Establishment of Districts
District | Map Symbol |
|---|---|
Rural Districts | |
Natural Areas District | NA |
Agricultural District | A |
Agricultural Residential District | AR |
Rural Centers District | RC |
Residential Districts | |
Single-Family Residential District | R-1 |
Two-Family Residential District | R-2 |
Multifamily Residential District | R-3 |
Village District | V |
Commercial Districts | |
Residential-Office District | RO |
General Commercial District | C-1 |
Cultural District | CU |
Village Commercial | VC |
Industrial Districts | |
General Industrial District | I-1 |
Corridor Overlay District | COD |
Historic Resources Overlay | HROD |
Type of WCF/Application | Notice of Incompleteness | Final Decision |
|---|---|---|
Eligible facilities request | 30 calendar days from receipt of initial application; 10 calendar days from receipt of supplemental application for subsequent notices | 60 total calendar days from receipt of initial application |
Small WCF (collocated) | 10 business days from receipt of initial or supplemental application | 60 total calendar days from receipt of initial application |
Small WCF (new or replacement wireless support structure | 10 business days from receipt of initial or supplemental application | 90 total calendar days from receipt of initial application |
Nontower WCF | 30 calendar days from receipt of application for initial notice; 10 calendar days from receipt of supplemental application for subsequent notices | 90 total calendar days from receipt of initial application |
Tower-based WCF | 30 calendar days from receipt of application for initial notice; 10 calendar days from receipt of supplemental application for subsequent notices | 150 total calendar days from receipt of initial application |
Lot Requirements | Yard Setback Requirements | |||||
|---|---|---|---|---|---|---|
Minimum Size | Minimum Width (feet) | Maximum Coverage | Front (feet) | Side (feet) | Rear (feet) | Maximum Height (feet) |
3,000 square feet | 50 | 25% | Lots <10,000 square feet: 20 | 10 | 30 | 35 |
Maximum Size | ||||||
1 acre | 50 | 25% | Lots >10,000 square feet: 20 | 15 | 50 | 35 |
Use | Number of Required Parking Spaces |
|---|---|
All retail and service establishments, except those listed below: | 1.5 per 250 square feet of retail and service floor area |
Barbers and beauticians | 2 per chair |
Business, professional and financial offices | 1 per 400 square feet of floor area |
Medical/dental offices | 5 per practitioner, based on maximum design capacity |
Cafe, deli, coffee shop, caterer | 1 per 4 persons, based on maximum design capacity |
Child/adult day care | 1.5 per client |
Community center | 1 per 3 persons, based on maximum design capacity |
Public library, museum, civic building | 1 per 400 square feet of floor area |
Parent Tract Acreage | Exempt Lots Permitted |
|---|---|
6.5 to 9.99 | 1 |
10 to 19.99 | 2 |
20 to 39.99 | 3 |
Table 5.1 Yield Plan Minimum Lot Standards | |
|---|---|
Minimum Lot Area | 60,000 square feet |
Minimum Lot Frontage | 50 feet |
Front Yard Setback | 50 feet |
Side Yard Setback | 50 feet |
Rear Yard Setback | 75 feet |
Development Option | Minimum Greenway Land Required |
|---|---|
Country lots option | No greenway land required |
Estate lots option | 40% of parent tract acreage |
Density-neutral lots option | 60% of parent tract acreage |
Density-bonus lots option | 70% of parent tract acreage |
Village lots option | 80% of parent tract acreage |
Flexible design lots option | 65% of parent tract acreage |
Table 9.1 | ||||||||
|---|---|---|---|---|---|---|---|---|
Minimum/Maximum Lot Size (acre) | Minimum Lot Width (feet) | Front Yard Setback (feet) | Side Yard Setback (feet) | Rear Yard Setback (feet) | Maximum Building Height (feet) | Maximum Coverage | Maximum Impervious Coverage | |
Country lots | 10/none | 300 | 50 | 100 | 75 | 35 | 10% | 20% |
Estate lots | 5/9.99 | 300 | 50 | 100 | 75 | 35 | 10% | 20% |
3/4.99 | 150 at the building setback line, 100 at the street line | 50 | 50 | 75 | 35 | 20% | 40% | |
Density-neutral lots | 0.5/2.99 | 75 at the building setback line, 50 at the street line | 20 on local and collector streets, 50 on arterial streets | 10 | 50 | 35 | 30% | 40% |
Density bonus lots | 0.3/1 | 50 | 20 on local and collector streets, 50 on arterial streets | 10 | 30 | 35 | 30% | 40% |
Village lots | 7,500 square feet/0.5 | 50 | 20 on local and collector streets, 50 on arterial streets | 81 | 30 | 35 | 30% | 40% |
1 | Zero lot-line dwellings, in conformance with § 12-7.12, are permitted on village lots. |
