[Amended 7-13-2010 by Ord. No. O-10-16; 8-20-2013 by Ord. No. O-13-23]
No development application shall be accepted unless submitted in plat form, and no plat shall be accepted for consideration unless it conforms to the
Application Checklist as to form, content and accompanying information, and complies with the provisions of N.J.S.A. 46-23-1 et seq. (Map Filing Law),
as amended. All plats shall be drawn by a land surveyor as required by law, licensed to practice in the State of New Jersey, and shall bear the signature, seal, license number and address of the land surveyor except that plate submitted under the preliminary discussion provisions of §
188-101 and sketch plats of minor subdivisions and minor site plans are exempt from this requirement. All drawings of improvements shall be signed and sealed by a licensed professional engineer of the State of New Jersey. These plats shall contain a legend setting forth the names and addresses of all individuals or entities as set forth in §
188-105. The following shall also be provided:
Soil percolation tests requirements.
Soil percolation tests shall be performed for all developments containing buildings that at the time of construction will not be connected to a public sewage disposal system.
Soil percolation tests shall be made in accordance with applicable state and local regulations and shall be performed in the presence of a member of the Monmouth County Board of Health; it shall be the applicant's responsibility to arrange said percolation test with the Monmouth County Board of Health.
Percolation tests shall be performed at the location or locations of the proposed on-site sanitary sewage disposal facility or facilities throughout the tract being developed.
The applicant shall submit a detailed report of the results of the tests at the time of minor subdivision or the preliminary application.
The results of the soil percolation tests shall be analyzed by the Planning Board considering the characteristics of the tract being developed and the general area surrounding the tract being developed, and the final location of all improvements on the tract shall be based on said analysis.
The zoning requirements applicable to the preliminary approval first granted and all other rights conferred upon the developer pursuant to the Municipal Land Use Law, whether conditionally or otherwise, shall not be changed for a period of two years after the date of final approval. If the developer has followed the standards prescribed for final approval, the approving authority may extend such period of protection for extensions of one year, but not to exceed three extensions. Upon granting of final approval, the rights conferred upon the application by the granting of preliminary approval shall be terminated upon final approval.
In the case of a subdivision of 150 acres or more, the approving authority may grant the rights referred to in the above subsection for such period of time, longer than two years, as shall be determined by the approving authority to be reasonable taking into consideration the number of dwelling units permissible under final approval, economic conditions and the comprehensiveness of the development. The developer may apply for thereafter, and the approving authority may thereafter grant, an extension of final approval for such additional period of time as shall be determined by the approving authority to be reasonable taking into consideration the number of dwelling units permissible under final approval, the number of dwelling units remaining to be developed, economic conditions and the comprehensiveness of the development.
The granting of preliminary plat approval shall not confer on the applicant any rights to construct improvements prior to final approval.
Existing and proposed streams, lakes, ponds, and marsh areas accompanied by the following data:
When a running stream with a drainage area of 1/2 square mile or greater is proposed for alteration, improvement, or relocation, or when a structure or fill is proposed over, under, in or along such a running stream, evidence of approval, required alternations, lack of jurisdiction, or denial of the improvement by the New Jersey Division of Water Policy and Supply shall accompany the plat.
Cross sections and profiles of watercourses at an appropriate scale showing the extent of the flood fringe area, top of bank, normal water level and bottom elevations at the following locations:
All watercourses within or adjacent to the development and at any point where a watercourse crosses a boundary of the development (profile and cross sections).
At fifty-foot intervals for a distance of 500 feet upstream and downstream of any existing or proposed culvert or bridge within the development (cross section).
At a maximum of one-hundred-foot intervals, but at no less than two locations, along each watercourse which runs through or adjacent to the development (cross section).
When ditches, streams, brooks, or watercourses are to be altered, improved or relocated, the method of stabilizing slopes and measures to control erosion and siltation during construction as well as typical ditch sections and profiles shall be shown on the plat or accompany it.
The total upstream acreage in the drainage basin of any watercourse running through or adjacent to a development. For flowing streams, small-scale watershed maps developed from USGS sheets shall be submitted.
The total acreage in the drainage basin to the nearest downstream drainage structure and the acreage in that portion of the development which drains to the structure.
The location and extent of all existing or proposed drainage and conservation easements and flood hazard area and floodway lines.
The location, extent and water level elevation of all existing or proposed lakes or ponds on or within 300 feet of the development.
Plans and computations for any storm drainage systems including the following:
All existing or proposed storm sewer lines within or on lands or roads adjacent to the development and for all required off-site and off-tract drainage improvements showing size, profile and slope of the lines, direction of flow, and the location of each catch basin, inlet, manhole, culvert, and headwall.
The location and extent of any proposed dry wells, groundwater recharge basins, detention basins, flood control devices, sedimentation basins or other water conservation devices.
An itemization of all improvements to be made to the site as required in Article
XV and such other improvements on site, off site and off tract as the public interest may require, together with a listing of the work and materials to be used in installing such improvements, including estimated quantities of necessary materials, sufficient to enable the Municipal Engineer to formulate a performance guarantee estimate.
If the development is planned to be constructed in phases, the developer is required to submit a phasing plan to the Board.
The following standardized plat symbols are to be used on all plats that are submitted to the Planning Board, Board of Adjustment or Environmental Commission when depicting the following items which are required to be shown upon plats submitted to the aforementioned boards or commission:
A perennial stream shall be depicted upon the plat as a series of irregular lines periodically interrupted by a series of three dots.
