Use-Specific Standards
Purpose. The purpose of Section 4.01 is to establish standards for specific uses to minimize negative impacts on neighboring properties, implement State and federal law, and ensure the orderly development of a diversity of land uses within the County. These standards will provide uniform criteria for development approval, protect the public health, safety and welfare, and protect property values and economic development. These standards are consistent with and support the Comprehensive Plan.
Effective on: 1/1/1901
Purpose. The purpose of the Adaptive Reuse Standards is to foster the appropriate and compatible adaptive reuse of obsolete or underutilized historically significant structures to:
Applicability. Structures meeting the eligibility requirements of Section 4.09.B are permitted to be adaptively reused in accordance with the standards of this Section.
| Table 4.09-1. Additional Uses Permitted as Adaptive Reuse | ||
|---|---|---|
| Current Zoning District | Permitted as Adaptive Reuse1 | |
| 1 | Zoning districts that permit residential uses, except zoning districts that permit only SFD dwelling units (TRC, SN, SCN, TC, TCN, RC, R-8, R-16, R-24, PD-MUB, PD-AAAR) | 100% attainable housing regardless of the dwelling unit type permitted in the Zoning District (SFD, SFA), MFS, and/or MFA) provided the dwelling units are developed pursuant to Sections 9.01.B, C, E, and I of the ADU Program requirements, Sections 9.02.A, B, C, D, and I of the UHNU Program requirements, or Section 9.03 of the AHU Program requirements. |
| 2 | Zoning districts that permit SFD, SFA, and/or MFS dwelling units (TRC, SN, SCN, TC, TR, TSN, TCN, AR-1, AR-2, CR, RC, JLMA, R, PD-MUB) | SFD dwelling unit converted to up to 4 dwelling units or 4 live/work dwellings |
| 3 | Any zoning district that does not currently permit the use | Commercial Uses, except for the following uses: Kennel; Kennel, Indoor; Dry Cleaning Plant; Convenience Store (with Gasoline Sales); and all Automotive uses |
| 4 | Any zoning district that does not currently permit the use | Industrial/Production: Wood, Metal, and Stone Crafts use only. The Wood, Metal, and Stone Crafts use is not permitted to exceed 7,500 sf. The use may be located in an accessory building that meets the criteria of Section 4.09.B. |
| 5 | Any zoning district that does not currently permit the use | Lodging Uses |
| 6 | Any zoning district that does not currently permit the use | Public, Civic, Institutional Uses, except for the following uses: Hospital; Recreation, Indoor; Recreation, Outdoor or Major; and Shooting Range, Indoor |
TABLE KEY: SFD = single-family detached, SFA = single-family attached, MFS = multifamily stacked, MFA = multifamily attached, and sf = square feet TABLE NOTE: 1Uses also must comply with any applicable Use-Specific Standards in Chapter 3. | ||
| Table 4.09-1. Additional Uses Permitted as Adaptive Reuse | ||
|---|---|---|
| Current Zoning District | Permitted as Adaptive Reuse1 | |
| 1 | Zoning districts that permit residential uses, except zoning districts that permit only SFD dwelling units (TRC, SN, SCN, TC, TCN, RC, R-8, R-16, R-24, PD-MUB, PD-AAAR) | 100% attainable housing regardless of the dwelling unit type permitted in the Zoning District (SFD, SFA), MFS, and/or MFA) provided the dwelling units are developed pursuant to Sections 9.01.B, C, E, and I of the ADU Program requirements, Sections 9.02.A, B, C, D, and I of the UHNU Program requirements, or Section 9.03 of the AHU Program requirements. |
| 2 | Zoning districts that permit SFD, SFA, and/or MFS dwelling units (TRC, SN, SCN, TC, TR, TSN, TCN, AR-1, AR-2, CR, RC, JLMA, R, PD-MUB) | SFD dwelling unit converted to up to 4 dwelling units or 4 live/work dwellings |
| 3 | Any zoning district that does not currently permit the use | Commercial Uses, except for the following uses: Kennel; Kennel, Indoor; Dry Cleaning Plant; Convenience Store (with Gasoline Sales); and all Automotive uses |
| 4 | Any zoning district that does not currently permit the use | Industrial/Production: Wood, Metal, and Stone Crafts use only. The Wood, Metal, and Stone Crafts use is not permitted to exceed 7,500 sf. The use may be located in an accessory building that meets the criteria of Section 4.09.B. |
| 5 | Any zoning district that does not currently permit the use | Lodging Uses |
| 6 | Any zoning district that does not currently permit the use | Public, Civic, Institutional Uses, except for the following uses: Hospital; Recreation, Indoor; Recreation, Outdoor or Major; and Shooting Range, Indoor |
TABLE KEY: SFD = single-family detached, SFA = single-family attached, MFS = multifamily stacked, MFA = multifamily attached, and sf = square feet TABLE NOTE: 1Uses also must comply with any applicable Use-Specific Standards in Chapter 3. | ||
| Table 4.09-2. Adaptive Reuse Incentives | |||
|---|---|---|---|
| Incentive | Existing Floor Area | New Floor Area | |
| 1 | Floor Area Ratio (FAR). Regardless of whether an adaptive reuse is for residential or nonresidential purposes, an existing building that exceeds the maximum Floor Area Ratio (FAR) allowed by SPEX in the underlying Zoning District may use all existing floor area for the purposes of adaptive reuse without SPEX approval provided that no exterior changes to the existing building are made. Additions to existing buildings that add new floor area may exceed the permitted FAR in an underlying zoning district up to the maximum FAR permitted by Special Exception without Special Exception approval. | + | + |
| 2 | Loading Space. New loading spaces pursuant to Section 7.06.09 are not required for adaptive reuse. | + | |
| 3 | Off-Street Parking. The required number of parking spaces must be the lesser of the number of spaces that existed on the site as of the adoption date of this Zoning Ordinance, or the minimum number of spaces required by Section 7.06.02 Once the adaptive reuse is established, the number of spaces must be maintained and not reduced. | + | |
| 4 | Open Space. Existing nonresidential lots that do not conform to open space requirements of the applicable Zoning District pursuant to Section 7.02 are permitted to be adaptively reused without meeting the open space requirement. | + | + |
| 5 | Rear Yards. Additions to existing principal buildings may encroach into rear yards pursuant to Section 10.03. The encroachment must be within 50% of the average rear yard of principal buildings on the same side of the road within 150 feet of both sides of the lot or lots eligible for adaptive reuse. | + | |
| 6 | Residential Density. All SFD, SFA, MF stacked dwelling units, including live/work dwelling units, resulting from a converted SFD as permitted in Table 4.09-1 only count as the original SFD dwelling unit when calculating the maximum dwelling unit per acre density requirements of the Zoning District or proffered rezoning. | + | |
| 7 | Side Yards. Additions to existing principal buildings may encroach into side yards pursuant to Section 10.03. The encroachment must be within 50% of the average side yard of principal buildings on the same side of the road within 150 feet of both sides of the lot or lots eligible for adaptive reuse. | ||
| 8 | Site Plan Review. No land development application fee is required for the first 2 submissions of a Site Plan for an adaptive reuse that is less than 3,000 square feet of gross floor area and located in an HOD or a VCOD. | + | |
| Table 4.09-2. Adaptive Reuse Incentives | |||
|---|---|---|---|
| Incentive | Existing Floor Area | New Floor Area | |
| 1 | Floor Area Ratio (FAR). Regardless of whether an adaptive reuse is for residential or nonresidential purposes, an existing building that exceeds the maximum Floor Area Ratio (FAR) allowed by SPEX in the underlying Zoning District may use all existing floor area for the purposes of adaptive reuse without SPEX approval provided that no exterior changes to the existing building are made. Additions to existing buildings that add new floor area may exceed the permitted FAR in an underlying zoning district up to the maximum FAR permitted by Special Exception without Special Exception approval. | + | + |
| 2 | Loading Space. New loading spaces pursuant to Section 7.06.09 are not required for adaptive reuse. | + | |
| 3 | Off-Street Parking. The required number of parking spaces must be the lesser of the number of spaces that existed on the site as of the adoption date of this Zoning Ordinance, or the minimum number of spaces required by Section 7.06.02 Once the adaptive reuse is established, the number of spaces must be maintained and not reduced. | + | |
| 4 | Open Space. Existing nonresidential lots that do not conform to open space requirements of the applicable Zoning District pursuant to Section 7.02 are permitted to be adaptively reused without meeting the open space requirement. | + | + |
| 5 | Rear Yards. Additions to existing principal buildings may encroach into rear yards pursuant to Section 10.03. The encroachment must be within 50% of the average rear yard of principal buildings on the same side of the road within 150 feet of both sides of the lot or lots eligible for adaptive reuse. | + | |
| 6 | Residential Density. All SFD, SFA, MF stacked dwelling units, including live/work dwelling units, resulting from a converted SFD as permitted in Table 4.09-1 only count as the original SFD dwelling unit when calculating the maximum dwelling unit per acre density requirements of the Zoning District or proffered rezoning. | + | |
| 7 | Side Yards. Additions to existing principal buildings may encroach into side yards pursuant to Section 10.03. The encroachment must be within 50% of the average side yard of principal buildings on the same side of the road within 150 feet of both sides of the lot or lots eligible for adaptive reuse. | ||
| 8 | Site Plan Review. No land development application fee is required for the first 2 submissions of a Site Plan for an adaptive reuse that is less than 3,000 square feet of gross floor area and located in an HOD or a VCOD. | + | |
Effective on: 1/1/1901
Yard. An attached Accessory Dwelling is subject to all yard requirements applicable to the Accessory Building or principal structure in which it is located. A detached Accessory Dwelling located within an Accessory Building is subject to front yard and setback requirements applicable in the zoning district and may be located 5 feet from side and rear lot lines provided there are no windows or doors on the portion that encroaches into the required yard and setback applicable in the zoning district.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
Effective on: 1/1/1901
Intensity and Character.
(ZOAM-2024-0003, 02/12/2025)
Effective on: 2/12/2025




| Table 4.02.05-1. Intensity/Character | |||
|---|---|---|---|
| Use | Minimum Size of Lot | Maximum Number of Residents | |
| 1 | Level I – small scale | 5 acres | 5-10 residents |
| 2 | Level II – medium scale | 10 acres | 11-20 residents |
| 3 | Level III – large scale | 20 acres | 21-30 residents |
| 4 | Level IV – requires Special Exception approval pursuant to Section 10.11 | 30 acres | 31-40 residents |
| Table 4.02.05-1. Intensity/Character | |||
|---|---|---|---|
| Use | Minimum Size of Lot | Maximum Number of Residents | |
| 1 | Level I – small scale | 5 acres | 5-10 residents |
| 2 | Level II – medium scale | 10 acres | 11-20 residents |
| 3 | Level III – large scale | 20 acres | 21-30 residents |
| 4 | Level IV – requires Special Exception approval pursuant to Section 10.11 | 30 acres | 31-40 residents |
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025


Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025



Blocks containing SFD and SFA dwelling units must include an alley;
Garages must be alley-loaded; garages must not face or be accessed from any road within the Town Center Core;
Front entrances must be a minimum of 3 feet above the grade of the sidewalk.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025



Blocks containing MFS dwellings must include an alley;
Garages must be alley-loaded; garages must not face or be accessed from any road within the Town Center Core; and
Front entrances must be a minimum of 3 feet above the grade of the sidewalk;
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Private Parties.
Private parties at a Bed and Breakfast Homestay, Bed and Breakfast Inn, Country Inn, or Rural Resort are subject to the maximum attendees, times, and durations described below:
| Table 4.03.01-1. Private Parties | |||
|---|---|---|---|
| Use | Maximum Attendees (including overnight guests) for Parties Allowed on Daily Basis | Times per Calendar Year Parties May Exceed Maximum Daily Guests | |
| 1 | Bed and Breakfast Homestay | 20 | 10 |
| 2 | Bed and Breakfast Inn | 50 | 20 |
| 3 | Country Inn | 100 | 20 |
| 4 | Rural Resort as Event Facility (Section 4.03.01.H.6) | Section 4.04.05 | Section 4.04.05 |
| Table 4.03.01-1. Private Parties | |||
|---|---|---|---|
| Use | Maximum Attendees (including overnight guests) for Parties Allowed on Daily Basis | Times per Calendar Year Parties May Exceed Maximum Daily Guests | |
| 1 | Bed and Breakfast Homestay | 20 | 10 |
| 2 | Bed and Breakfast Inn | 50 | 20 |
| 3 | Country Inn | 100 | 20 |
| 4 | Rural Resort as Event Facility (Section 4.03.01.H.6) | Section 4.04.05 | Section 4.04.05 |
Cluster Subdivisions. Bed and Breakfast Homestay uses are permitted on Residential Cluster Lots, Preservation Farm Lots, and Rural Economy Cluster Lots. Bed and Breakfast Homestay uses are not permitted on Common Open Space Lots.
Cluster Subdivisions. On Rural Economy Cluster Lots, Bed and Breakfast Inn uses require Minor Special Exception review and approval. Bed and Breakfast Inns are not permitted on Residential Cluster Lots, Preservation Farm Lots, or Common Open Space Lots.
Cluster Subdivisions. Country Inns are not permitted within Cluster Subdivisions.
| Table 4.03.01-2. Intensity/Character | |||
|---|---|---|---|
| Minimum Lot Size | Number of Guest Rooms1 | Minimum Required Yard (From All Lot Lines) | |
| 1 | 40 acres | Up to 20 rooms | 125 ft |
| 2 | 60 acres | 21-40 rooms | 200 ft |
| 3 | 80 acres | 41-60 rooms | 250 ft |
| 4 | 100 acres | 61-80 rooms | 300 ft |
| 5 | 120 acres | 81-100 rooms | 350 ft |
| 6 | 150 acres | 101-120 rooms | 375 ft |
TABLE KEY: ft = feet TABLE NOTE: 1More than 120 rooms requires Special Exception approval pursuant to Section 10.11. | |||
| Table 4.03.01-2. Intensity/Character | |||
|---|---|---|---|
| Minimum Lot Size | Number of Guest Rooms1 | Minimum Required Yard (From All Lot Lines) | |
| 1 | 40 acres | Up to 20 rooms | 125 ft |
| 2 | 60 acres | 21-40 rooms | 200 ft |
| 3 | 80 acres | 41-60 rooms | 250 ft |
| 4 | 100 acres | 61-80 rooms | 300 ft |
| 5 | 120 acres | 81-100 rooms | 350 ft |
| 6 | 150 acres | 101-120 rooms | 375 ft |
TABLE KEY: ft = feet TABLE NOTE: 1More than 120 rooms requires Special Exception approval pursuant to Section 10.11. | |||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025




