible for reseeding or resodding all disturbed areas. Such areas shall be restored as nearly as possible to original condition and no specific payment shall be made for this item of work.
(b)
Sod replacement due to erosion on steep slopes will be done at no additional cost to the owner.
(c)
Grassing will be in accord with the erosion control plans and as specified in the special conditions.
(Ord. of 3-1-2005(02), app. E, § 2.14)
All associated costs shall be at developer's expense.
(Ord. of 3-1-2005(02), app. E, § 2.15)
The work to be done under this division of the specifications consists of furnishing all materials and performing all labor necessary for the complete construction of additions to the water distribution system, including all piping, valves, service connections, fire hydrants and connections to the well and tank site piping, as indicated on the drawings and/or specified.
(Ord. of 3-1-2005(02), app. E, § 3.01)
All materials used in the construction shall be new and unused when delivered to the site and shall be subject to inspection by the engineer before installation.
(Ord. of 3-1-2005(02), app. E, § 3.02)
(a)
Within 30 days after notice to proceed is issued, the contractor shall submit, for the approval of the engineer, shop drawings and/or manufacturer's description sheets for the following materials and/or equipment (valves, hydrants, and meters shall be current items in use by the city, as confirmed by the public works director):
(1)
Piping and fittings;
(2)
Valves and valve boxes;
(3)
Fire hydrants;
(4)
Tapping sleeves and valves; and
(5)
Meters, boxes, and service pipe/fittings.
(b)
Submittals shall include six copies for each item. Drawings and manufacturer's descriptive material shall include sufficient detail to clearly establish that the item submitted meets the specifications.
(c)
Items installed without approval of the engineer shall be subject to removal and replacement at no additional cost to owner.
(Ord. of 3-1-2005(02), app. E, § 3.03)
(a)
Excavation and backfill shall be as specified in division 2 of this article.
(b)
All lines shall be installed in accordance with section 30-294(b) except as indicated on the contract drawings or required by utility accommodation permits.
(Ord. of 3-1-2005(02), app. E, § 3.04)
(a)
Polyvinyl chloride (PVC) plastic pipes shall be in accordance with the following:
(1)
Bell-and-ring type integral bell or gasketed coupling, and conform to all requirements of AWWA C-900 latest edition. Class 150 pipe only shall be used.
(2)
Manufactured by Clow Corporation, Certainteed Products Corporation, Uponor ETI Company or approved equal.
(3)
Pipe, fittings and appurtenances shall be not more than six months old.
(b)
Fitting for six inches or larger PVC pipe shall be manufactured of ductile iron, grade 80-55-06 in accordance with ASTM A-536. Fittings shall have mechanical joints or push-on joints with gaskets meeting ASTM F-477. Fittings shall have radii of curvatures conforming to AWWA C110 and shall be cement lined in accordance with AWWA C104. The price of PVC fittings shall be included in the per foot price bid for PVC pipe.
(c)
Fittings for PVC pipe smaller than six inches shall use either PVC fittings supplied by the pipe manufacturer or ductile iron fittings as specified above at the contractor's option.
(Ord. of 3-1-2005(02), app. E, § 3.05)
(a)
Ductile cast iron pipe supplied shall be push-on, mechanical or flanged joint, as indicated on the drawings.
(b)
Mechanical or push-on joint ductile cast iron pipe shall:
(1)
Conform to AWWA C106 or C108;
(2)
Be thickness class 53, AWWA C150;
(3)
Be cement-lined in accordance with AWWA C104;
(4)
Be rated working pressure 150 psi, AWWA C151;
(5)
Have rubber-gasket joints conforming to AWWA C111.
(c)
The weight, casting period, and class or nominal thickness shall be shown on each pipe. The manufacturers mark, the year in which the pipe was produced, and the letters "DI" or "DUCTILE" shall be clear and legible, and all cast marks shall be on or near the bell.
(Ord. of 3-1-2005(02), app. E, § 3.06)
(a)
Fittings for ductile cast iron pipe shall be mechanical joint ductile iron fittings conforming to AWWA C110 and shall have a working pressure of 250 psi.
(b)
Fittings shall be cement-lined in accordance with AWWA C104.
(c)
The price of fittings shall be included in the per ton price bid for ductile iron pipe fittings.
(Ord. of 3-1-2005(02), app. E, § 3.07)
(a)
New water lines shall be connected to existing water lines at locations shown on the drawings.
