Should the existence of wetlands be indicated after a review of the requirements of Subsection 2, above, a wetlands delineation shall be performed by a licensed professional engineer, hydrogeologist, soil scientist, or similarly qualified professional experienced in wetland ecology, with the selection of such party to be at the discretion of the applicant. Plans shall be submitted to the Township for review that show the delineation and indicate any disturbance of wetlands anticipated. The qualifications of the consultant performing the delineation shall be submitted with such plans. Further, unless it is clearly evident in such plans and/or by any field review of the Township Engineer that there are no designated wetlands or, if there are, that no disturbance to the designated wetlands is anticipated, the delineation performed shall be submitted to the appropriate regulatory agencies, including, but not limited to, the U.S. Army Corps of Engineers and the Pennsylvania Department of Environmental Protection for boundary confirmation and/or requisite wetland permits. All potential impact on wetlands shall conform to applicable regulations, as amended.