AR Cluster Subdivision. Day and boarding camps are not permitted within AR Cluster Subdivisions.
| Table 4.03.02-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Campers | Minimum Lot Area | |
| 1 | Level I—small scale | Up to 30 guests or boarders daily. | 15 acres |
| 2 | Level II—medium scale | Up to 100 guests or boarders daily. | 40 acres |
| 3 | Level III—large scale | Up to 250 guests or boarders daily. | 100 acres |
| 4 | Level IV | > 250 guests or boarders daily. | Special Exception pursuant to Section 10.11 |
| Table 4.03.02-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Campers | Minimum Lot Area | |
| 1 | Level I—small scale | Up to 30 guests or boarders daily. | 15 acres |
| 2 | Level II—medium scale | Up to 100 guests or boarders daily. | 40 acres |
| 3 | Level III—large scale | Up to 250 guests or boarders daily. | 100 acres |
| 4 | Level IV | > 250 guests or boarders daily. | Special Exception pursuant to Section 10.11 |
| Table 4.03.02-2. Site/Dimensional Standards | ||
|---|---|---|
| Use | Setback from Lot Lines | |
| 1 | Level I—small scale | 150 feet |
| 2 | Level II—medium scale | 200 feet |
| 3 | Level III—large scale | 250 feet |
| 4 | Level IV | 300 feet |
| Table 4.03.02-2. Site/Dimensional Standards | ||
|---|---|---|
| Use | Setback from Lot Lines | |
| 1 | Level I—small scale | 150 feet |
| 2 | Level II—medium scale | 200 feet |
| 3 | Level III—large scale | 250 feet |
| 4 | Level IV | 300 feet |
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Campgrounds are not permitted within AR Cluster Subdivisions.
| Table 4.03.03-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Campsites | Minimum Lot Area | |
| 1 | Level I—small scale | Up to 50 campsites | 40 acres |
| 2 | Level II—medium scale | >50 up to 100 campsites | 80 acres |
| 3 | Level III—large scale | >100 up to 150 campsites | 160 acres |
| 4 | Level IV | > 150 campsites | Special Exception pursuant to Section 10.11 |
| Table 4.03.03-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Campsites | Minimum Lot Area | |
| 1 | Level I—small scale | Up to 50 campsites | 40 acres |
| 2 | Level II—medium scale | >50 up to 100 campsites | 80 acres |
| 3 | Level III—large scale | >100 up to 150 campsites | 160 acres |
| 4 | Level IV | > 150 campsites | Special Exception pursuant to Section 10.11 |
| Table 4.03.03-2. Structure Size | |||
|---|---|---|---|
| Use | Scope of Use/Campsites | Maximum Total Size of All Structures | |
| 1 | Level I—small scale | Up to 50 campsites | 8,000 sf |
| 2 | Level II—medium scale | >50 up to 100 campsites | 16,000 sf |
| 3 | Level III—large scale | >100 up to 150 campsites | 32,000 sf |
| 4 | Level IV | >150 campsites | Special Exception pursuant to Section 10.11 |
TABLE KEY: sf = square feet and > = greater than | |||
| Table 4.03.03-2. Structure Size | |||
|---|---|---|---|
| Use | Scope of Use/Campsites | Maximum Total Size of All Structures | |
| 1 | Level I—small scale | Up to 50 campsites | 8,000 sf |
| 2 | Level II—medium scale | >50 up to 100 campsites | 16,000 sf |
| 3 | Level III—large scale | >100 up to 150 campsites | 32,000 sf |
| 4 | Level IV | >150 campsites | Special Exception pursuant to Section 10.11 |
TABLE KEY: sf = square feet and > = greater than | |||
| Table 4.03.03-3. Site/Dimensional Standards | ||||
|---|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | Setback from Lot Lines | |
| 1 | Level I—small scale | 40 acres | 8,000 sf | 150 ft |
| 2 | Level II—medium scale | 80 acres | 16,000 sf | 200 ft |
| 3 | Level III—large scale | 160 acres | 32,000 sf | 250 ft |
TABLE KEY: ft = feet and sf = square feet | ||||
| Table 4.03.03-3. Site/Dimensional Standards | ||||
|---|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | Setback from Lot Lines | |
| 1 | Level I—small scale | 40 acres | 8,000 sf | 150 ft |
| 2 | Level II—medium scale | 80 acres | 16,000 sf | 200 ft |
| 3 | Level III—large scale | 160 acres | 32,000 sf | 250 ft |
TABLE KEY: ft = feet and sf = square feet | ||||
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025





Locational Criteria. Hotel/Motel uses must be separated from zoning districts allowing residential uses by a minimum Buffer Type B and a minimum width of 100 feet. Exception. This requirement does not apply to the TRC, TC, PD-AAAR, and PD-MUB Zoning Districts.
Effective on: 1/1/1901
Effective on: 1/1/1901
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025



AR Cluster Subdivisions. Art Studio and Antiques, Art, and Crafts uses are not permitted within AR Cluster Subdivisions.
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025




Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
AR Cluster Subdivisions. Banquet/Event Facility uses are prohibited within AR Cluster Subdivisions.
Intensity/Character.
| Table 4.04.05-1. Intensity/Character Attendees | ||
|---|---|---|
| Minimum Acreage | Maximum Number of Attendees | |
| 1 | 20 acres | 200 attendees |
| 2 | 50 acres | 260 attendees |
| 3 | 75 acres | 310 attendees |
| 4 | 100 acres | 360 attendees |
| Table 4.04.05-1. Intensity/Character Attendees | ||
|---|---|---|
| Minimum Acreage | Maximum Number of Attendees | |
| 1 | 20 acres | 200 attendees |
| 2 | 50 acres | 260 attendees |
| 3 | 75 acres | 310 attendees |
| 4 | 100 acres | 360 attendees |
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Commercial nurseries are permitted by Special Exception review and approval on Preservation Farm Lots and Rural Economy Cluster Lots. Commercial nurseries are not permitted on Residential Cluster Lots or Common Open Space Lots.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025










Exception. The buffer requirement in Section 4.04.10.B.12.a does not apply when the drive-through facility is provided in a vertically mixed-use building containing residential uses in the TRC, TC, and PD-MUB Zoning Districts.
Effective on: 1/1/1901
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
Effective on: 1/1/1901
Effective on: 1/1/1901
No structure may be located within 500 feet of an existing residential dwelling.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Farmers Markets are not permitted on Residential Cluster Lots.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Feed and farm supply centers are not permitted within AR Cluster Subdivisions.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025