(b)
At locations where new a line connects into an existing main and/or where an existing main is disconnected and plugged, the cost shall be included in the per foot price bid for pipe. The cost shall be for removal of existing fittings, valves and piping as required for the connection as shown on the drawings. Payments for new valves shall be made separately, where applicable, as stated in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 3.08)
(a)
Concrete surge blocks shall be installed at all bends of 11¼ degrees or greater in the pipeline, and at all valves, plugs, tees, and caps. Concrete shall be of a mix not leaner than one part cement to 2½ parts sand and five parts stone, and shall have a compressive strength of not less than 2,000 psi after 28 days.
(b)
Surge blocks shall be of mass concrete with minimum dimensions not less than the block dimensions shown on the drawings. In no case shall surge blocks be poured so that piping connections are covered so as to prevent removal of fittings or valves.
(c)
Surge blocks shall be backed against firm, undisturbed earth. Any extra concrete volume required due to over-excavation shall be installed at no additional cost to the owner.
(d)
Surge blocks in place shall be paid for at the unit price bid for concrete blocking in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 3.09)
(a)
Gate valves shall be located as shown on the drawings and installed as detailed on the drawings, complete with cast iron valve boxes. Any valve which cannot be easily hand-operated from ground surface shall be provided with operating extension by the contractor. The contractor shall provide at least two operating handles for each different sized operating nut on valves in the system.
(b)
Gate valves four inches through 24 inches shall be resilient wedge type in compliance with AWWA C509, latest revision, with ductile iron wall thickness that meets or exceeds AWWA C153 ductile iron fittings. Gate valves shall be rated for 250 psi cold water working pressure and hydrostatically tested at 500 psi. Gate valves shall meet UL-FM standards. Valve body, bonnet, wedge and operating nuts shall be constructed of ductile iron. The exterior of the wedge shall be 100 percent rubber encapsulated. The wedge shall be symmetrical and seal equally well with flow in either direction.
(c)
Operating nuts shall be constructed of ductile iron and shall have four flats at stem connection to assure even input torque to the stem. All gaskets shall be pressure energized O-rings. Bolts shall follow ANSI A161.1. Allen screws or metric bolting shall not be allowed. Stem shall be sealed by three O-rings. The top two O-rings shall be replaceable with valve fully opened and while subject to fully rated working pressure. O-rings set in cartridge shall not be allowed. Valves shall have two thrust washers with one located above and one below the thrust collar to assure trouble-free operation of the valve. All internal and external surfaces of the valve body and bonnet shall have a fusion bonded epoxy coating complying with ANSI/AWWA C550, applied hydrostatically prior to assembly. The epoxy coating shall be of the orange color. Valves shall be American Flow Control Series 2500.
(Ord. of 3-1-2005(02), app. E, § 3.10)
(a)
Tapping valves shall comply with the above specifications, and shall include the following as well.
(b)
Tapping valves shall be flanged x-mechanical joint connection. The flanged-end connector shall have a raised face or alignment lip. A quarter-inch undersize cutter may be used unless otherwise specified.
(Ord. of 3-1-2005(02), app. E, § 3.11)
(a)
All hydrants shall meet or exceed AWWA C-502, latest revision for dry-top fire hydrants. Hydrants must meet UL-FM standards. The hydrant shall be of traffic-model type, rated at 250 psi and hydrostatically tested at 500 psi The hydrant main valve shall be of compression type opening against pressure and closing with pressure and shall not be less than 5¼-inch opening.
(b)
All operating parts shall be of bronze material in full compliance with AWWA C502, section 2.2.5-01. The seat and seat ring must be bronze to bronze. Bronze to cast iron seating will not be accepted. The hydrant shall have a 1½-inch pentagon one piece bronze operating nut and open left (counterclockwise). The hydrant shall be a tree-way design, with two 2½-inch hose nozzles and one 4½-inch pumper nozzle. The nozzle threads must meet city specifications. Hydrants must have a breakaway traffic feature and be designed for 360 degree rotation of the nozzle section. Friction loss through the pumper nozzle shall not exceed 3.0 psi per 1,000 gpm at 60 psi working pressure.
(c)
The hydrant base and lower barrel shall be made of the same material. Hydrants shall allow for easy installation of extensions and repair at the ground line without having to shut off the water main. All interior parts shall be accessible through the top of the hydrant without excavation. Lubrication can be either by grease or oil. Allen head screws may be used in location of inserting lubrication, otherwise no Allen head screws or metric bolting will be allowed. The bolts shall meet ASTM A-307 grade B, in accordance with the requirements of specification of ASTM B-633. The hydrant valve assembly shall be a three-piece design consisting of a valve top, valve bottom and the hydrant valve rubber. A one-piece valve assembly will not be accepted.
