AS-OF-RIGHT SITING
"As-of-right siting" shall mean that development may proceed without the need for a special permit, variance, amendment, waiver, or other discretionary approval. As-of-right development shall be subject to site plan review to determine conformance with local zoning ordinances or bylaws. Projects cannot be prohibited, but can be reasonably regulated by the Building Inspector or, if there is none in a town, the Board of Selectmen, or person or board designated by local ordinance or bylaw.
BUILDING INSPECTOR
The Inspector of Buildings, Building Commissioner, or local inspector, or person or board designated by local ordinance or bylaw charged with the enforcement of the zoning ordinance.[1]
BUILDING PERMIT
A construction permit issued by an authorized building inspector; the building permit evidences that the project is consistent with the state and federal building codes as well as local zoning bylaws, including those governing ground-mounted large-scale solar photovoltaic installations.
LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATION
A solar photovoltaic system that is structurally mounted on the ground and is not roof-mounted, and has a minimum nameplate capacity of 250 kW DC.
ON-SITE SOLAR PHOTOVOLTAIC INSTALLATION
A solar photovoltaic installation that is constructed at a location where other uses of the underlying property occur.
RATED NAMEPLATE CAPACITY
The maximum rated output of electric power production of the photovoltaic system in direct current (DC).
SITE PLAN REVIEW
Review by the site plan review authority to determine conformance with local zoning ordinances or bylaws.
SITE PLAN REVIEW AUTHORITY
For purposes of this article, "site plan review authority" refers to the Town of Freetown Planning Board.
ZONING ENFORCEMENT AUTHORITY
The person or board charged with enforcing the zoning ordinances or bylaws.