Effective on: 1/1/1901
Limited rural restaurants, subject to Section 4.04.18.B.2. are not permitted within AR Cluster Subdivisions.
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Small Business, Agricultural, and Rural uses are permitted on Rural Economy Cluster Lots. Such uses are not permitted on Residential Cluster Lots, Preservation Farm Lots, or Common Open Space Lots.
| Table 4.04.19-1. Small Business Uses | ||||
|---|---|---|---|---|
| Acreage | No. of Employees1 | Heavy Equipment (On-Site) | Business Vehicles2 (On-Site) | |
| 1 | Less than 10 acres | 3 maximum | none | 2 maximum |
| 2 | 10 but less than 50 acres | 4 maximum | 2 maximum | 4 maximum |
| 3 | 50 acres or greater | 10 maximum | 5 maximum | 6 maximum |
TABLE NOTES: 1An employee is a person, other than members of the household permanently residing on the premises, who is engaged on-site in the operation of the small business on a regular or part-time basis. 2 A business vehicle may not exceed a rated capacity of one and one half (1.5) tons or have more than two axles. | ||||
| Table 4.04.19-1. Small Business Uses | ||||
|---|---|---|---|---|
| Acreage | No. of Employees1 | Heavy Equipment (On-Site) | Business Vehicles2 (On-Site) | |
| 1 | Less than 10 acres | 3 maximum | none | 2 maximum |
| 2 | 10 but less than 50 acres | 4 maximum | 2 maximum | 4 maximum |
| 3 | 50 acres or greater | 10 maximum | 5 maximum | 6 maximum |
TABLE NOTES: 1An employee is a person, other than members of the household permanently residing on the premises, who is engaged on-site in the operation of the small business on a regular or part-time basis. 2 A business vehicle may not exceed a rated capacity of one and one half (1.5) tons or have more than two axles. | ||||
| Table 4.04.19-2. Structures1 | ||
|---|---|---|
| Acreage | Cumulative Size of Structures | |
| 1 | Up to 5 acres | 2,000 sf max |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf max |
| 3 | 10 acres or greater | 5,000 sf max for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf max |
TABLE KEY: sf = square feet and max = maximum TABLE NOTE: 1Building Height: 35 feet maximum. | ||
| Table 4.04.19-2. Structures1 | ||
|---|---|---|
| Acreage | Cumulative Size of Structures | |
| 1 | Up to 5 acres | 2,000 sf max |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf max |
| 3 | 10 acres or greater | 5,000 sf max for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf max |
TABLE KEY: sf = square feet and max = maximum TABLE NOTE: 1Building Height: 35 feet maximum. | ||
| Table 4.04.19-3. Storage Areas1,2, and 3 | ||
|---|---|---|
| Acreage | Cumulative Size of Storage Yards | |
| 1 | Up to 5 acres | 2,000 sf max |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf max |
| 3 | 10 acres or greater | 5,000 sf max for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf max |
TABLE KEY: sf = square feet and max = maximum TABLE NOTES: 1All heavy equipment must be located within a storage area. 2Storage areas must be screened consistent with the requirements of Section 7.04.05. 3Outdoor storage space must be enclosed on all sides by a fence. | ||
| Table 4.04.19-3. Storage Areas1,2, and 3 | ||
|---|---|---|
| Acreage | Cumulative Size of Storage Yards | |
| 1 | Up to 5 acres | 2,000 sf max |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf max |
| 3 | 10 acres or greater | 5,000 sf max for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf max |
TABLE KEY: sf = square feet and max = maximum TABLE NOTES: 1All heavy equipment must be located within a storage area. 2Storage areas must be screened consistent with the requirements of Section 7.04.05. 3Outdoor storage space must be enclosed on all sides by a fence. | ||
Setbacks.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Applicability. Section 4.04.20 applies to Heavy Vehicle Repair uses in the GI Zoning District.
Motor vehicle sales are permitted as an accessory use to Heavy Vehicle Repair subject to this Section 4.04.20.C. This section does not prevent a mechanic from selling a car to recover costs associated with a mechanic's lien.
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
Applicability. Section 4.04.24 applies to animal care businesses.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Applicability. Section 4.04.25 applies to veterinary services.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Applicability. Section 4.04.26 applies to adult day care uses.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
| Table 4.05.02-1. Minimum Setback from Lot Lines | ||
|---|---|---|
| Structure Size (Gross Floor Area) | Minimum Setback from All Lot Lines | |
| 1 | Greater than 18,000 sf | 225 ft |
| 2 | Greater than 9,000 sf and up to 18,000 sf | 175 ft |
| 3 | Up to or less than 9,000 sf | 125 ft |
TABLE KEY: ft = feet; sf = square feet | ||
| Table 4.05.02-1. Minimum Setback from Lot Lines | ||
|---|---|---|
| Structure Size (Gross Floor Area) | Minimum Setback from All Lot Lines | |
| 1 | Greater than 18,000 sf | 225 ft |
| 2 | Greater than 9,000 sf and up to 18,000 sf | 175 ft |
| 3 | Up to or less than 9,000 sf | 125 ft |
TABLE KEY: ft = feet; sf = square feet | ||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Size of Use Standards.
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Applicability. Section 4.05.05 applies to Cultural Facilities within the SN, A-10, A-3, CR, AR, TR, JLMA, and R Zoning Districts.
Museum and interactive science and technology center uses are not permitted within AR Cluster Subdivisions.
Hours of Operation. The hours of operation are limited to 6:00 a.m. to 9:00 p.m., except permitted temporary special events.
Accessory Uses. Accessory uses are only permitted on lots 20 acres in size or larger. Accessory uses may include retail sales (e.g., gift shops), small restaurants or cafes, or visitor centers and are subject to the following standards:
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Conference and training facilities are not permitted within AR Cluster Subdivisions.
Table 4.05.06-1. Intensity/Character | |||
|---|---|---|---|
| Use | Lot Area (Minimum) | Average Daily Users1,2 | |
| 1 | Level I-small scale | 50 acres | Up to 50 users |
| 2 | Level II-medium scale | 100 acres | >50 and up to 100 users |
| 3 | Level III-large scale | 150 acres | >100 and up to 150 users |
| 4 | Level IV | Requires Minor Special Exception approval pursuant to Section 10.11.01 | >150 users |
TABLE NOTES: 1Average daily users include the employees, trainees and conferees the conference and training facility is designed to accommodate. 2Service trips, which are trips made to the facility for the purpose of delivering food, supplies, and related materials, are in addition to the average daily users. | |||
Table 4.05.06-1. Intensity/Character | |||
|---|---|---|---|
| Use | Lot Area (Minimum) | Average Daily Users1,2 | |
| 1 | Level I-small scale | 50 acres | Up to 50 users |
| 2 | Level II-medium scale | 100 acres | >50 and up to 100 users |
| 3 | Level III-large scale | 150 acres | >100 and up to 150 users |
| 4 | Level IV | Requires Minor Special Exception approval pursuant to Section 10.11.01 | >150 users |
TABLE NOTES: 1Average daily users include the employees, trainees and conferees the conference and training facility is designed to accommodate. 2Service trips, which are trips made to the facility for the purpose of delivering food, supplies, and related materials, are in addition to the average daily users. | |||
| Table 4.05.06-2. Site/Dimensional Standards | ||
|---|---|---|
| Use | Setback from Lot Lines (Minimum) | |
| 1 | Level I—small scale | 150 ft |
| 2 | Level II—medium scale | 200 ft |
| 3 | Level III—large scale and Level IV | 250 ft |
TABLE KEY: ft = feet | ||
| Table 4.05.06-2. Site/Dimensional Standards | ||
|---|---|---|
| Use | Setback from Lot Lines (Minimum) | |
| 1 | Level I—small scale | 150 ft |
| 2 | Level II—medium scale | 200 ft |
| 3 | Level III—large scale and Level IV | 250 ft |
TABLE KEY: ft = feet | ||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
| Table 4.05.07-1. Intensity/Character | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Level I-small scale | 50 acres |
| 2 | Level II-medium scale | 75 acres |
| 3 | Level III-large scale | 150 acres |
| Table 4.05.07-1. Intensity/Character | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Level I-small scale | 50 acres |
| 2 | Level II-medium scale | 75 acres |
| 3 | Level III-large scale | 150 acres |
| Table 4.05.07-2. Structure Size | ||
|---|---|---|
| Use | Maximum Total Size of Permitted Principal Structures (Gross Floor Area) | |
| 1 | Level I—small scale | 25,000 sf |
| 2 | Level II—medium scale | 50,000 sf |
| 3 | Level III—large scale | 75,000 sf |
TABLE KEY: sf = square feet | ||
| Table 4.05.07-2. Structure Size | ||
|---|---|---|
| Use | Maximum Total Size of Permitted Principal Structures (Gross Floor Area) | |
| 1 | Level I—small scale | 25,000 sf |
| 2 | Level II—medium scale | 50,000 sf |
| 3 | Level III—large scale | 75,000 sf |
TABLE KEY: sf = square feet | ||
| Table 4.05.07-3. Distribution of Uses | ||
|---|---|---|
| Use | Total Maximum Gross Floor Area of the Principal Permitted Structures | |
| 1 | Dining and Restaurant Facilities | 30% |
| 2 | Banquet and Conference Facilities | 25% |
| 3 | Spa and Health Facilities | 15% |
| Table 4.05.07-3. Distribution of Uses | ||
|---|---|---|
| Use | Total Maximum Gross Floor Area of the Principal Permitted Structures | |
| 1 | Dining and Restaurant Facilities | 30% |
| 2 | Banquet and Conference Facilities | 25% |
| 3 | Spa and Health Facilities | 15% |
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
Effective on: 1/1/1901
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
| Table 4.05.09-1 Fairground Minimum Setback from Lot Lines | ||
|---|---|---|
| Structure Size (Gross Floor Area) | Minimum Setback from Lot Lines | |
| 1 | Less than 20,000 sf | 150 ft |
| 2 | 20,000 sf to 40,000 sf | 200 ft |
| 3 | Greater than 40,000 sf | 225 ft |
| TABLE KEY: ft = feet and sf = square feet | ||
| Table 4.05.09-1 Fairground Minimum Setback from Lot Lines | ||
|---|---|---|
| Structure Size (Gross Floor Area) | Minimum Setback from Lot Lines | |
| 1 | Less than 20,000 sf | 150 ft |
| 2 | 20,000 sf to 40,000 sf | 200 ft |
| 3 | Greater than 40,000 sf | 225 ft |
| TABLE KEY: ft = feet and sf = square feet | ||
Effective on: 1/1/1901
| Table 4.05.10-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Event | Lot Area Requirement | |
| 1 | Level I—small scale | No more than 150 vehicles allowed on site at any 1 time | >5 acres, up to 40 |
| 2 | Level II—medium scale | No more than 300 vehicles allowed on site at any 1 time | >40 acres, up to 80 |
| 3 | Level III—large scale | No more than 400 vehicles allowed on site at any 1 time | >80 acres |
| TABLE KEY: > = greater than | |||
| Table 4.05.10-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Event | Lot Area Requirement | |
| 1 | Level I—small scale | No more than 150 vehicles allowed on site at any 1 time | >5 acres, up to 40 |
| 2 | Level II—medium scale | No more than 300 vehicles allowed on site at any 1 time | >40 acres, up to 80 |
| 3 | Level III—large scale | No more than 400 vehicles allowed on site at any 1 time | >80 acres |
| TABLE KEY: > = greater than | |||
| Table 4.05.10-2. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | |
| 1 | Level I—small scale | 5 acres, up to 40 acres | Up to 5,000 sf |
| 2 | Level II—medium scale | >40 acres, up to 80 acres | > 5,000 sf, up to 7,500 sf |
| 3 | Level III—large scale | >80 acres | > 7,500 sf, up to 10,500 sf |
TABLE KEY: ft = feet, sf = square feet, and > = greater than | |||
| Table 4.05.10-2. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | |
| 1 | Level I—small scale | 5 acres, up to 40 acres | Up to 5,000 sf |
| 2 | Level II—medium scale | >40 acres, up to 80 acres | > 5,000 sf, up to 7,500 sf |
| 3 | Level III—large scale | >80 acres | > 7,500 sf, up to 10,500 sf |
TABLE KEY: ft = feet, sf = square feet, and > = greater than | |||
| Table 4.05.10-3. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | Up to 5,000 sf | 100 ft |
| 2 | Level II—medium scale | >5,000 sf up to 7,500 sf | 150 ft |
| 3 | Level III—large scale | >7,500 sf, up to 10,000 sf | 200 ft |
TABLE KEY: ft = feet, sf = square feet, and > = greater than | |||
| Table 4.05.10-3. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | Up to 5,000 sf | 100 ft |
| 2 | Level II—medium scale | >5,000 sf up to 7,500 sf | 150 ft |
| 3 | Level III—large scale | >7,500 sf, up to 10,000 sf | 200 ft |
TABLE KEY: ft = feet, sf = square feet, and > = greater than | |||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
AR Cluster Subdivisions. Fire and/or rescue station uses are not permitted within AR Cluster Subdivisions.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Rural Retreat uses are permitted by Minor Special Exception review and approval on Rural Economy Cluster Lots. Such uses are not permitted on Residential Cluster Lots, Preservation Farm Lots, or Common Open Space Lots.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Private schools are not permitted within AR Cluster Subdivisions; and
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Approval.
Effective on: 1/1/1901
Approval.
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
TRC, UE, TC, CC-NC, CC-CC, CC-SC, PD-CC(RC), PD-MUB, RC, GB, PD-RV, and TCC Zoning Districts.
Effective on: 1/1/1901
Façade Standards.
Principal Façade.
Applicability. Principal Façade requirements apply to all building façades that face adjacent existing or planned public roads or that face an adjacent property with existing residential development, an approved CDP, or plat, or plan showing residential development, or Zoning District permitting residential uses; and all building facades adjacent to or facing property with the following existing uses or an approved CDP, or plat, or plan showing the following uses:
Uses listed in Chapter 3 under the Residential and Lodging use classifications;
Uses listed in Chapter 3 under the Day Care, Financial Services, Food and Beverage Sales/Service, Government, Education, Arts, Entertainment, and Recreation, and Retail use categories; and
| Figure 4.06.02-1. Data Center Standards |
|---|
![]() |
| Figure 4.06.02-1. Data Center Standards |
|---|
![]() |
Effective on: 1/1/1901
| Table 4.06.03-1. Extractive Industries Dimensional Standards | ||
|---|---|---|
| Standard | Requirement | |
| Lot Requirements | ||
| 1 | Lot Size (min) | 3 acres, exclusive of major floodplain |
| 2 | Lot Width (min) | 200 ft fronting on public or private roads |
| 3 | Lot Depth (min) | 500 ft |
| Yards | ||
| 4 | Setback Adjacent to Roads (min)1, 2 | 50 ft |
| 5 | Setback from Any Property Line (min)2 | 50 ft |
TABLE KEY: ft = feet and min = minimum TABLE NOTES: 1Except when a greater setback is required by Section 7.04.02. 2Except when a greater setback is required by Section 7.01.07. | ||
| Table 4.06.03-1. Extractive Industries Dimensional Standards | ||
|---|---|---|
| Standard | Requirement | |
| Lot Requirements | ||
| 1 | Lot Size (min) | 3 acres, exclusive of major floodplain |
| 2 | Lot Width (min) | 200 ft fronting on public or private roads |
| 3 | Lot Depth (min) | 500 ft |
| Yards | ||
| 4 | Setback Adjacent to Roads (min)1, 2 | 50 ft |
| 5 | Setback from Any Property Line (min)2 | 50 ft |
TABLE KEY: ft = feet and min = minimum TABLE NOTES: 1Except when a greater setback is required by Section 7.04.02. 2Except when a greater setback is required by Section 7.01.07. | ||
| Figure 4.06.03-1 Particle Velocities at Frequency Levels |
|---|
![]() |
| Figure 4.06.03-1 Particle Velocities at Frequency Levels |
|---|
![]() |
Effective on: 1/1/1901
Pursuant to Section 10.04, a Zoning Permit, required prior to the commencement of any use or change of use, must identify the specific use as listed in the Use Tables of Section 3.02 and demonstrate conformance to any applicable use-specific standards of Chapter 4; and
Effective on: 1/1/1901
Effective on: 1/1/1901
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
| Table 4.06.09-1. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Size | Maximum Size of Structures | |
| 1 | Level I—small scale | 12 acres | 3,500 square feet |
| 2 | Level II—medium scale | 20 acres | 5,500 square feet |
| 3 | Level III—large scale | 25 acres | 7,000 square feet |
| Table 4.06.09-1. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Size | Maximum Size of Structures | |
| 1 | Level I—small scale | 12 acres | 3,500 square feet |
| 2 | Level II—medium scale | 20 acres | 5,500 square feet |
| 3 | Level III—large scale | 25 acres | 7,000 square feet |
| Table 4.06.09-2. Storage Yards | |||
|---|---|---|---|
| Use | Minimum Lot Size | Maximum Size of Storage Yard | |
| 1 | Level I—small scale | 12 acres | 1 acre |
| 2 | Level II—medium scale | 20 acres | 2 acres |
| 3 | Level III—large scale | 25 acres | 3 acres |
| Table 4.06.09-2. Storage Yards | |||
|---|---|---|---|
| Use | Minimum Lot Size | Maximum Size of Storage Yard | |
| 1 | Level I—small scale | 12 acres | 1 acre |
| 2 | Level II—medium scale | 20 acres | 2 acres |
| 3 | Level III—large scale | 25 acres | 3 acres |
| Table 4.06.09-3. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | Up to 3,500 sf | 225 ft |
| 2 | Level II—medium scale | >3,500 sf, up to 5,500 sf | 275 ft |
| 3 | Level III—large scale | >5,500 sf, up to 7,000 sf | 325 ft |
| TABLE KEY: sf = square feet, ft = feet, > = greater than | |||
| Table 4.06.09-3. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | Up to 3,500 sf | 225 ft |
| 2 | Level II—medium scale | >3,500 sf, up to 5,500 sf | 275 ft |
| 3 | Level III—large scale | >5,500 sf, up to 7,000 sf | 325 ft |
| TABLE KEY: sf = square feet, ft = feet, > = greater than | |||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
Effective on: 1/1/1901
AR Cluster Subdivisions. Airport/Landing Strip uses are not permitted within AR Cluster Subdivisions.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Height.
Specific Buffer and Berm Requirements. In lieu of the buffer required under Table 7.04.03-1, a Buffer Type C is required with the specified plantings, and located on an earthen berm that has a minimum height of 6 feet and a grade lower than 2:1. Use of natural topography and preservation of existing vegetation, supplemented by new vegetation, if needed, may be substituted if determined by the County Urban Forester to provide an equivalent density, depth, and height to the required Buffer Type C and earthen berm.
Effective on: 1/1/1901
| Table 4.07.03-1. Parking Facility Type | ||||||
|---|---|---|---|---|---|---|
Zoning District |
Accessory Parking Area Surface
| Accessory Parking Area | Principal Off-Street Parking Facility Surface | Principal Off-Street Parking Facility Structured | Commuter Parking Lot less than or equal to 50 Spaces | Commuter Parking Lot greater than 50 Spaces |
| Urban | ||||||
TRC Inner Core | P/S1 | P |
| P | S | S |
TRC Outer Core | P/S1 | P | S | P | S | S |
TRC TDSA | P | P | S | P | S | S |
UE | P/S1 | P | S | P | S | S |
| Suburban | ||||||
CC-NC, CC-CC, CC-SC | P | P | S | P | P | P |
SN | P |
| S |
| P | S |
SCN | P | P | S | P | P | S |
TC Core | P/S1 | P | S | P | S | S |
TC Fringe | P | P | S | P | P | p |
| Legacy Suburban | ||||||
CLI | P | |||||
GB | P |
| S |
| P | P |
PD-AAAR | P | P |
|
|
|
|
PD-CC(RC) | P | P | S | S | P |
|
PD-MUB | P/S1 | P | M | P | P | P |
PD-RDP | P | P | S | P | P | P |
PD-SA | P | P | S | P | P | P |
R | P | P |
|
| P | S |
| Transition | ||||||
TR | P |
|
|
|
|
|
TR-2 | P |
|
|
|
|
|
TCC | P |
| S |
| P | S |
TCN | P |
| S |
| P | S |
TSN | P |
| S |
| P | S |
| Legacy Transition | ||||||
| TR-2 | P | |||||
| Rural | ||||||
AR | P |
|
|
| P | S |
| Legacy Rural | ||||||
A-3, A-10 | P |
|
|
| P | S |
CR | P |
|
|
| P | S |
PD-RV Conservancy |
|
|
|
| P |
|
RC | P |
|
|
| P | P |
| JLMA | ||||||
JLMA | P |
|
|
| P | S |
| Legacy JLMA | ||||||
| JLMA-20 | P | |||||
| Office and Industrial | ||||||
GI | P |
| P | P |
|
|
IP | P |
| S | S | P | P |
MR-HI | P |
|
|
| S | S |
OP | P | P | S | P | P | P |
TABLE NOTE: 1 Permitted accessory parking limited to on-street parking. | ||||||
| Table 4.07.03-1. Parking Facility Type | ||||||
|---|---|---|---|---|---|---|
Zoning District |
Accessory Parking Area Surface
| Accessory Parking Area | Principal Off-Street Parking Facility Surface | Principal Off-Street Parking Facility Structured | Commuter Parking Lot less than or equal to 50 Spaces | Commuter Parking Lot greater than 50 Spaces |
| Urban | ||||||
TRC Inner Core | P/S1 | P |
| P | S | S |
TRC Outer Core | P/S1 | P | S | P | S | S |
TRC TDSA | P | P | S | P | S | S |
UE | P/S1 | P | S | P | S | S |
| Suburban | ||||||
CC-NC, CC-CC, CC-SC | P | P | S | P | P | P |
SN | P |
| S |
| P | S |
SCN | P | P | S | P | P | S |
TC Core | P/S1 | P | S | P | S | S |
TC Fringe | P | P | S | P | P | p |
| Legacy Suburban | ||||||
CLI | P | |||||
GB | P |
| S |
| P | P |
PD-AAAR | P | P |
|
|
|
|
PD-CC(RC) | P | P | S | S | P |
|
PD-MUB | P/S1 | P | M | P | P | P |
PD-RDP | P | P | S | P | P | P |
PD-SA | P | P | S | P | P | P |
R | P | P |
|
| P | S |
| Transition | ||||||
TR | P |
|
|
|
|
|
TR-2 | P |
|
|
|
|
|
TCC | P |
| S |
| P | S |
TCN | P |
| S |
| P | S |
TSN | P |
| S |
| P | S |
| Legacy Transition | ||||||
| TR-2 | P | |||||
| Rural | ||||||
AR | P |
|
|
| P | S |
| Legacy Rural | ||||||
A-3, A-10 | P |
|
|
| P | S |
CR | P |
|
|
| P | S |
PD-RV Conservancy |
|
|
|
| P |
|
RC | P |
|
|
| P | P |
| JLMA | ||||||
JLMA | P |
|
|
| P | S |
| Legacy JLMA | ||||||
| JLMA-20 | P | |||||
| Office and Industrial | ||||||
GI | P |
| P | P |
|
|
IP | P |
| S | S | P | P |
MR-HI | P |
|
|
| S | S |
OP | P | P | S | P | P | P |
TABLE NOTE: 1 Permitted accessory parking limited to on-street parking. | ||||||
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025