Establishment of Districts
District | Map Symbol |
|---|---|
Rural Districts | |
Natural Areas District | NA |
Agricultural District | A |
Agricultural Residential District | AR |
Rural Centers District | RC |
Residential Districts | |
Single-Family Residential District | R-1 |
Two-Family Residential District | R-2 |
Multifamily Residential District | R-3 |
Village District | V |
Commercial Districts | |
Residential-Office District | RO |
General Commercial District | C-1 |
Cultural District | CU |
Village Commercial | VC |
Industrial Districts | |
General Industrial District | I-1 |
Corridor Overlay District | COD |
Historic Resources Overlay | HROD |
Type of WCF/Application | Notice of Incompleteness | Final Decision |
|---|---|---|
Eligible facilities request | 30 calendar days from receipt of initial application; 10 calendar days from receipt of supplemental application for subsequent notices | 60 total calendar days from receipt of initial application |
Small WCF (collocated) | 10 business days from receipt of initial or supplemental application | 60 total calendar days from receipt of initial application |
Small WCF (new or replacement wireless support structure | 10 business days from receipt of initial or supplemental application | 90 total calendar days from receipt of initial application |
Nontower WCF | 30 calendar days from receipt of application for initial notice; 10 calendar days from receipt of supplemental application for subsequent notices | 90 total calendar days from receipt of initial application |
Tower-based WCF | 30 calendar days from receipt of application for initial notice; 10 calendar days from receipt of supplemental application for subsequent notices | 150 total calendar days from receipt of initial application |
Lot Requirements | Yard Setback Requirements | |||||
|---|---|---|---|---|---|---|
Minimum Size | Minimum Width (feet) | Maximum Coverage | Front (feet) | Side (feet) | Rear (feet) | Maximum Height (feet) |
3,000 square feet | 50 | 25% | Lots <10,000 square feet: 20 | 10 | 30 | 35 |
Maximum Size | ||||||
1 acre | 50 | 25% | Lots >10,000 square feet: 20 | 15 | 50 | 35 |
Use | Number of Required Parking Spaces |
|---|---|
All retail and service establishments, except those listed below: | 1.5 per 250 square feet of retail and service floor area |
Barbers and beauticians | 2 per chair |
Business, professional and financial offices | 1 per 400 square feet of floor area |
Medical/dental offices | 5 per practitioner, based on maximum design capacity |
Cafe, deli, coffee shop, caterer | 1 per 4 persons, based on maximum design capacity |
Child/adult day care | 1.5 per client |
Community center | 1 per 3 persons, based on maximum design capacity |
Public library, museum, civic building | 1 per 400 square feet of floor area |
Parent Tract Acreage | Exempt Lots Permitted |
|---|---|
6.5 to 9.99 | 1 |
10 to 19.99 | 2 |
20 to 39.99 | 3 |
Table 5.1 Yield Plan Minimum Lot Standards | |
|---|---|
Minimum Lot Area | 60,000 square feet |
Minimum Lot Frontage | 50 feet |
Front Yard Setback | 50 feet |
Side Yard Setback | 50 feet |
Rear Yard Setback | 75 feet |
Development Option | Minimum Greenway Land Required |
|---|---|
Country lots option | No greenway land required |
Estate lots option | 40% of parent tract acreage |
Density-neutral lots option | 60% of parent tract acreage |
Density-bonus lots option | 70% of parent tract acreage |
Village lots option | 80% of parent tract acreage |
Flexible design lots option | 65% of parent tract acreage |
Table 9.1 | ||||||||
|---|---|---|---|---|---|---|---|---|
Minimum/Maximum Lot Size (acre) | Minimum Lot Width (feet) | Front Yard Setback (feet) | Side Yard Setback (feet) | Rear Yard Setback (feet) | Maximum Building Height (feet) | Maximum Coverage | Maximum Impervious Coverage | |
Country lots | 10/none | 300 | 50 | 100 | 75 | 35 | 10% | 20% |
Estate lots | 5/9.99 | 300 | 50 | 100 | 75 | 35 | 10% | 20% |
3/4.99 | 150 at the building setback line, 100 at the street line | 50 | 50 | 75 | 35 | 20% | 40% | |
Density-neutral lots | 0.5/2.99 | 75 at the building setback line, 50 at the street line | 20 on local and collector streets, 50 on arterial streets | 10 | 50 | 35 | 30% | 40% |
Density bonus lots | 0.3/1 | 50 | 20 on local and collector streets, 50 on arterial streets | 10 | 30 | 35 | 30% | 40% |
Village lots | 7,500 square feet/0.5 | 50 | 20 on local and collector streets, 50 on arterial streets | 81 | 30 | 35 | 30% | 40% |
1 | Zero lot-line dwellings, in conformance with § 12-7.12, are permitted on village lots. |