General provisions. Prior to the granting of final approval, the developer shall have installed improvements required by the Planning Board or have posted a performance guarantee or surety sufficient to cover the cost of said improvements. The Planning Board may solicit local, county, state, federal, public or semipublic agencies and knowledgeable individuals on what improvements shall be required. Improvements recommended by other agencies, such as a utilities authority, county, state or other governmental agencies, may be required by the Planning Board as a condition of final approval. The following construction standards and improvements are necessary to protect the health, safety, welfare and convenience of the residents and public, as well as needed to meet local, county, regional, state and national goals and objectives. It is recognized however, that in peculiar situations, all of the improvements listed below may not be appropriate or needed.
(1)
Borough standards.
(a)
All standards and specifications of the Borough as now or hereafter adopted and applicable ordinances shall govern the design, construction and installation of all improvements.
(b)
Failure of the developer, his contractor or agent to conform to said specifications shall be just cause for the suspension of the work being performed. No developer shall have the right to demand or claim damages from the Borough, its officers, agents or servants by reason of said suspension.
(2)
Other standards.
(a)
In the event that the Borough has not adopted standards for as specific type of improvement, then generally accepted engineering standards as set forth in engineering and construction manuals, as may be approved and modified by the Borough Engineer for a specific situation, shall be used.
(b)
Gas, electric, telephone and similar utilities shall be installed in accordance with applicable company, state and federal requirements.
(3)
Grades. All construction stakes and grades shall be set by a licensed land surveyor in the employ of the subdivider, developer or contractor. One copy of all cut sheets, signed by a land surveyor or professional engineer, shall be filed with the Borough Engineer 48 hours prior to the commencement of any construction.
(4)
Inspection. Prior to the start of the construction or installation of such improvements, the developer shall advise the Borough Engineer 48 hours prior to the commencement of such work. No underground installation shall be covered until inspected and approved by the appropriate official. If, during installation of any of the required improvements, the developer fails to meet specification requirements or to correct unacceptable work, the developer shall be notified in writing, by certified mail, that the developer has failed to comply with specifications or to correct unacceptable work properly, and said notice shall set forth in detail what has not been properly installed. If within 10 days after mailing of such notice the developer has failed to perform in accordance with the notice, the Borough shall then cause the notice of failure to comply to be served upon the developer and a copy shall be sent to the governing body and the Planning Board.