Stormwater Regulations
Table 1 Stormwater Data by Zoning Districts | |||
|---|---|---|---|
Zone | Major Permitted Areas | Minimum Lot Area (square feet) | Percent of Impervious Area for Design |
R-1 | Single-Family Dwellings | 7,500 | 70 |
R-2 | General Residential | 12,500 | 60 to 70 |
MH | Mobile Home Park District | 3,500 to 4,000 | 30 |
C-1 | Commercial District | 7,500 to 12,500 | 60 to 70 |
A | Agricultural District | 43,560 (1 acre) | 70 |
I | Industrial District | ||
Type of Facility | Design Frequency |
|---|---|
Detention basins | 25-year |
Primary drainage systems | 25-year |
Bridges | 50-year |
Secondary drainage systems, i.e., crossdrains and ditches for internal subdivision drainage. | 15-year |
Equation 1 |
R = (Rd-Ru) |
Where: | |||
R | = | Differential runoff rate | |
Rd | = | C.I. factor for developed conditions | |
Ru | = | C.I. factor for undeveloped conditions | |
Equation 2 |
V = R x A x 30 (min) x 60 (sec/min) |
Where: | |||
V | = | Total volume of detention | |
R | = | Differential runoff rate | |
A | = | Area of project in acres | |
Tb = Base time of hydrograph for developed project without detention |
Tb = sixty (60) minutes |
Tp = Time for peak runoff of developed project |
Tp = twenty (20) minutes |
Qd = Total peak runoff of developed project in cfs |
Qd = A x Rd (see Equation 1) |
Qu = Total peak runoff of unimproved project in cfs |
Qu = A x Ru (see Equation 1) |
A = Total area of project in acres |
Tq = Assumed time of peak differential for unimproved project |
Tq = Qu/Qd x 40 |
Tr = Assumed recedence time differential for discharge at rates no greater than unimproved condition |
Tr = (30 Qd/Qu) - 60 |
V = Volume of detention |
V = (Qd - Qu) x 30 (min) x 60 (sec/min) |
Equation 3 |
T p = D/2 + .6Tc |
Where: | |||
T p | = | Time of peak discharge of developed project in minutes | |
D | = | 20 min = storm duration in minutes | |
Equation 4 |
Tb = 2.67 T p |
Equation 5 |
(Qd Tr = Tb _____ -1) (Qu |
Where: | |||
Tr | = | Additional time required for discharge at a rate no greater than that of the undeveloped condition | |
Qd | = | Total peak runoff of improved project in cfs | |
Equation 6 |
Qd = A x Rd (See Equation 1) Qu = Total runoff of unimproved project in cfs |
Equation 7 |
Qu = A x Ru (see Equation 1) |
Equation 8 |
V = 1/2 (Qd - Qu) Tb |
Table 2 Average C.I. (P.I.) Factors in CFS Per Acre 20 Min. Inlet Time | |||||
|---|---|---|---|---|---|
% Impervious Area | C or P (Factor) | 15 Years | 25 Years | 50 Years | 100 Years |
5 | 0.37 | 1.7 | 2.00 | 2.18 | 2.37 |
10 | 0.39 | 1.79 | 2.11 | 2.30 | 2.50 |
15 | 0.41 | 1.89 | 2.21 | 2.42 | 2.62 |
20 | 0.435 | 2.0 | 2.35 | 2.57 | 2.78 |
25 | 0.455 | 2.09 | 2.46 | 2.68 | 2.91 |
30 | 0.475 | 2.10 | 2.57 | 2.80 | 3.04 |
35 | 0.495 | 2.28 | 2.68 | 2.92 | 3.17 |
40 | 0.52 | 2.39 | 2.81 | 3.07 | 3.33 |
45 | 0.54 | 2.48 | 2.92 | 3.19 | 3.46 |
50 | 0.56 | 2.58 | 3.02 | 3.30 | 3.58 |
55 | 0.58 | 2.68 | 3.13 | 3.42 | 3.71 |
60 | 0.60 | 2.76 | 3.24 | 3.54 | 3.84 |
65 | 0.625 | 2.88 | 3.38 | 3.69 | 4.00 |
70 | 0.645 | 2.97 | 3.48 | 3.81 | 4.13 |
75 | 0.665 | 3.06 | 3.59 | 3.92 | 4.26 |
80 | 0.685 | 3.15 | 3.70 | 4.04 | 4.38 |
85 | 0.705 | 3.24 | 3.81 | 4.16 | 4.51 |
90 | 0.73 | 3.36 | 3.94 | 4.31 | 4.67 |
95 | 0.75 | 3.45 | 4.05 | 4.43 | 4.80 |
100 | 0.77 | 3.54 | 4.16 | 4.54 | 4.93 |
Rainfall | 4.60 | 5.40 | 5.90 | 6.40 | |
From U.S. Weather Bureau Technical Paper No. 40: "Rainfall Frequency Atlas of the United States for durations from thirty (30) minutes to twenty-four (24) hours and Return Periods from one (1) year to one hundred (100) years." |
Facility | Maintenance Access Width |
|---|---|
Open drainage channel or facility | 30 feet, 15 feet each side |
Greenways | Width of greenway |
Pipes and culverts | 15 feet, centered |
Detention areas | 15 feet continuous around total area |
Connecting access | 15 feet |