(d)
Upon request, all hydrant manufacturers shall furnish a list of ten cities that have used the submitted hydrant for at least ten years. All hydrants must have a ten-year warranty, identified from the cast date on the upper barrel of the hydrant.
(e)
Approved hydrants are American Darling B-84-B, Mueller A-423, or preapproved hydrants.
(Ord. of 3-1-2005(02), app. E, § 3.12)
(a)
Pipe, appurtenances, and fittings shall be laid to the line and grade established on the plans or as directed by the engineer. The minimum cover, as stated in section 30-294(b), shall be maintained over all pipe unless otherwise indicated. The bed for the pipe is to be shaped either by trimming the bottom of the trench or by placing excavated earth thereon and tamping so that each piece of pipe has uniform bearing. The trench shall be further excavated around each bell or hub so that it will be entirely clear of the ground and leave ample room for making joints.
(b)
The inside of the bells and the outside of the spigots shall be thoroughly cleaned before they are placed. The inside of all pipe shall be thoroughly swabbed to insure that the pipe is clean and free of obstruction and foreign matter until the work is completed.
(c)
Where pipe laying ceases at the end of the day or for any cause, the end of the pipe shall be securely closed in order to prevent the entrance of water, mud, or any other objectionable matter.
(d)
The contractor shall furnish and install a no. 14 copper wire or detection tape in the trenches for all PVC mains and service lines. The wire shall be placed on top of the pipe and secured thereto to prevent movement during the backfill operation. The tape shall be placed approximately 12 inches below the ground surface and shall be joined by a common bond. The detection tape shall be continuously printed with the words "Buried Water Main Below." The tape shall be "Terra Tape" as manufactured by Reef Industries, Inc., or approved equal.
(Ord. of 3-1-2005(02), app. E, § 3.13)
(a)
All valves, service lines and connections shall be subject to inspection and approval by the inspector on the job before being covered and backfilled.
(b)
Items covered without approval of the inspector shall be uncovered for inspection and rebackfilled at no additional cost to owner.
(Ord. of 3-1-2005(02), app. E, § 3.14)
(a)
All branches of the new distribution system shall be disinfected in accordance with AWWA C601-68. The slug method, as defined in AWWA C601-68, shall be the method used. The form of chlorine used shall be calcium hypochlorite.
(b)
After each section of piping is disinfected and flushed clear of chlorine, the contractor shall take samples for bacteriological analysis to an approved independent testing laboratory in accordance with the department of environmental regulation.
(c)
Copies of sample reports shall be furnished to the owner, the contractor and the engineer.
(d)
Should the samples fail to be acceptable, the contractor shall be obligated to again disinfect the system completely, flush the system clear and have additional samples taken for analysis.
(e)
The contractor shall notify the inspector at least 48 hours prior to the chlorination of the system and shall provide the necessary apparatus and labor for conducting the tests.
(f)
No separate payment will be made for disinfecting and sampling. The cost of these operations shall be included in the unit price bid for pipe.
(Ord. of 3-1-2005(02), app. E, § 3.15)
(a)
Water service connections shall include tapping saddles on all sizes of mains, three-fourths inches corporation stop at main, three-fourths inches diameter service pipe from main to meter, five-eighths inches × three-fourths inches meter, three-fourths inches curb stop, meter box and all fittings through the outlet end of the service line of the meter, to the limits as indicated on the drawings.
(b)
Service piping shall be polybutylene service pipe, PB 2110, manufactured from polybutylene as defined by ASTM D2581, type II, grade I, rated at a working pressure of 160 psi at 73 degrees Fahrenheit, meeting requirements of the National Sanitation Foundation and dimensional tolerances of ASTM D2666. Piping connection shall be made by the compression method.
(c)
Corporation stops shall be three-quarter inches minimum, bronze with Mueller threads and compression joint outlets, or approved equals.
(d)
Tapping saddles shall be Dresser Style 194 or approved equal.
(e)
Curb stops shall be Mueller 110, or approved equal, with connectors for polybutylene pipe.
(f)
Service take-offs from the main shall be made from the top quadrant of the main, with the axis of tap being no more than 45-degrees in inclination from the vertical.
(g)
Extreme care shall be taken to provide adequate compaction and support under the service tubing adjacent to the main in order to prevent deflection of the tubing at the point of connection to the corporation stop.
