In the AG, FA-10, FA-25, FA-70, RD1, RD-2.5, RD-4 and RD-5 Districts, an individual property owner may locate a mobile home, complying with all of the requirements of the BOCA Code of the State of New Jersey, on the property while a permanent dwelling is being constructed, provided that:
(a) The dwelling being constructed shall be the primary residence of the property owner.
(b) The mobile home shall not be placed on site until all permits for construction of the permanent dwelling have been filed with the Township.
(c) The mobile home shall not be occupied for a period in excess of one year.
(d) The mobile home is located in compliance with all applicable setback standards of the zone in which the property is located.
(e) During the time of occupancy, the mobile home shall be connected to the permanent potable water supply and sanitary waste disposal systems on site.
(f) The mobile home shall be disconnected from all utilities within 30 days of issuance of a certificate of occupancy for the permanent dwelling.