Unsafe or Abandoned Facility/Decommissioning.
Placement.
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
There is some valid economic, technological, or physical justification as to why co-location is not possible, and the applicant has identified the conditions under which future co-location by other service providers is permitted; and
There is some valid economic, technological, or physical justification as to why co-location is not possible and the applicant has identified the conditions under which future co-location by other service providers is permitted; and
Such co-location would exceed the structural capacity of existing and approved telecommunications facilities, including the planned use of such facilities, and such facilities cannot be reinforced to accommodate the co-location at a reasonable cost;
Such co-location will cause interference with other existing or planned equipment for that telecommunications facility, and that interference cannot be prevented at a reasonable cost;
Existing or approved telecommunications facilities do not have space to accommodate the co-location so as to provide adequate service; and
Existing and approved telecommunications facilities will not provide adequate signal coverage; and
(ZOAM-2020-0002, 06/12/2024)
Effective on: 6/9/2024
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
| Table 4.08.03-1. Intensity/Character Site Size Exceptions | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Equestrian Event Facility | 25 acres |
| 2 | Restaurant, Rural | 20 acres |
| 3 | Stable, Livery | 15 acres |
| Table 4.08.03-1. Intensity/Character Site Size Exceptions | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Equestrian Event Facility | 25 acres |
| 2 | Restaurant, Rural | 20 acres |
| 3 | Stable, Livery | 15 acres |
| Table 4.08.03-2. Intensity/Character by Scale | |||
|---|---|---|---|
| Use | Scope of Use/Event | Minimum Lot Area | |
| 1 | Level I—small scale | No more than 100 vehicles on site at any 1 time | 5 to 25 acres Section 4.08.03.B.2 |
| 2 | Level II—medium scale | No more than 200 vehicles on site at any 1 time | >25 acres, up to 50 acres |
| 3 | Level III—large scale | No more than 300 vehicles on site at any 1 time. Exception: 2 additional vehicles allowed per acre in excess of 100 acres | >50 acres, up to 100 acres |
| Table 4.08.03-2. Intensity/Character by Scale | |||
|---|---|---|---|
| Use | Scope of Use/Event | Minimum Lot Area | |
| 1 | Level I—small scale | No more than 100 vehicles on site at any 1 time | 5 to 25 acres Section 4.08.03.B.2 |
| 2 | Level II—medium scale | No more than 200 vehicles on site at any 1 time | >25 acres, up to 50 acres |
| 3 | Level III—large scale | No more than 300 vehicles on site at any 1 time. Exception: 2 additional vehicles allowed per acre in excess of 100 acres | >50 acres, up to 100 acres |
| Table 4.08.03-3. Structure | |||
|---|---|---|---|
| Use | Lot Area | Maximum Size of Structures | |
| 1 | Level I—small scale | 5 to 25 acres | 30,000 sf |
| 2 | Level II—medium scale | >25 acres, up to 50 acres | 30,000 sf |
| 3 | Level III—large scale | > 50 acres, up to 100 acres Exception: Additional 2,400 sf of structure size allowed per every 10 acres in excess of 100 acres, up to 48,000 sf in total structure size | 36,000 sf |
TABLE KEY: sf = square feet and > = greater than | |||
| Table 4.08.03-3. Structure | |||
|---|---|---|---|
| Use | Lot Area | Maximum Size of Structures | |
| 1 | Level I—small scale | 5 to 25 acres | 30,000 sf |
| 2 | Level II—medium scale | >25 acres, up to 50 acres | 30,000 sf |
| 3 | Level III—large scale | > 50 acres, up to 100 acres Exception: Additional 2,400 sf of structure size allowed per every 10 acres in excess of 100 acres, up to 48,000 sf in total structure size | 36,000 sf |
TABLE KEY: sf = square feet and > = greater than | |||
| Table 4.08.03-4. Storage Areas | |||
|---|---|---|---|
| Use | Lot Area | Maximum Size of Storage Areas | |
| 1 | Level I—small scale | 5 to 25 acres | 5,000 sf |
TABLE KEY: sf = square feet TABLE NOTE: An additional 1,000 sf of storage area is allowed per every 10 acres in excess of 25 acres, up to 20,000 sf in total storage area size. | |||
| Table 4.08.03-4. Storage Areas | |||
|---|---|---|---|
| Use | Lot Area | Maximum Size of Storage Areas | |
| 1 | Level I—small scale | 5 to 25 acres | 5,000 sf |
TABLE KEY: sf = square feet TABLE NOTE: An additional 1,000 sf of storage area is allowed per every 10 acres in excess of 25 acres, up to 20,000 sf in total storage area size. | |||
| Table 4.08.03-5. Site/Dimensional Standards | ||||
|---|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | 5 to 25 acres | 12,000 sf | 60 ft |
| 2 | Level II—medium scale | >25 acres, up to 50 acres | 24,000 sf | 120 ft |
| 3 | Level III—large scale | > 50 acres, up to 100 acres | 36,000 sf | 175 ft |
TABLE KEY: sf = square feet, ft = feet, and > = greater than | ||||
| Table 4.08.03-5. Site/Dimensional Standards | ||||
|---|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | 5 to 25 acres | 12,000 sf | 60 ft |
| 2 | Level II—medium scale | >25 acres, up to 50 acres | 24,000 sf | 120 ft |
| 3 | Level III—large scale | > 50 acres, up to 100 acres | 36,000 sf | 175 ft |
TABLE KEY: sf = square feet, ft = feet, and > = greater than | ||||
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/09/2024)
Effective on: 3/12/2025
| Table 4.08.04-1. Intensity/Character Site Size Exceptions | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Agricultural education or research | 25 acres |
| 2 | Equestrian event facility | 25 acres |
| 3 | Farm distribution hub | 25 acres |
| Table 4.08.04-1. Intensity/Character Site Size Exceptions | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Agricultural education or research | 25 acres |
| 2 | Equestrian event facility | 25 acres |
| 3 | Farm distribution hub | 25 acres |
| Table 4.08.04-2. Intensity/Character by Scale | |||
|---|---|---|---|
| Use | Scope of Use/Event | Minimum Lot Area | |
| 1 | Level I - small scale | No more than 100 vehicles on site at any 1 time | 5 to 25 acres Section 4.08.04.B.1 above |
| 2 | Level II - medium scale | No more than 200 vehicles on site at any 1 time | >25 acres, up to 50 acres |
| 3 | Level III - large scale | No more than 300 vehicles on site at any 1 time Exception: 2 additional vehicles are allowed per acre in excess of 100 acres | >50 acres, up to 100 acres |
| Table 4.08.04-2. Intensity/Character by Scale | |||
|---|---|---|---|
| Use | Scope of Use/Event | Minimum Lot Area | |
| 1 | Level I - small scale | No more than 100 vehicles on site at any 1 time | 5 to 25 acres Section 4.08.04.B.1 above |
| 2 | Level II - medium scale | No more than 200 vehicles on site at any 1 time | >25 acres, up to 50 acres |
| 3 | Level III - large scale | No more than 300 vehicles on site at any 1 time Exception: 2 additional vehicles are allowed per acre in excess of 100 acres | >50 acres, up to 100 acres |
| Table 4.08.04-3. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | |
| 1 | Agricultural education or research facility | 25 acres | FAR: 0.02 |
| 2 | Farm distribution hub | 25 acres | FAR: 0.02 |
| All Other Uses | |||
| 3 | Level I—small scale | 5 to 25 acres | 12,000 sf |
| 4 | Level II—medium scale | > 25 acres, up to 50 acres | 24,000 sf |
| 5 | Level III—large scale | > 50 acres, up to100 acres Exception. Additional 2,400 sf of structure size allowed per every 10 acres in excess of 100 acres, up to 48,000 sf in total structure size | 36,000 sf |
TABLE KEY: FAR = Floor Area Ratio, sf = square feet, and > = greater than | |||
| Table 4.08.04-3. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | |
| 1 | Agricultural education or research facility | 25 acres | FAR: 0.02 |
| 2 | Farm distribution hub | 25 acres | FAR: 0.02 |
| All Other Uses | |||
| 3 | Level I—small scale | 5 to 25 acres | 12,000 sf |
| 4 | Level II—medium scale | > 25 acres, up to 50 acres | 24,000 sf |
| 5 | Level III—large scale | > 50 acres, up to100 acres Exception. Additional 2,400 sf of structure size allowed per every 10 acres in excess of 100 acres, up to 48,000 sf in total structure size | 36,000 sf |
TABLE KEY: FAR = Floor Area Ratio, sf = square feet, and > = greater than | |||
| Table 4.08.04-4. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Agricultural education or research facility | FAR (all structures): 0.02 | 150 ft |
| 2 | Farm distribution Hub | FAR (all structures): 0.02 | 150 ft |
| All Other Uses | |||
| 3 | Level I—small scale | 12,000 sf | 60 ft |
| 4 | Level II—medium scale | 24,000 sf | 120 ft |
| 5 | Level III—large scale | 36,000 sf | 175 ft |
TABLE KEY: FAR = Floor Area Ratio, sf = square feet, and ft = feet | |||
| Table 4.08.04-4. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Agricultural education or research facility | FAR (all structures): 0.02 | 150 ft |
| 2 | Farm distribution Hub | FAR (all structures): 0.02 | 150 ft |
| All Other Uses | |||
| 3 | Level I—small scale | 12,000 sf | 60 ft |
| 4 | Level II—medium scale | 24,000 sf | 120 ft |
| 5 | Level III—large scale | 36,000 sf | 175 ft |
TABLE KEY: FAR = Floor Area Ratio, sf = square feet, and ft = feet | |||
(ZOAM-2020-0002, 06/09/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/11/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Retail Sales. Accessory retail sales must not exceed a total area of 600 square feet.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/11/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
| Table 4.08.12-1. Standards | ||||
|---|---|---|---|---|
| Acreage | Maximum Number of Employees1 | Maximum Number of Heavy Equipment (On-Site) | Maximum Number of Business Vehicles (On-Site)2 | |
| 1 | Less than 10 acres | 3 | none | 2 |
| 2 | 10 but less than 50 acres | 4 | 2 | 4 |
| 3 | 50 acres or greater | 10 | 5 | 6 |
TABLE NOTES: 1An employee is a person, other than members of the household permanently residing on the premises, who is engaged on-site in the operation of the agricultural processing on a regular or part-time basis. 2A business vehicle may not exceed a rated capacity of 1.5 tons or have more than 2 axles. | ||||
| Table 4.08.12-1. Standards | ||||
|---|---|---|---|---|
| Acreage | Maximum Number of Employees1 | Maximum Number of Heavy Equipment (On-Site) | Maximum Number of Business Vehicles (On-Site)2 | |
| 1 | Less than 10 acres | 3 | none | 2 |
| 2 | 10 but less than 50 acres | 4 | 2 | 4 |
| 3 | 50 acres or greater | 10 | 5 | 6 |
TABLE NOTES: 1An employee is a person, other than members of the household permanently residing on the premises, who is engaged on-site in the operation of the agricultural processing on a regular or part-time basis. 2A business vehicle may not exceed a rated capacity of 1.5 tons or have more than 2 axles. | ||||
| Table 4.08.12-2. Structures1 | ||
|---|---|---|
| Acreage | Maximum Cumulative Size of Structures | |
| 1 | Up to 5 acres | 2,000 sf |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf |
| 3 | 10 acres or greater | 5,000 sf for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf |
TABLE KEY: sf = square feet TABLE NOTE: 1Maximum Building Height: 35 feet | ||
| Table 4.08.12-2. Structures1 | ||
|---|---|---|
| Acreage | Maximum Cumulative Size of Structures | |
| 1 | Up to 5 acres | 2,000 sf |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf |
| 3 | 10 acres or greater | 5,000 sf for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf |
TABLE KEY: sf = square feet TABLE NOTE: 1Maximum Building Height: 35 feet | ||
| Table 4.08.12-3. Storage Areas | ||
|---|---|---|
| Acreage | Maximum Cumulative Size of Storage Areas1 | |
| 1 | Up to 5 acres | 2,000 sf |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf |
| 3 | 10 acres or greater | 5,000 sf for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf maximum |
TABLE KEY: sf = square feet TABLE NOTE: 1All heavy equipment must be located within a Storage Area. Storage Areas must be screened consistent with the requirements of Section 7.04.05. Outdoor Storage Areas must be enclosed on all sides by a fence that screens the outdoor Storage Area. | ||
| Table 4.08.12-3. Storage Areas | ||
|---|---|---|
| Acreage | Maximum Cumulative Size of Storage Areas1 | |
| 1 | Up to 5 acres | 2,000 sf |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf |
| 3 | 10 acres or greater | 5,000 sf for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf maximum |
TABLE KEY: sf = square feet TABLE NOTE: 1All heavy equipment must be located within a Storage Area. Storage Areas must be screened consistent with the requirements of Section 7.04.05. Outdoor Storage Areas must be enclosed on all sides by a fence that screens the outdoor Storage Area. | ||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Use-Specific Standards
Purpose. The purpose of Section 4.01 is to establish standards for specific uses to minimize negative impacts on neighboring properties, implement State and federal law, and ensure the orderly development of a diversity of land uses within the County. These standards will provide uniform criteria for development approval, protect the public health, safety and welfare, and protect property values and economic development. These standards are consistent with and support the Comprehensive Plan.
Effective on: 1/1/1901
Purpose. The purpose of the Adaptive Reuse Standards is to foster the appropriate and compatible adaptive reuse of obsolete or underutilized historically significant structures to:
Applicability. Structures meeting the eligibility requirements of Section 4.09.B are permitted to be adaptively reused in accordance with the standards of this Section.
| Table 4.09-1. Additional Uses Permitted as Adaptive Reuse | ||
|---|---|---|
| Current Zoning District | Permitted as Adaptive Reuse1 | |
| 1 | Zoning districts that permit residential uses, except zoning districts that permit only SFD dwelling units (TRC, SN, SCN, TC, TCN, RC, R-8, R-16, R-24, PD-MUB, PD-AAAR) | 100% attainable housing regardless of the dwelling unit type permitted in the Zoning District (SFD, SFA), MFS, and/or MFA) provided the dwelling units are developed pursuant to Sections 9.01.B, C, E, and I of the ADU Program requirements, Sections 9.02.A, B, C, D, and I of the UHNU Program requirements, or Section 9.03 of the AHU Program requirements. |
| 2 | Zoning districts that permit SFD, SFA, and/or MFS dwelling units (TRC, SN, SCN, TC, TR, TSN, TCN, AR-1, AR-2, CR, RC, JLMA, R, PD-MUB) | SFD dwelling unit converted to up to 4 dwelling units or 4 live/work dwellings |
| 3 | Any zoning district that does not currently permit the use | Commercial Uses, except for the following uses: Kennel; Kennel, Indoor; Dry Cleaning Plant; Convenience Store (with Gasoline Sales); and all Automotive uses |
| 4 | Any zoning district that does not currently permit the use | Industrial/Production: Wood, Metal, and Stone Crafts use only. The Wood, Metal, and Stone Crafts use is not permitted to exceed 7,500 sf. The use may be located in an accessory building that meets the criteria of Section 4.09.B. |
| 5 | Any zoning district that does not currently permit the use | Lodging Uses |
| 6 | Any zoning district that does not currently permit the use | Public, Civic, Institutional Uses, except for the following uses: Hospital; Recreation, Indoor; Recreation, Outdoor or Major; and Shooting Range, Indoor |
TABLE KEY: SFD = single-family detached, SFA = single-family attached, MFS = multifamily stacked, MFA = multifamily attached, and sf = square feet TABLE NOTE: 1Uses also must comply with any applicable Use-Specific Standards in Chapter 3. | ||
| Table 4.09-1. Additional Uses Permitted as Adaptive Reuse | ||
|---|---|---|
| Current Zoning District | Permitted as Adaptive Reuse1 | |
| 1 | Zoning districts that permit residential uses, except zoning districts that permit only SFD dwelling units (TRC, SN, SCN, TC, TCN, RC, R-8, R-16, R-24, PD-MUB, PD-AAAR) | 100% attainable housing regardless of the dwelling unit type permitted in the Zoning District (SFD, SFA), MFS, and/or MFA) provided the dwelling units are developed pursuant to Sections 9.01.B, C, E, and I of the ADU Program requirements, Sections 9.02.A, B, C, D, and I of the UHNU Program requirements, or Section 9.03 of the AHU Program requirements. |
| 2 | Zoning districts that permit SFD, SFA, and/or MFS dwelling units (TRC, SN, SCN, TC, TR, TSN, TCN, AR-1, AR-2, CR, RC, JLMA, R, PD-MUB) | SFD dwelling unit converted to up to 4 dwelling units or 4 live/work dwellings |
| 3 | Any zoning district that does not currently permit the use | Commercial Uses, except for the following uses: Kennel; Kennel, Indoor; Dry Cleaning Plant; Convenience Store (with Gasoline Sales); and all Automotive uses |
| 4 | Any zoning district that does not currently permit the use | Industrial/Production: Wood, Metal, and Stone Crafts use only. The Wood, Metal, and Stone Crafts use is not permitted to exceed 7,500 sf. The use may be located in an accessory building that meets the criteria of Section 4.09.B. |
| 5 | Any zoning district that does not currently permit the use | Lodging Uses |
| 6 | Any zoning district that does not currently permit the use | Public, Civic, Institutional Uses, except for the following uses: Hospital; Recreation, Indoor; Recreation, Outdoor or Major; and Shooting Range, Indoor |
TABLE KEY: SFD = single-family detached, SFA = single-family attached, MFS = multifamily stacked, MFA = multifamily attached, and sf = square feet TABLE NOTE: 1Uses also must comply with any applicable Use-Specific Standards in Chapter 3. | ||
| Table 4.09-2. Adaptive Reuse Incentives | |||
|---|---|---|---|
| Incentive | Existing Floor Area | New Floor Area | |
| 1 | Floor Area Ratio (FAR). Regardless of whether an adaptive reuse is for residential or nonresidential purposes, an existing building that exceeds the maximum Floor Area Ratio (FAR) allowed by SPEX in the underlying Zoning District may use all existing floor area for the purposes of adaptive reuse without SPEX approval provided that no exterior changes to the existing building are made. Additions to existing buildings that add new floor area may exceed the permitted FAR in an underlying zoning district up to the maximum FAR permitted by Special Exception without Special Exception approval. | + | + |
| 2 | Loading Space. New loading spaces pursuant to Section 7.06.09 are not required for adaptive reuse. | + | |
| 3 | Off-Street Parking. The required number of parking spaces must be the lesser of the number of spaces that existed on the site as of the adoption date of this Zoning Ordinance, or the minimum number of spaces required by Section 7.06.02 Once the adaptive reuse is established, the number of spaces must be maintained and not reduced. | + | |
| 4 | Open Space. Existing nonresidential lots that do not conform to open space requirements of the applicable Zoning District pursuant to Section 7.02 are permitted to be adaptively reused without meeting the open space requirement. | + | + |
| 5 | Rear Yards. Additions to existing principal buildings may encroach into rear yards pursuant to Section 10.03. The encroachment must be within 50% of the average rear yard of principal buildings on the same side of the road within 150 feet of both sides of the lot or lots eligible for adaptive reuse. | + | |
| 6 | Residential Density. All SFD, SFA, MF stacked dwelling units, including live/work dwelling units, resulting from a converted SFD as permitted in Table 4.09-1 only count as the original SFD dwelling unit when calculating the maximum dwelling unit per acre density requirements of the Zoning District or proffered rezoning. | + | |
| 7 | Side Yards. Additions to existing principal buildings may encroach into side yards pursuant to Section 10.03. The encroachment must be within 50% of the average side yard of principal buildings on the same side of the road within 150 feet of both sides of the lot or lots eligible for adaptive reuse. | ||
| 8 | Site Plan Review. No land development application fee is required for the first 2 submissions of a Site Plan for an adaptive reuse that is less than 3,000 square feet of gross floor area and located in an HOD or a VCOD. | + | |
| Table 4.09-2. Adaptive Reuse Incentives | |||
|---|---|---|---|
| Incentive | Existing Floor Area | New Floor Area | |
| 1 | Floor Area Ratio (FAR). Regardless of whether an adaptive reuse is for residential or nonresidential purposes, an existing building that exceeds the maximum Floor Area Ratio (FAR) allowed by SPEX in the underlying Zoning District may use all existing floor area for the purposes of adaptive reuse without SPEX approval provided that no exterior changes to the existing building are made. Additions to existing buildings that add new floor area may exceed the permitted FAR in an underlying zoning district up to the maximum FAR permitted by Special Exception without Special Exception approval. | + | + |
| 2 | Loading Space. New loading spaces pursuant to Section 7.06.09 are not required for adaptive reuse. | + | |
| 3 | Off-Street Parking. The required number of parking spaces must be the lesser of the number of spaces that existed on the site as of the adoption date of this Zoning Ordinance, or the minimum number of spaces required by Section 7.06.02 Once the adaptive reuse is established, the number of spaces must be maintained and not reduced. | + | |
| 4 | Open Space. Existing nonresidential lots that do not conform to open space requirements of the applicable Zoning District pursuant to Section 7.02 are permitted to be adaptively reused without meeting the open space requirement. | + | + |
| 5 | Rear Yards. Additions to existing principal buildings may encroach into rear yards pursuant to Section 10.03. The encroachment must be within 50% of the average rear yard of principal buildings on the same side of the road within 150 feet of both sides of the lot or lots eligible for adaptive reuse. | + | |
| 6 | Residential Density. All SFD, SFA, MF stacked dwelling units, including live/work dwelling units, resulting from a converted SFD as permitted in Table 4.09-1 only count as the original SFD dwelling unit when calculating the maximum dwelling unit per acre density requirements of the Zoning District or proffered rezoning. | + | |
| 7 | Side Yards. Additions to existing principal buildings may encroach into side yards pursuant to Section 10.03. The encroachment must be within 50% of the average side yard of principal buildings on the same side of the road within 150 feet of both sides of the lot or lots eligible for adaptive reuse. | ||
| 8 | Site Plan Review. No land development application fee is required for the first 2 submissions of a Site Plan for an adaptive reuse that is less than 3,000 square feet of gross floor area and located in an HOD or a VCOD. | + | |
Effective on: 1/1/1901
Yard. An attached Accessory Dwelling is subject to all yard requirements applicable to the Accessory Building or principal structure in which it is located. A detached Accessory Dwelling located within an Accessory Building is subject to front yard and setback requirements applicable in the zoning district and may be located 5 feet from side and rear lot lines provided there are no windows or doors on the portion that encroaches into the required yard and setback applicable in the zoning district.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
Effective on: 1/1/1901
Intensity and Character.
(ZOAM-2024-0003, 02/12/2025)
Effective on: 2/12/2025