(h)
Service meters shall be as follows:
(1)
Meters shall be five-eighths by three-quarter inches positive displacement, magnetic drive, and shall conform with AWWA specifications C700 for cold water service (current city make/model).
(2)
Registers shall be direct-reading in U.S. gallons and be hermetically sealed.
(3)
Measuring chambers shall be made of bronze or plastic polymer.
(4)
The complete meter shall be guaranteed for not less than five years.
(5)
Meters shall be manufactured by Neptune, Badger, Kent, Rockwell or approved equal.
(6)
The bidder shall submit complete data on touch-read system compatible with and warranted by meter manufacturer.
(i)
Meter box shall have minimum dimensions of 18½ inches in length by 13¼ inches in width by 12 inches in depth with cast iron lockless cover. Meter box shall be the "Superflexon" model as supplied by Southern Meter and Supply Company, Inc., or approved equal.
(j)
Payment for service connections shall include all the items detailed on the drawings and/or described herein and shall be paid for at the price bid in the bid schedule.
(k)
Payment for jacked or bored service lines shall be made separately at the price bid in the bid schedule.
(Ord. of 3-1-2005(02), app. E, § 3.16)
No separate payment will be made for work under this section of the specifications, except as set forth in the bid schedule. The cost of such work and all costs incidental thereto shall be included in the price bid for the item to which the work pertains.
(Ord. of 3-1-2005(02), app. E, § 3.17)
This division covers hydrostatic pressure and leakage testing in the new water main, which shall be performed by the contractor, in accordance with the AWWA specification C600, as specified herein, and as directed by the engineer.
(Ord. of 3-1-2005(02), app. E, § 4.01)
(a)
The pressure and leakage tests shall be performed on the entire line.
(b)
All concrete reaction blocking and anchorage shall be in place and ready for use before the line is initially filled with water.
(Ord. of 3-1-2005(02), app. E, § 4.02)
Water for filling the line will be furnished through the system under construction or imported by the contractor. The contractor shall not be charged for water provided through the system.
(Ord. of 3-1-2005(02), app. E, § 4.03)
(a)
The contractor shall furnish all materials, equipment and labor necessary to connect the line to be tested and the source of water supply, together with test pumping equipment, water meter, pressure gauge, and other equipment, materials and facilities required for the tests.
(b)
Test pressures shall be applied by means of a force pump of such design and capacity that the required pressure can be applied and maintained without interruption for the duration of the test.
(c)
The water meter and the pressure gauge shall be accurately calibrated and shall be acceptable to the inspector.
(Ord. of 3-1-2005(02), app. E, § 4.04)
(a)
The pipeline shall be subjected to a pressure test for the purpose of testing the line stability and for defective materials or workmanship.
(b)
A test pressure of 50 psi above working pressure shall then be applied and maintained for a period of not less than one hour and for whatever longer period may be necessary to complete the inspection of the line and to locate any and all defective joints and pipeline materials.
(c)
If the pressure test discloses that repairs or replacements are needed, such repairs or replacements shall be made, the line refilled, and the test pressure applied as before; this operation shall be repeated until the line withstands the test pressure in a satisfactory manner.
(Ord. of 3-1-2005(02), app. E, § 4.05)
(a)
The contractor shall conduct a leakage test after the pressure test has been satisfactorily completed.
(b)
The duration of each leakage test shall be two hours, and during the test the main shall be subjected to 150 psi based on the elevation of the lowest point in the section of line to be tested and corrected to the elevation of the test gauge.
(c)
For the purpose of this section, the term "leakage" means the quantity of water that must be supplied into the section of pipe being tested to maintain the specified leakage test pressure after the air in the pipeline has been released and the pipe has been filled with water.
(d)
The maximum allowable leakage shall not exceed ten gallons per inch of pipe diameter per mile per day.
(e)
If any test of the pipeline indicates leakage in excess of the allowable amount, the contractor shall locate and repair the defective joints, and the line shall be retested at no additional cost to the owner.
(f)
The contractor shall furnish the engineer with a written report of the results of each test that identifies the length of pipe tested, the pressure, the duration of the test, and the amount of leakage. The report shall be signed by the contractor.
(g)
No portion of the pipeline and appurtenances which has not successfully met the pressure and leakage tests shall be eligible for payment.
(Ord. of 3-1-2005(02), app. E, § 4.06)
The contractor shall bear the cost of testing, incidental to system expansion.
(Ord. of 3-1-2005(02), app. E, § 4.07)