Flood Overlay District
Massachusetts Department of Conservation and Recreation |
251 Causeway Street, Suite 800 |
Boston, MA 02114-2104 |
Federal Emergency Management Agency, Region I |
99 High Street, 6th Floor |
Boston, MA 02110 |
FEMA Region I Risk Analysis Branch Chief |
99 High St., 6th floor, Boston, MA 02110 |
And copy of notification to: |
Massachusetts NFIP State Coordinator |
MA Dept. of Conservation & Recreation |
251 Causeway Street |
Boston, MA 02114 |
Any variances from the provisions and requirements of the above-referenced state regulations may only be granted in accordance with the required variance procedures of these state regulations. |
13.7.3.2.1 | If three or more recreational vehicles are proposed, the applicant shall additionally demonstrate compliance with 105 CMR 440.000: Minimum Standards for Developed Family-Type Campgrounds (State Sanitary Code, Chapter VI). |
Flood Overlay District
Massachusetts Department of Conservation and Recreation |
251 Causeway Street, Suite 800 |
Boston, MA 02114-2104 |
Federal Emergency Management Agency, Region I |
99 High Street, 6th Floor |
Boston, MA 02110 |
FEMA Region I Risk Analysis Branch Chief |
99 High St., 6th floor, Boston, MA 02110 |
And copy of notification to: |
Massachusetts NFIP State Coordinator |
MA Dept. of Conservation & Recreation |
251 Causeway Street |
Boston, MA 02114 |
Any variances from the provisions and requirements of the above-referenced state regulations may only be granted in accordance with the required variance procedures of these state regulations. |
13.7.3.2.1 | If three or more recreational vehicles are proposed, the applicant shall additionally demonstrate compliance with 105 CMR 440.000: Minimum Standards for Developed Family-Type Campgrounds (State Sanitary Code, Chapter VI). |