| Table 4.02.05-1. Intensity/Character | |||
|---|---|---|---|
| Use | Minimum Size of Lot | Maximum Number of Residents | |
| 1 | Level I – small scale | 5 acres | 5-10 residents |
| 2 | Level II – medium scale | 10 acres | 11-20 residents |
| 3 | Level III – large scale | 20 acres | 21-30 residents |
| 4 | Level IV – requires Special Exception approval pursuant to Section 10.11 | 30 acres | 31-40 residents |
| Table 4.02.05-1. Intensity/Character | |||
|---|---|---|---|
| Use | Minimum Size of Lot | Maximum Number of Residents | |
| 1 | Level I – small scale | 5 acres | 5-10 residents |
| 2 | Level II – medium scale | 10 acres | 11-20 residents |
| 3 | Level III – large scale | 20 acres | 21-30 residents |
| 4 | Level IV – requires Special Exception approval pursuant to Section 10.11 | 30 acres | 31-40 residents |
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025


Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025



Blocks containing SFD and SFA dwelling units must include an alley;
Garages must be alley-loaded; garages must not face or be accessed from any road within the Town Center Core;
Front entrances must be a minimum of 3 feet above the grade of the sidewalk.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025



Blocks containing MFS dwellings must include an alley;
Garages must be alley-loaded; garages must not face or be accessed from any road within the Town Center Core; and
Front entrances must be a minimum of 3 feet above the grade of the sidewalk;
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Private Parties.
Private parties at a Bed and Breakfast Homestay, Bed and Breakfast Inn, Country Inn, or Rural Resort are subject to the maximum attendees, times, and durations described below:
| Table 4.03.01-1. Private Parties | |||
|---|---|---|---|
| Use | Maximum Attendees (including overnight guests) for Parties Allowed on Daily Basis | Times per Calendar Year Parties May Exceed Maximum Daily Guests | |
| 1 | Bed and Breakfast Homestay | 20 | 10 |
| 2 | Bed and Breakfast Inn | 50 | 20 |
| 3 | Country Inn | 100 | 20 |
| 4 | Rural Resort as Event Facility (Section 4.03.01.H.6) | Section 4.04.05 | Section 4.04.05 |
| Table 4.03.01-1. Private Parties | |||
|---|---|---|---|
| Use | Maximum Attendees (including overnight guests) for Parties Allowed on Daily Basis | Times per Calendar Year Parties May Exceed Maximum Daily Guests | |
| 1 | Bed and Breakfast Homestay | 20 | 10 |
| 2 | Bed and Breakfast Inn | 50 | 20 |
| 3 | Country Inn | 100 | 20 |
| 4 | Rural Resort as Event Facility (Section 4.03.01.H.6) | Section 4.04.05 | Section 4.04.05 |
Cluster Subdivisions. Bed and Breakfast Homestay uses are permitted on Residential Cluster Lots, Preservation Farm Lots, and Rural Economy Cluster Lots. Bed and Breakfast Homestay uses are not permitted on Common Open Space Lots.
Cluster Subdivisions. On Rural Economy Cluster Lots, Bed and Breakfast Inn uses require Minor Special Exception review and approval. Bed and Breakfast Inns are not permitted on Residential Cluster Lots, Preservation Farm Lots, or Common Open Space Lots.
Cluster Subdivisions. Country Inns are not permitted within Cluster Subdivisions.
| Table 4.03.01-2. Intensity/Character | |||
|---|---|---|---|
| Minimum Lot Size | Number of Guest Rooms1 | Minimum Required Yard (From All Lot Lines) | |
| 1 | 40 acres | Up to 20 rooms | 125 ft |
| 2 | 60 acres | 21-40 rooms | 200 ft |
| 3 | 80 acres | 41-60 rooms | 250 ft |
| 4 | 100 acres | 61-80 rooms | 300 ft |
| 5 | 120 acres | 81-100 rooms | 350 ft |
| 6 | 150 acres | 101-120 rooms | 375 ft |
TABLE KEY: ft = feet TABLE NOTE: 1More than 120 rooms requires Special Exception approval pursuant to Section 10.11. | |||
| Table 4.03.01-2. Intensity/Character | |||
|---|---|---|---|
| Minimum Lot Size | Number of Guest Rooms1 | Minimum Required Yard (From All Lot Lines) | |
| 1 | 40 acres | Up to 20 rooms | 125 ft |
| 2 | 60 acres | 21-40 rooms | 200 ft |
| 3 | 80 acres | 41-60 rooms | 250 ft |
| 4 | 100 acres | 61-80 rooms | 300 ft |
| 5 | 120 acres | 81-100 rooms | 350 ft |
| 6 | 150 acres | 101-120 rooms | 375 ft |
TABLE KEY: ft = feet TABLE NOTE: 1More than 120 rooms requires Special Exception approval pursuant to Section 10.11. | |||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025