Stormwater Regulations
Table 1 Stormwater Data by Zoning Districts | |||
|---|---|---|---|
Zone | Major Permitted Areas | Minimum Lot Area (square feet) | Percent of Impervious Area for Design |
R-1 | Single-Family Dwellings | 7,500 | 70 |
R-2 | General Residential | 12,500 | 60 to 70 |
MH | Mobile Home Park District | 3,500 to 4,000 | 30 |
C-1 | Commercial District | 7,500 to 12,500 | 60 to 70 |
A | Agricultural District | 43,560 (1 acre) | 70 |
I | Industrial District | ||
Type of Facility | Design Frequency |
|---|---|
Detention basins | 25-year |
Primary drainage systems | 25-year |
Bridges | 50-year |
Secondary drainage systems, i.e., crossdrains and ditches for internal subdivision drainage. | 15-year |
Equation 1 |
R = (Rd-Ru) |
Where: | |||
R | = | Differential runoff rate | |
Rd | = | C.I. factor for developed conditions | |
Ru | = | C.I. factor for undeveloped conditions | |
Equation 2 |
V = R x A x 30 (min) x 60 (sec/min) |
Where: | |||
V | = | Total volume of detention | |
R | = | Differential runoff rate | |
A | = | Area of project in acres | |
Tb = Base time of hydrograph for developed project without detention |
Tb = sixty (60) minutes |
Tp = Time for peak runoff of developed project |
Tp = twenty (20) minutes |
Qd = Total peak runoff of developed project in cfs |
Qd = A x Rd (see Equation 1) |
Qu = Total peak runoff of unimproved project in cfs |
Qu = A x Ru (see Equation 1) |
A = Total area of project in acres |
Tq = Assumed time of peak differential for unimproved project |
Tq = Qu/Qd x 40 |
Tr = Assumed recedence time differential for discharge at rates no greater than unimproved condition |
Tr = (30 Qd/Qu) - 60 |
V = Volume of detention |
V = (Qd - Qu) x 30 (min) x 60 (sec/min) |
Equation 3 |
T p = D/2 + .6Tc |
Where: | |||
T p | = | Time of peak discharge of developed project in minutes | |
D | = | 20 min = storm duration in minutes | |
Equation 4 |
Tb = 2.67 T p |
Equation 5 |
(Qd Tr = Tb _____ -1) (Qu |
Where: | |||
Tr | = | Additional time required for discharge at a rate no greater than that of the undeveloped condition | |
Qd | = | Total peak runoff of improved project in cfs | |
Equation 6 |
Qd = A x Rd (See Equation 1) Qu = Total runoff of unimproved project in cfs |
Equation 7 |
Qu = A x Ru (see Equation 1) |
Equation 8 |
V = 1/2 (Qd - Qu) Tb |
Table 2 Average C.I. (P.I.) Factors in CFS Per Acre 20 Min. Inlet Time | |||||
|---|---|---|---|---|---|
% Impervious Area | C or P (Factor) | 15 Years | 25 Years | 50 Years | 100 Years |
5 | 0.37 | 1.7 | 2.00 | 2.18 | 2.37 |
10 | 0.39 | 1.79 | 2.11 | 2.30 | 2.50 |
15 | 0.41 | 1.89 | 2.21 | 2.42 | 2.62 |
20 | 0.435 | 2.0 | 2.35 | 2.57 | 2.78 |
25 | 0.455 | 2.09 | 2.46 | 2.68 | 2.91 |
30 | 0.475 | 2.10 | 2.57 | 2.80 | 3.04 |
35 | 0.495 | 2.28 | 2.68 | 2.92 | 3.17 |
40 | 0.52 | 2.39 | 2.81 | 3.07 | 3.33 |
45 | 0.54 | 2.48 | 2.92 | 3.19 | 3.46 |
50 | 0.56 | 2.58 | 3.02 | 3.30 | 3.58 |
55 | 0.58 | 2.68 | 3.13 | 3.42 | 3.71 |
60 | 0.60 | 2.76 | 3.24 | 3.54 | 3.84 |
65 | 0.625 | 2.88 | 3.38 | 3.69 | 4.00 |
70 | 0.645 | 2.97 | 3.48 | 3.81 | 4.13 |
75 | 0.665 | 3.06 | 3.59 | 3.92 | 4.26 |
80 | 0.685 | 3.15 | 3.70 | 4.04 | 4.38 |
85 | 0.705 | 3.24 | 3.81 | 4.16 | 4.51 |
90 | 0.73 | 3.36 | 3.94 | 4.31 | 4.67 |
95 | 0.75 | 3.45 | 4.05 | 4.43 | 4.80 |
100 | 0.77 | 3.54 | 4.16 | 4.54 | 4.93 |
Rainfall | 4.60 | 5.40 | 5.90 | 6.40 | |
From U.S. Weather Bureau Technical Paper No. 40: "Rainfall Frequency Atlas of the United States for durations from thirty (30) minutes to twenty-four (24) hours and Return Periods from one (1) year to one hundred (100) years." |
Facility | Maintenance Access Width |
|---|---|
Open drainage channel or facility | 30 feet, 15 feet each side |
Greenways | Width of greenway |
Pipes and culverts | 15 feet, centered |
Detention areas | 15 feet continuous around total area |
Connecting access | 15 feet |