[Added 6-9-2014 ATM, AG approved 7-1-2014]
BUILDING INSPECTOR
The Inspector of Buildings, Building Commissioner, or local inspector charged with the enforcement of the State Building Code.
BUILDING PERMIT
The permit issued in accordance with all applicable requirements of the Massachusetts State Building Code (780 CMR).
HEIGHT
The height of a wind turbine measured from natural grade to the tip of the rotor blade at its highest point, or blade-tip height.
RATED NAMEPLATE CAPACITY
The maximum rated output of electric power production equipment. This output is typically specified by the manufacturer with a nameplate on the equipment.
SITE PLAN REVIEW AUTHORITY
The Planning Board is herby designated as the site plan review authority to review site plans.
SPECIAL PERMIT REQUIREMENTS
Development of all land-based wind energy facilities, except those within the definition of renewable and alternative energy research and development facilities in Article II of this bylaw, shall require the issuance of a special permit and shall meet all requirements for site plan approval under §§ 270-6.7 and 270-11.5B. The special permit granting authority for land-based wind energy facilities shall be the Planning Board.
UTILITY-SCALE WIND ENERGY FACILITY
A commercial wind energy facility, where the primary use of the facility is electrical generation to be sold to the wholesale electricity markets.
WIND ENERGY FACILITY
All of the equipment, machinery, and structures together utilized to convert wind to electricity. This includes, but is not limited to, transmission, storage, collection and supply equipment, substations, transformers, service and access roads.
WIND MONITORING OR METEOROLOGICAL TOWER
A temporary tower equipped with devices to measure wind speed and direction, to determine how much electricity a wind energy facility can be expected to generate.
ZONING ENFORCEMENT AUTHORITY
The Building Commissioner is the person or board charged with enforcing the Zoning Bylaw within the Town of Lakeville.