AR Cluster Subdivision. Day and boarding camps are not permitted within AR Cluster Subdivisions.
| Table 4.03.02-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Campers | Minimum Lot Area | |
| 1 | Level I—small scale | Up to 30 guests or boarders daily. | 15 acres |
| 2 | Level II—medium scale | Up to 100 guests or boarders daily. | 40 acres |
| 3 | Level III—large scale | Up to 250 guests or boarders daily. | 100 acres |
| 4 | Level IV | > 250 guests or boarders daily. | Special Exception pursuant to Section 10.11 |
| Table 4.03.02-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Campers | Minimum Lot Area | |
| 1 | Level I—small scale | Up to 30 guests or boarders daily. | 15 acres |
| 2 | Level II—medium scale | Up to 100 guests or boarders daily. | 40 acres |
| 3 | Level III—large scale | Up to 250 guests or boarders daily. | 100 acres |
| 4 | Level IV | > 250 guests or boarders daily. | Special Exception pursuant to Section 10.11 |
| Table 4.03.02-2. Site/Dimensional Standards | ||
|---|---|---|
| Use | Setback from Lot Lines | |
| 1 | Level I—small scale | 150 feet |
| 2 | Level II—medium scale | 200 feet |
| 3 | Level III—large scale | 250 feet |
| 4 | Level IV | 300 feet |
| Table 4.03.02-2. Site/Dimensional Standards | ||
|---|---|---|
| Use | Setback from Lot Lines | |
| 1 | Level I—small scale | 150 feet |
| 2 | Level II—medium scale | 200 feet |
| 3 | Level III—large scale | 250 feet |
| 4 | Level IV | 300 feet |
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Campgrounds are not permitted within AR Cluster Subdivisions.
| Table 4.03.03-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Campsites | Minimum Lot Area | |
| 1 | Level I—small scale | Up to 50 campsites | 40 acres |
| 2 | Level II—medium scale | >50 up to 100 campsites | 80 acres |
| 3 | Level III—large scale | >100 up to 150 campsites | 160 acres |
| 4 | Level IV | > 150 campsites | Special Exception pursuant to Section 10.11 |
| Table 4.03.03-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Campsites | Minimum Lot Area | |
| 1 | Level I—small scale | Up to 50 campsites | 40 acres |
| 2 | Level II—medium scale | >50 up to 100 campsites | 80 acres |
| 3 | Level III—large scale | >100 up to 150 campsites | 160 acres |
| 4 | Level IV | > 150 campsites | Special Exception pursuant to Section 10.11 |
| Table 4.03.03-2. Structure Size | |||
|---|---|---|---|
| Use | Scope of Use/Campsites | Maximum Total Size of All Structures | |
| 1 | Level I—small scale | Up to 50 campsites | 8,000 sf |
| 2 | Level II—medium scale | >50 up to 100 campsites | 16,000 sf |
| 3 | Level III—large scale | >100 up to 150 campsites | 32,000 sf |
| 4 | Level IV | >150 campsites | Special Exception pursuant to Section 10.11 |
TABLE KEY: sf = square feet and > = greater than | |||
| Table 4.03.03-2. Structure Size | |||
|---|---|---|---|
| Use | Scope of Use/Campsites | Maximum Total Size of All Structures | |
| 1 | Level I—small scale | Up to 50 campsites | 8,000 sf |
| 2 | Level II—medium scale | >50 up to 100 campsites | 16,000 sf |
| 3 | Level III—large scale | >100 up to 150 campsites | 32,000 sf |
| 4 | Level IV | >150 campsites | Special Exception pursuant to Section 10.11 |
TABLE KEY: sf = square feet and > = greater than | |||
| Table 4.03.03-3. Site/Dimensional Standards | ||||
|---|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | Setback from Lot Lines | |
| 1 | Level I—small scale | 40 acres | 8,000 sf | 150 ft |
| 2 | Level II—medium scale | 80 acres | 16,000 sf | 200 ft |
| 3 | Level III—large scale | 160 acres | 32,000 sf | 250 ft |
TABLE KEY: ft = feet and sf = square feet | ||||
| Table 4.03.03-3. Site/Dimensional Standards | ||||
|---|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | Setback from Lot Lines | |
| 1 | Level I—small scale | 40 acres | 8,000 sf | 150 ft |
| 2 | Level II—medium scale | 80 acres | 16,000 sf | 200 ft |
| 3 | Level III—large scale | 160 acres | 32,000 sf | 250 ft |
TABLE KEY: ft = feet and sf = square feet | ||||
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025





Locational Criteria. Hotel/Motel uses must be separated from zoning districts allowing residential uses by a minimum Buffer Type B and a minimum width of 100 feet. Exception. This requirement does not apply to the TRC, TC, PD-AAAR, and PD-MUB Zoning Districts.
Effective on: 1/1/1901
Effective on: 1/1/1901
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025



AR Cluster Subdivisions. Art Studio and Antiques, Art, and Crafts uses are not permitted within AR Cluster Subdivisions.
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025




Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
AR Cluster Subdivisions. Banquet/Event Facility uses are prohibited within AR Cluster Subdivisions.
Intensity/Character.
| Table 4.04.05-1. Intensity/Character Attendees | ||
|---|---|---|
| Minimum Acreage | Maximum Number of Attendees | |
| 1 | 20 acres | 200 attendees |
| 2 | 50 acres | 260 attendees |
| 3 | 75 acres | 310 attendees |
| 4 | 100 acres | 360 attendees |
| Table 4.04.05-1. Intensity/Character Attendees | ||
|---|---|---|
| Minimum Acreage | Maximum Number of Attendees | |
| 1 | 20 acres | 200 attendees |
| 2 | 50 acres | 260 attendees |
| 3 | 75 acres | 310 attendees |
| 4 | 100 acres | 360 attendees |
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Commercial nurseries are permitted by Special Exception review and approval on Preservation Farm Lots and Rural Economy Cluster Lots. Commercial nurseries are not permitted on Residential Cluster Lots or Common Open Space Lots.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025










Exception. The buffer requirement in Section 4.04.10.B.12.a does not apply when the drive-through facility is provided in a vertically mixed-use building containing residential uses in the TRC, TC, and PD-MUB Zoning Districts.
Effective on: 1/1/1901
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
Effective on: 1/1/1901
Effective on: 1/1/1901
No structure may be located within 500 feet of an existing residential dwelling.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Farmers Markets are not permitted on Residential Cluster Lots.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Feed and farm supply centers are not permitted within AR Cluster Subdivisions.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025