An intermittent stream shall be depicted upon a plat by an irregular line periodically broken by a single dot.
A wetlands area shall be depicted upon the plat by using the standard symbol for a depression and placing inside the depression area the standard symbol for marsh or tree symbol or other standard symbol showing the type of growth located within the wetlands area.
The boundary of transition zones shall be depicted by using the standard depression symbol.
A ridgeline separating two different watersheds shall be depicted by an irregular, slightly wider line, broken at regular intervals by an "X."
A ridgeline that is contained entirely within the bounds of one watershed and constitutes a subbasin shall be depicted by an irregular line separated by smaller lines that are angled 90° off the main line.
If a fifth line is used to depict contour lines at ten-foot vertical intervals, the fifth line shall be darker and wider and will be determined to be an intermediate contour line.
Data standards.
This data standard has been established to manage both hardcopy (paper) and electronic data submittals required by the Township of Howell. These standards are part of the comprehensive Township initiative to best manage, inventory and utilize information. This subsection contains the submittal standards for planning application data. The data submittals will be divided into the following two categories: application documents and design documents. Within these groups data will be submitted in either paper copy or electronic copy as outlined in these standards.
The Township of Howell intends to move toward the elimination of paper copy documents and as such intends to eliminate paper processes, where appropriate, which are obsolete or redundant.
Standard electronic format for application documents.
File type. The required format is an archival standards compatible portable document format (PDF/A) file generated directly from document files. They should be compatible with the latest Adobe Acrobat version readers.
Scanned images of report text are not acceptable as the text cannot be searched.
Scanned correspondence bearing the original signature and seal shall be included.
Scanned documents will only be accepted when the native electronic files are not available or developed for the application.
File naming. Application documents and report file names should be named utilizing a reasonable descriptive naming convention.
Font should be those commonly available such as Times New Roman or Arial. Other fonts may not readily open or print from all computers. Less common fonts that are used (for instance ESRI symbols) must be embedded to allow printing in all environments.
Security settings must be set so as to allow searching of text, printing at full resolution, adding comments (to facilitate electronic comment by reviewers, and for users to annotate their own copies if they wish), content copying and extraction (to facilitate preparation of management direction, and quoting of materials in other documents), making changes related to document assembly to allow users to rotate pages and create bookmarks and thumbnails to facilitate use of the document.
Resolution. Minimum resolution for scanned documents shall be in accordance with the New Jersey Division of Archives and Records Management (NJDARM) as per N.J.A.C. 15:3.4.
Cartography. Information on maps should be easily understood when reproduced in black and white. Sole reliance on color to convey information means maps cannot be faxed or usefully printed in black and white. Where color is necessary or useful, it should be combined with techniques like line coding and patterned fills to ensure all users can extract the information. This principle applies also to labels and other layers added to images.
Submissions must be on current accepted media.
All digital media shall be provided with the following label data on both the media and media container:
Township of Howell, tax block, and lot number.
CAD file standards.
Computer-aided design (CAD) is a tool used for producing design documentation and plan sets required for the planning application process. It can also provide a common medium of information exchange. In fact, the true power and potential of CAD is the ability to reuse and share the information contained within the CAD document. The key to realizing this potential is common organizing principles and standards for the production and dissemination of CAD information. The standard organization of files, layers and entities, as well as standardized software applications is essential for effective work and communication.
This subsection establishes performance standards for CAD data provided to the Township of Howell with the application package. The Township of Howell does not intend to influence the methods or means of practice of outside consultants. Consultants may use any CAD system to develop design documents as long as the delivered data conforms to the Township's CAD data standards.
Much of the CAD data created through the planning process will be utilized to update the Township tax maps and brought into the Township and/or county GIS parcel data system. Data received by the Township of Howell must follow these CAD data standards to be readily useful within that system.
Electronic CAD files for minor subdivisions, final site plans and final subdivisions shall be submitted in conformance with the standards listed below:
CAD drawings. Consultants shall deliver, at minimum, a CAD document in electronic format to the Township of Howell. The document(s) must include all supporting CAD data and must be delivered as follows:
In the native CAD format as read only.
In the CAD "dwg" file format.
Using the data structure defined by these standards.
No externally referenced data is permitted. All data referenced must be included in the file submitted.
File naming shall comply with the standards established for application documents.
Text and fonts. Utilize only industry-wide supported fonts, no custom fonts can be accepted. All fonts shall be provided with CAD file.
Layers. Specific layers shall be created and drawings organized in conformance with the most current naming convention developed by the New Jersey Digital Tax Map Task Force; see http://www.state.nj.us/treasury/taxation/lpt/digitaltaxmaps.shtml.
When possible, proposed lots, easements and rights-of-way shall be comprised of closed polygons.
Easement and parcel boundaries shall be coincident in the CAD file when coincident on ground.
All drawings shall be unrotated and created at 1 to 1 "full scale."
Coordinate reference. All submittals, paper and digital, shall be in NAD 83 (current) New Jersey State Plane Coordinates in U.S. Survey Feet and North American Vertical Datum 1988 (current) and in accordance with all other provisions of P.L. 1960, c. 141 (N.J.S.A. 46:23-9.9 et seq.), the Map Filing Law.
There shall be endorsed upon any map, plat or plan submitted to the Planning Board or Zoning Board a certification by the Township Engineer stating the following: "I have carefully examined this map and the required digital submissions and to the best of my knowledge and belief find it conforms with the provisions of the Township ordinances and requirements applicable thereto." There shall also be provided a line for the Township Engineer's signature and professional seal.