Effective on: 1/1/1901
Limited rural restaurants, subject to Section 4.04.18.B.2. are not permitted within AR Cluster Subdivisions.
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Small Business, Agricultural, and Rural uses are permitted on Rural Economy Cluster Lots. Such uses are not permitted on Residential Cluster Lots, Preservation Farm Lots, or Common Open Space Lots.
| Table 4.04.19-1. Small Business Uses | ||||
|---|---|---|---|---|
| Acreage | No. of Employees1 | Heavy Equipment (On-Site) | Business Vehicles2 (On-Site) | |
| 1 | Less than 10 acres | 3 maximum | none | 2 maximum |
| 2 | 10 but less than 50 acres | 4 maximum | 2 maximum | 4 maximum |
| 3 | 50 acres or greater | 10 maximum | 5 maximum | 6 maximum |
TABLE NOTES: 1An employee is a person, other than members of the household permanently residing on the premises, who is engaged on-site in the operation of the small business on a regular or part-time basis. 2 A business vehicle may not exceed a rated capacity of one and one half (1.5) tons or have more than two axles. | ||||
| Table 4.04.19-1. Small Business Uses | ||||
|---|---|---|---|---|
| Acreage | No. of Employees1 | Heavy Equipment (On-Site) | Business Vehicles2 (On-Site) | |
| 1 | Less than 10 acres | 3 maximum | none | 2 maximum |
| 2 | 10 but less than 50 acres | 4 maximum | 2 maximum | 4 maximum |
| 3 | 50 acres or greater | 10 maximum | 5 maximum | 6 maximum |
TABLE NOTES: 1An employee is a person, other than members of the household permanently residing on the premises, who is engaged on-site in the operation of the small business on a regular or part-time basis. 2 A business vehicle may not exceed a rated capacity of one and one half (1.5) tons or have more than two axles. | ||||
| Table 4.04.19-2. Structures1 | ||
|---|---|---|
| Acreage | Cumulative Size of Structures | |
| 1 | Up to 5 acres | 2,000 sf max |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf max |
| 3 | 10 acres or greater | 5,000 sf max for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf max |
TABLE KEY: sf = square feet and max = maximum TABLE NOTE: 1Building Height: 35 feet maximum. | ||
| Table 4.04.19-2. Structures1 | ||
|---|---|---|
| Acreage | Cumulative Size of Structures | |
| 1 | Up to 5 acres | 2,000 sf max |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf max |
| 3 | 10 acres or greater | 5,000 sf max for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf max |
TABLE KEY: sf = square feet and max = maximum TABLE NOTE: 1Building Height: 35 feet maximum. | ||
| Table 4.04.19-3. Storage Areas1,2, and 3 | ||
|---|---|---|
| Acreage | Cumulative Size of Storage Yards | |
| 1 | Up to 5 acres | 2,000 sf max |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf max |
| 3 | 10 acres or greater | 5,000 sf max for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf max |
TABLE KEY: sf = square feet and max = maximum TABLE NOTES: 1All heavy equipment must be located within a storage area. 2Storage areas must be screened consistent with the requirements of Section 7.04.05. 3Outdoor storage space must be enclosed on all sides by a fence. | ||
| Table 4.04.19-3. Storage Areas1,2, and 3 | ||
|---|---|---|
| Acreage | Cumulative Size of Storage Yards | |
| 1 | Up to 5 acres | 2,000 sf max |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf max |
| 3 | 10 acres or greater | 5,000 sf max for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf max |
TABLE KEY: sf = square feet and max = maximum TABLE NOTES: 1All heavy equipment must be located within a storage area. 2Storage areas must be screened consistent with the requirements of Section 7.04.05. 3Outdoor storage space must be enclosed on all sides by a fence. | ||
Setbacks.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Applicability. Section 4.04.20 applies to Heavy Vehicle Repair uses in the GI Zoning District.
Motor vehicle sales are permitted as an accessory use to Heavy Vehicle Repair subject to this Section 4.04.20.C. This section does not prevent a mechanic from selling a car to recover costs associated with a mechanic's lien.
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
Applicability. Section 4.04.24 applies to animal care businesses.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Applicability. Section 4.04.25 applies to veterinary services.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Applicability. Section 4.04.26 applies to adult day care uses.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
| Table 4.05.02-1. Minimum Setback from Lot Lines | ||
|---|---|---|
| Structure Size (Gross Floor Area) | Minimum Setback from All Lot Lines | |
| 1 | Greater than 18,000 sf | 225 ft |
| 2 | Greater than 9,000 sf and up to 18,000 sf | 175 ft |
| 3 | Up to or less than 9,000 sf | 125 ft |
TABLE KEY: ft = feet; sf = square feet | ||
| Table 4.05.02-1. Minimum Setback from Lot Lines | ||
|---|---|---|
| Structure Size (Gross Floor Area) | Minimum Setback from All Lot Lines | |
| 1 | Greater than 18,000 sf | 225 ft |
| 2 | Greater than 9,000 sf and up to 18,000 sf | 175 ft |
| 3 | Up to or less than 9,000 sf | 125 ft |
TABLE KEY: ft = feet; sf = square feet | ||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Size of Use Standards.
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Applicability. Section 4.05.05 applies to Cultural Facilities within the SN, A-10, A-3, CR, AR, TR, JLMA, and R Zoning Districts.
Museum and interactive science and technology center uses are not permitted within AR Cluster Subdivisions.
Hours of Operation. The hours of operation are limited to 6:00 a.m. to 9:00 p.m., except permitted temporary special events.
Accessory Uses. Accessory uses are only permitted on lots 20 acres in size or larger. Accessory uses may include retail sales (e.g., gift shops), small restaurants or cafes, or visitor centers and are subject to the following standards:
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Conference and training facilities are not permitted within AR Cluster Subdivisions.
Table 4.05.06-1. Intensity/Character | |||
|---|---|---|---|
| Use | Lot Area (Minimum) | Average Daily Users1,2 | |
| 1 | Level I-small scale | 50 acres | Up to 50 users |
| 2 | Level II-medium scale | 100 acres | >50 and up to 100 users |
| 3 | Level III-large scale | 150 acres | >100 and up to 150 users |
| 4 | Level IV | Requires Minor Special Exception approval pursuant to Section 10.11.01 | >150 users |
TABLE NOTES: 1Average daily users include the employees, trainees and conferees the conference and training facility is designed to accommodate. 2Service trips, which are trips made to the facility for the purpose of delivering food, supplies, and related materials, are in addition to the average daily users. | |||
Table 4.05.06-1. Intensity/Character | |||
|---|---|---|---|
| Use | Lot Area (Minimum) | Average Daily Users1,2 | |
| 1 | Level I-small scale | 50 acres | Up to 50 users |
| 2 | Level II-medium scale | 100 acres | >50 and up to 100 users |
| 3 | Level III-large scale | 150 acres | >100 and up to 150 users |
| 4 | Level IV | Requires Minor Special Exception approval pursuant to Section 10.11.01 | >150 users |
TABLE NOTES: 1Average daily users include the employees, trainees and conferees the conference and training facility is designed to accommodate. 2Service trips, which are trips made to the facility for the purpose of delivering food, supplies, and related materials, are in addition to the average daily users. | |||
| Table 4.05.06-2. Site/Dimensional Standards | ||
|---|---|---|
| Use | Setback from Lot Lines (Minimum) | |
| 1 | Level I—small scale | 150 ft |
| 2 | Level II—medium scale | 200 ft |
| 3 | Level III—large scale and Level IV | 250 ft |
TABLE KEY: ft = feet | ||
| Table 4.05.06-2. Site/Dimensional Standards | ||
|---|---|---|
| Use | Setback from Lot Lines (Minimum) | |
| 1 | Level I—small scale | 150 ft |
| 2 | Level II—medium scale | 200 ft |
| 3 | Level III—large scale and Level IV | 250 ft |
TABLE KEY: ft = feet | ||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
| Table 4.05.07-1. Intensity/Character | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Level I-small scale | 50 acres |
| 2 | Level II-medium scale | 75 acres |
| 3 | Level III-large scale | 150 acres |
| Table 4.05.07-1. Intensity/Character | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Level I-small scale | 50 acres |
| 2 | Level II-medium scale | 75 acres |
| 3 | Level III-large scale | 150 acres |
| Table 4.05.07-2. Structure Size | ||
|---|---|---|
| Use | Maximum Total Size of Permitted Principal Structures (Gross Floor Area) | |
| 1 | Level I—small scale | 25,000 sf |
| 2 | Level II—medium scale | 50,000 sf |
| 3 | Level III—large scale | 75,000 sf |
TABLE KEY: sf = square feet | ||
| Table 4.05.07-2. Structure Size | ||
|---|---|---|
| Use | Maximum Total Size of Permitted Principal Structures (Gross Floor Area) | |
| 1 | Level I—small scale | 25,000 sf |
| 2 | Level II—medium scale | 50,000 sf |
| 3 | Level III—large scale | 75,000 sf |
TABLE KEY: sf = square feet | ||
| Table 4.05.07-3. Distribution of Uses | ||
|---|---|---|
| Use | Total Maximum Gross Floor Area of the Principal Permitted Structures | |
| 1 | Dining and Restaurant Facilities | 30% |
| 2 | Banquet and Conference Facilities | 25% |
| 3 | Spa and Health Facilities | 15% |
| Table 4.05.07-3. Distribution of Uses | ||
|---|---|---|
| Use | Total Maximum Gross Floor Area of the Principal Permitted Structures | |
| 1 | Dining and Restaurant Facilities | 30% |
| 2 | Banquet and Conference Facilities | 25% |
| 3 | Spa and Health Facilities | 15% |
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
Effective on: 1/1/1901
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
| Table 4.05.09-1 Fairground Minimum Setback from Lot Lines | ||
|---|---|---|
| Structure Size (Gross Floor Area) | Minimum Setback from Lot Lines | |
| 1 | Less than 20,000 sf | 150 ft |
| 2 | 20,000 sf to 40,000 sf | 200 ft |
| 3 | Greater than 40,000 sf | 225 ft |
| TABLE KEY: ft = feet and sf = square feet | ||
| Table 4.05.09-1 Fairground Minimum Setback from Lot Lines | ||
|---|---|---|
| Structure Size (Gross Floor Area) | Minimum Setback from Lot Lines | |
| 1 | Less than 20,000 sf | 150 ft |
| 2 | 20,000 sf to 40,000 sf | 200 ft |
| 3 | Greater than 40,000 sf | 225 ft |
| TABLE KEY: ft = feet and sf = square feet | ||
Effective on: 1/1/1901
| Table 4.05.10-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Event | Lot Area Requirement | |
| 1 | Level I—small scale | No more than 150 vehicles allowed on site at any 1 time | >5 acres, up to 40 |
| 2 | Level II—medium scale | No more than 300 vehicles allowed on site at any 1 time | >40 acres, up to 80 |
| 3 | Level III—large scale | No more than 400 vehicles allowed on site at any 1 time | >80 acres |
| TABLE KEY: > = greater than | |||
| Table 4.05.10-1. Intensity/Character | |||
|---|---|---|---|
| Use | Scope of Use/Event | Lot Area Requirement | |
| 1 | Level I—small scale | No more than 150 vehicles allowed on site at any 1 time | >5 acres, up to 40 |
| 2 | Level II—medium scale | No more than 300 vehicles allowed on site at any 1 time | >40 acres, up to 80 |
| 3 | Level III—large scale | No more than 400 vehicles allowed on site at any 1 time | >80 acres |
| TABLE KEY: > = greater than | |||
| Table 4.05.10-2. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | |
| 1 | Level I—small scale | 5 acres, up to 40 acres | Up to 5,000 sf |
| 2 | Level II—medium scale | >40 acres, up to 80 acres | > 5,000 sf, up to 7,500 sf |
| 3 | Level III—large scale | >80 acres | > 7,500 sf, up to 10,500 sf |
TABLE KEY: ft = feet, sf = square feet, and > = greater than | |||
| Table 4.05.10-2. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | |
| 1 | Level I—small scale | 5 acres, up to 40 acres | Up to 5,000 sf |
| 2 | Level II—medium scale | >40 acres, up to 80 acres | > 5,000 sf, up to 7,500 sf |
| 3 | Level III—large scale | >80 acres | > 7,500 sf, up to 10,500 sf |
TABLE KEY: ft = feet, sf = square feet, and > = greater than | |||
| Table 4.05.10-3. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | Up to 5,000 sf | 100 ft |
| 2 | Level II—medium scale | >5,000 sf up to 7,500 sf | 150 ft |
| 3 | Level III—large scale | >7,500 sf, up to 10,000 sf | 200 ft |
TABLE KEY: ft = feet, sf = square feet, and > = greater than | |||
| Table 4.05.10-3. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | Up to 5,000 sf | 100 ft |
| 2 | Level II—medium scale | >5,000 sf up to 7,500 sf | 150 ft |
| 3 | Level III—large scale | >7,500 sf, up to 10,000 sf | 200 ft |
TABLE KEY: ft = feet, sf = square feet, and > = greater than | |||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
AR Cluster Subdivisions. Fire and/or rescue station uses are not permitted within AR Cluster Subdivisions.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
AR Cluster Subdivisions. Rural Retreat uses are permitted by Minor Special Exception review and approval on Rural Economy Cluster Lots. Such uses are not permitted on Residential Cluster Lots, Preservation Farm Lots, or Common Open Space Lots.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Private schools are not permitted within AR Cluster Subdivisions; and
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Approval.
Effective on: 1/1/1901
Approval.
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
TRC, UE, TC, CC-NC, CC-CC, CC-SC, PD-CC(RC), PD-MUB, RC, GB, PD-RV, and TCC Zoning Districts.
Effective on: 1/1/1901
Façade Standards.
Principal Façade.
Applicability. Principal Façade requirements apply to all building façades that face adjacent existing or planned public roads or that face an adjacent property with existing residential development, an approved CDP, or plat, or plan showing residential development, or Zoning District permitting residential uses; and all building facades adjacent to or facing property with the following existing uses or an approved CDP, or plat, or plan showing the following uses:
Uses listed in Chapter 3 under the Residential and Lodging use classifications;
Uses listed in Chapter 3 under the Day Care, Financial Services, Food and Beverage Sales/Service, Government, Education, Arts, Entertainment, and Recreation, and Retail use categories; and
| Figure 4.06.02-1. Data Center Standards |
|---|
![]() |
| Figure 4.06.02-1. Data Center Standards |
|---|
![]() |
Effective on: 1/1/1901
| Table 4.06.03-1. Extractive Industries Dimensional Standards | ||
|---|---|---|
| Standard | Requirement | |
| Lot Requirements | ||
| 1 | Lot Size (min) | 3 acres, exclusive of major floodplain |
| 2 | Lot Width (min) | 200 ft fronting on public or private roads |
| 3 | Lot Depth (min) | 500 ft |
| Yards | ||
| 4 | Setback Adjacent to Roads (min)1, 2 | 50 ft |
| 5 | Setback from Any Property Line (min)2 | 50 ft |
TABLE KEY: ft = feet and min = minimum TABLE NOTES: 1Except when a greater setback is required by Section 7.04.02. 2Except when a greater setback is required by Section 7.01.07. | ||
| Table 4.06.03-1. Extractive Industries Dimensional Standards | ||
|---|---|---|
| Standard | Requirement | |
| Lot Requirements | ||
| 1 | Lot Size (min) | 3 acres, exclusive of major floodplain |
| 2 | Lot Width (min) | 200 ft fronting on public or private roads |
| 3 | Lot Depth (min) | 500 ft |
| Yards | ||
| 4 | Setback Adjacent to Roads (min)1, 2 | 50 ft |
| 5 | Setback from Any Property Line (min)2 | 50 ft |
TABLE KEY: ft = feet and min = minimum TABLE NOTES: 1Except when a greater setback is required by Section 7.04.02. 2Except when a greater setback is required by Section 7.01.07. | ||
| Figure 4.06.03-1 Particle Velocities at Frequency Levels |
|---|
![]() |
| Figure 4.06.03-1 Particle Velocities at Frequency Levels |
|---|
![]() |
Effective on: 1/1/1901
Pursuant to Section 10.04, a Zoning Permit, required prior to the commencement of any use or change of use, must identify the specific use as listed in the Use Tables of Section 3.02 and demonstrate conformance to any applicable use-specific standards of Chapter 4; and
Effective on: 1/1/1901
Effective on: 1/1/1901
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
| Table 4.06.09-1. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Size | Maximum Size of Structures | |
| 1 | Level I—small scale | 12 acres | 3,500 square feet |
| 2 | Level II—medium scale | 20 acres | 5,500 square feet |
| 3 | Level III—large scale | 25 acres | 7,000 square feet |
| Table 4.06.09-1. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Size | Maximum Size of Structures | |
| 1 | Level I—small scale | 12 acres | 3,500 square feet |
| 2 | Level II—medium scale | 20 acres | 5,500 square feet |
| 3 | Level III—large scale | 25 acres | 7,000 square feet |
| Table 4.06.09-2. Storage Yards | |||
|---|---|---|---|
| Use | Minimum Lot Size | Maximum Size of Storage Yard | |
| 1 | Level I—small scale | 12 acres | 1 acre |
| 2 | Level II—medium scale | 20 acres | 2 acres |
| 3 | Level III—large scale | 25 acres | 3 acres |
| Table 4.06.09-2. Storage Yards | |||
|---|---|---|---|
| Use | Minimum Lot Size | Maximum Size of Storage Yard | |
| 1 | Level I—small scale | 12 acres | 1 acre |
| 2 | Level II—medium scale | 20 acres | 2 acres |
| 3 | Level III—large scale | 25 acres | 3 acres |
| Table 4.06.09-3. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | Up to 3,500 sf | 225 ft |
| 2 | Level II—medium scale | >3,500 sf, up to 5,500 sf | 275 ft |
| 3 | Level III—large scale | >5,500 sf, up to 7,000 sf | 325 ft |
| TABLE KEY: sf = square feet, ft = feet, > = greater than | |||
| Table 4.06.09-3. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | Up to 3,500 sf | 225 ft |
| 2 | Level II—medium scale | >3,500 sf, up to 5,500 sf | 275 ft |
| 3 | Level III—large scale | >5,500 sf, up to 7,000 sf | 325 ft |
| TABLE KEY: sf = square feet, ft = feet, > = greater than | |||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
Effective on: 1/1/1901
AR Cluster Subdivisions. Airport/Landing Strip uses are not permitted within AR Cluster Subdivisions.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Height.
Specific Buffer and Berm Requirements. In lieu of the buffer required under Table 7.04.03-1, a Buffer Type C is required with the specified plantings, and located on an earthen berm that has a minimum height of 6 feet and a grade lower than 2:1. Use of natural topography and preservation of existing vegetation, supplemented by new vegetation, if needed, may be substituted if determined by the County Urban Forester to provide an equivalent density, depth, and height to the required Buffer Type C and earthen berm.
Effective on: 1/1/1901
| Table 4.07.03-1. Parking Facility Type | ||||||
|---|---|---|---|---|---|---|
Zoning District |
Accessory Parking Area Surface
| Accessory Parking Area | Principal Off-Street Parking Facility Surface | Principal Off-Street Parking Facility Structured | Commuter Parking Lot less than or equal to 50 Spaces | Commuter Parking Lot greater than 50 Spaces |
| Urban | ||||||
TRC Inner Core | P/S1 | P |
| P | S | S |
TRC Outer Core | P/S1 | P | S | P | S | S |
TRC TDSA | P | P | S | P | S | S |
UE | P/S1 | P | S | P | S | S |
| Suburban | ||||||
CC-NC, CC-CC, CC-SC | P | P | S | P | P | P |
SN | P |
| S |
| P | S |
SCN | P | P | S | P | P | S |
TC Core | P/S1 | P | S | P | S | S |
TC Fringe | P | P | S | P | P | p |
| Legacy Suburban | ||||||
CLI | P | |||||
GB | P |
| S |
| P | P |
PD-AAAR | P | P |
|
|
|
|
PD-CC(RC) | P | P | S | S | P |
|
PD-MUB | P/S1 | P | M | P | P | P |
PD-RDP | P | P | S | P | P | P |
PD-SA | P | P | S | P | P | P |
R | P | P |
|
| P | S |
| Transition | ||||||
TR | P |
|
|
|
|
|
TR-2 | P |
|
|
|
|
|
TCC | P |
| S |
| P | S |
TCN | P |
| S |
| P | S |
TSN | P |
| S |
| P | S |
| Legacy Transition | ||||||
| TR-2 | P | |||||
| Rural | ||||||
AR | P |
|
|
| P | S |
| Legacy Rural | ||||||
A-3, A-10 | P |
|
|
| P | S |
CR | P |
|
|
| P | S |
PD-RV Conservancy |
|
|
|
| P |
|
RC | P |
|
|
| P | P |
| JLMA | ||||||
JLMA | P |
|
|
| P | S |
| Legacy JLMA | ||||||
| JLMA-20 | P | |||||
| Office and Industrial | ||||||
GI | P |
| P | P |
|
|
IP | P |
| S | S | P | P |
MR-HI | P |
|
|
| S | S |
OP | P | P | S | P | P | P |
TABLE NOTE: 1 Permitted accessory parking limited to on-street parking. | ||||||
| Table 4.07.03-1. Parking Facility Type | ||||||
|---|---|---|---|---|---|---|
Zoning District |
Accessory Parking Area Surface
| Accessory Parking Area | Principal Off-Street Parking Facility Surface | Principal Off-Street Parking Facility Structured | Commuter Parking Lot less than or equal to 50 Spaces | Commuter Parking Lot greater than 50 Spaces |
| Urban | ||||||
TRC Inner Core | P/S1 | P |
| P | S | S |
TRC Outer Core | P/S1 | P | S | P | S | S |
TRC TDSA | P | P | S | P | S | S |
UE | P/S1 | P | S | P | S | S |
| Suburban | ||||||
CC-NC, CC-CC, CC-SC | P | P | S | P | P | P |
SN | P |
| S |
| P | S |
SCN | P | P | S | P | P | S |
TC Core | P/S1 | P | S | P | S | S |
TC Fringe | P | P | S | P | P | p |
| Legacy Suburban | ||||||
CLI | P | |||||
GB | P |
| S |
| P | P |
PD-AAAR | P | P |
|
|
|
|
PD-CC(RC) | P | P | S | S | P |
|
PD-MUB | P/S1 | P | M | P | P | P |
PD-RDP | P | P | S | P | P | P |
PD-SA | P | P | S | P | P | P |
R | P | P |
|
| P | S |
| Transition | ||||||
TR | P |
|
|
|
|
|
TR-2 | P |
|
|
|
|
|
TCC | P |
| S |
| P | S |
TCN | P |
| S |
| P | S |
TSN | P |
| S |
| P | S |
| Legacy Transition | ||||||
| TR-2 | P | |||||
| Rural | ||||||
AR | P |
|
|
| P | S |
| Legacy Rural | ||||||
A-3, A-10 | P |
|
|
| P | S |
CR | P |
|
|
| P | S |
PD-RV Conservancy |
|
|
|
| P |
|
RC | P |
|
|
| P | P |
| JLMA | ||||||
JLMA | P |
|
|
| P | S |
| Legacy JLMA | ||||||
| JLMA-20 | P | |||||
| Office and Industrial | ||||||
GI | P |
| P | P |
|
|
IP | P |
| S | S | P | P |
MR-HI | P |
|
|
| S | S |
OP | P | P | S | P | P | P |
TABLE NOTE: 1 Permitted accessory parking limited to on-street parking. | ||||||
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025


Unsafe or Abandoned Facility/Decommissioning.
Placement.
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
There is some valid economic, technological, or physical justification as to why co-location is not possible, and the applicant has identified the conditions under which future co-location by other service providers is permitted; and
There is some valid economic, technological, or physical justification as to why co-location is not possible and the applicant has identified the conditions under which future co-location by other service providers is permitted; and
Such co-location would exceed the structural capacity of existing and approved telecommunications facilities, including the planned use of such facilities, and such facilities cannot be reinforced to accommodate the co-location at a reasonable cost;
Such co-location will cause interference with other existing or planned equipment for that telecommunications facility, and that interference cannot be prevented at a reasonable cost;
Existing or approved telecommunications facilities do not have space to accommodate the co-location so as to provide adequate service; and
Existing and approved telecommunications facilities will not provide adequate signal coverage; and
(ZOAM-2020-0002, 06/12/2024)
Effective on: 6/9/2024
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Effective on: 1/1/1901
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
| Table 4.08.03-1. Intensity/Character Site Size Exceptions | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Equestrian Event Facility | 25 acres |
| 2 | Restaurant, Rural | 20 acres |
| 3 | Stable, Livery | 15 acres |
| Table 4.08.03-1. Intensity/Character Site Size Exceptions | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Equestrian Event Facility | 25 acres |
| 2 | Restaurant, Rural | 20 acres |
| 3 | Stable, Livery | 15 acres |
| Table 4.08.03-2. Intensity/Character by Scale | |||
|---|---|---|---|
| Use | Scope of Use/Event | Minimum Lot Area | |
| 1 | Level I—small scale | No more than 100 vehicles on site at any 1 time | 5 to 25 acres Section 4.08.03.B.2 |
| 2 | Level II—medium scale | No more than 200 vehicles on site at any 1 time | >25 acres, up to 50 acres |
| 3 | Level III—large scale | No more than 300 vehicles on site at any 1 time. Exception: 2 additional vehicles allowed per acre in excess of 100 acres | >50 acres, up to 100 acres |
| Table 4.08.03-2. Intensity/Character by Scale | |||
|---|---|---|---|
| Use | Scope of Use/Event | Minimum Lot Area | |
| 1 | Level I—small scale | No more than 100 vehicles on site at any 1 time | 5 to 25 acres Section 4.08.03.B.2 |
| 2 | Level II—medium scale | No more than 200 vehicles on site at any 1 time | >25 acres, up to 50 acres |
| 3 | Level III—large scale | No more than 300 vehicles on site at any 1 time. Exception: 2 additional vehicles allowed per acre in excess of 100 acres | >50 acres, up to 100 acres |
| Table 4.08.03-3. Structure | |||
|---|---|---|---|
| Use | Lot Area | Maximum Size of Structures | |
| 1 | Level I—small scale | 5 to 25 acres | 30,000 sf |
| 2 | Level II—medium scale | >25 acres, up to 50 acres | 30,000 sf |
| 3 | Level III—large scale | > 50 acres, up to 100 acres Exception: Additional 2,400 sf of structure size allowed per every 10 acres in excess of 100 acres, up to 48,000 sf in total structure size | 36,000 sf |
TABLE KEY: sf = square feet and > = greater than | |||
| Table 4.08.03-3. Structure | |||
|---|---|---|---|
| Use | Lot Area | Maximum Size of Structures | |
| 1 | Level I—small scale | 5 to 25 acres | 30,000 sf |
| 2 | Level II—medium scale | >25 acres, up to 50 acres | 30,000 sf |
| 3 | Level III—large scale | > 50 acres, up to 100 acres Exception: Additional 2,400 sf of structure size allowed per every 10 acres in excess of 100 acres, up to 48,000 sf in total structure size | 36,000 sf |
TABLE KEY: sf = square feet and > = greater than | |||
| Table 4.08.03-4. Storage Areas | |||
|---|---|---|---|
| Use | Lot Area | Maximum Size of Storage Areas | |
| 1 | Level I—small scale | 5 to 25 acres | 5,000 sf |
TABLE KEY: sf = square feet TABLE NOTE: An additional 1,000 sf of storage area is allowed per every 10 acres in excess of 25 acres, up to 20,000 sf in total storage area size. | |||
| Table 4.08.03-4. Storage Areas | |||
|---|---|---|---|
| Use | Lot Area | Maximum Size of Storage Areas | |
| 1 | Level I—small scale | 5 to 25 acres | 5,000 sf |
TABLE KEY: sf = square feet TABLE NOTE: An additional 1,000 sf of storage area is allowed per every 10 acres in excess of 25 acres, up to 20,000 sf in total storage area size. | |||
| Table 4.08.03-5. Site/Dimensional Standards | ||||
|---|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | 5 to 25 acres | 12,000 sf | 60 ft |
| 2 | Level II—medium scale | >25 acres, up to 50 acres | 24,000 sf | 120 ft |
| 3 | Level III—large scale | > 50 acres, up to 100 acres | 36,000 sf | 175 ft |
TABLE KEY: sf = square feet, ft = feet, and > = greater than | ||||
| Table 4.08.03-5. Site/Dimensional Standards | ||||
|---|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Level I—small scale | 5 to 25 acres | 12,000 sf | 60 ft |
| 2 | Level II—medium scale | >25 acres, up to 50 acres | 24,000 sf | 120 ft |
| 3 | Level III—large scale | > 50 acres, up to 100 acres | 36,000 sf | 175 ft |
TABLE KEY: sf = square feet, ft = feet, and > = greater than | ||||
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/09/2024)
Effective on: 3/12/2025
| Table 4.08.04-1. Intensity/Character Site Size Exceptions | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Agricultural education or research | 25 acres |
| 2 | Equestrian event facility | 25 acres |
| 3 | Farm distribution hub | 25 acres |
| Table 4.08.04-1. Intensity/Character Site Size Exceptions | ||
|---|---|---|
| Use | Minimum Lot Area | |
| 1 | Agricultural education or research | 25 acres |
| 2 | Equestrian event facility | 25 acres |
| 3 | Farm distribution hub | 25 acres |
| Table 4.08.04-2. Intensity/Character by Scale | |||
|---|---|---|---|
| Use | Scope of Use/Event | Minimum Lot Area | |
| 1 | Level I - small scale | No more than 100 vehicles on site at any 1 time | 5 to 25 acres Section 4.08.04.B.1 above |
| 2 | Level II - medium scale | No more than 200 vehicles on site at any 1 time | >25 acres, up to 50 acres |
| 3 | Level III - large scale | No more than 300 vehicles on site at any 1 time Exception: 2 additional vehicles are allowed per acre in excess of 100 acres | >50 acres, up to 100 acres |
| Table 4.08.04-2. Intensity/Character by Scale | |||
|---|---|---|---|
| Use | Scope of Use/Event | Minimum Lot Area | |
| 1 | Level I - small scale | No more than 100 vehicles on site at any 1 time | 5 to 25 acres Section 4.08.04.B.1 above |
| 2 | Level II - medium scale | No more than 200 vehicles on site at any 1 time | >25 acres, up to 50 acres |
| 3 | Level III - large scale | No more than 300 vehicles on site at any 1 time Exception: 2 additional vehicles are allowed per acre in excess of 100 acres | >50 acres, up to 100 acres |
| Table 4.08.04-3. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | |
| 1 | Agricultural education or research facility | 25 acres | FAR: 0.02 |
| 2 | Farm distribution hub | 25 acres | FAR: 0.02 |
| All Other Uses | |||
| 3 | Level I—small scale | 5 to 25 acres | 12,000 sf |
| 4 | Level II—medium scale | > 25 acres, up to 50 acres | 24,000 sf |
| 5 | Level III—large scale | > 50 acres, up to100 acres Exception. Additional 2,400 sf of structure size allowed per every 10 acres in excess of 100 acres, up to 48,000 sf in total structure size | 36,000 sf |
TABLE KEY: FAR = Floor Area Ratio, sf = square feet, and > = greater than | |||
| Table 4.08.04-3. Structure | |||
|---|---|---|---|
| Use | Minimum Lot Area | Maximum Size of Structures | |
| 1 | Agricultural education or research facility | 25 acres | FAR: 0.02 |
| 2 | Farm distribution hub | 25 acres | FAR: 0.02 |
| All Other Uses | |||
| 3 | Level I—small scale | 5 to 25 acres | 12,000 sf |
| 4 | Level II—medium scale | > 25 acres, up to 50 acres | 24,000 sf |
| 5 | Level III—large scale | > 50 acres, up to100 acres Exception. Additional 2,400 sf of structure size allowed per every 10 acres in excess of 100 acres, up to 48,000 sf in total structure size | 36,000 sf |
TABLE KEY: FAR = Floor Area Ratio, sf = square feet, and > = greater than | |||
| Table 4.08.04-4. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Agricultural education or research facility | FAR (all structures): 0.02 | 150 ft |
| 2 | Farm distribution Hub | FAR (all structures): 0.02 | 150 ft |
| All Other Uses | |||
| 3 | Level I—small scale | 12,000 sf | 60 ft |
| 4 | Level II—medium scale | 24,000 sf | 120 ft |
| 5 | Level III—large scale | 36,000 sf | 175 ft |
TABLE KEY: FAR = Floor Area Ratio, sf = square feet, and ft = feet | |||
| Table 4.08.04-4. Site/Dimensional Standards | |||
|---|---|---|---|
| Use | Maximum Size of Structures | Minimum Setback from Lot Lines | |
| 1 | Agricultural education or research facility | FAR (all structures): 0.02 | 150 ft |
| 2 | Farm distribution Hub | FAR (all structures): 0.02 | 150 ft |
| All Other Uses | |||
| 3 | Level I—small scale | 12,000 sf | 60 ft |
| 4 | Level II—medium scale | 24,000 sf | 120 ft |
| 5 | Level III—large scale | 36,000 sf | 175 ft |
TABLE KEY: FAR = Floor Area Ratio, sf = square feet, and ft = feet | |||
(ZOAM-2020-0002, 06/09/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/11/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Exterior Lighting. Exterior lighting is subject to Section 7.05.02.C.2.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
Retail Sales. Accessory retail sales must not exceed a total area of 600 square feet.
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/11/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
| Table 4.08.12-1. Standards | ||||
|---|---|---|---|---|
| Acreage | Maximum Number of Employees1 | Maximum Number of Heavy Equipment (On-Site) | Maximum Number of Business Vehicles (On-Site)2 | |
| 1 | Less than 10 acres | 3 | none | 2 |
| 2 | 10 but less than 50 acres | 4 | 2 | 4 |
| 3 | 50 acres or greater | 10 | 5 | 6 |
TABLE NOTES: 1An employee is a person, other than members of the household permanently residing on the premises, who is engaged on-site in the operation of the agricultural processing on a regular or part-time basis. 2A business vehicle may not exceed a rated capacity of 1.5 tons or have more than 2 axles. | ||||
| Table 4.08.12-1. Standards | ||||
|---|---|---|---|---|
| Acreage | Maximum Number of Employees1 | Maximum Number of Heavy Equipment (On-Site) | Maximum Number of Business Vehicles (On-Site)2 | |
| 1 | Less than 10 acres | 3 | none | 2 |
| 2 | 10 but less than 50 acres | 4 | 2 | 4 |
| 3 | 50 acres or greater | 10 | 5 | 6 |
TABLE NOTES: 1An employee is a person, other than members of the household permanently residing on the premises, who is engaged on-site in the operation of the agricultural processing on a regular or part-time basis. 2A business vehicle may not exceed a rated capacity of 1.5 tons or have more than 2 axles. | ||||
| Table 4.08.12-2. Structures1 | ||
|---|---|---|
| Acreage | Maximum Cumulative Size of Structures | |
| 1 | Up to 5 acres | 2,000 sf |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf |
| 3 | 10 acres or greater | 5,000 sf for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf |
TABLE KEY: sf = square feet TABLE NOTE: 1Maximum Building Height: 35 feet | ||
| Table 4.08.12-2. Structures1 | ||
|---|---|---|
| Acreage | Maximum Cumulative Size of Structures | |
| 1 | Up to 5 acres | 2,000 sf |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf |
| 3 | 10 acres or greater | 5,000 sf for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf |
TABLE KEY: sf = square feet TABLE NOTE: 1Maximum Building Height: 35 feet | ||
| Table 4.08.12-3. Storage Areas | ||
|---|---|---|
| Acreage | Maximum Cumulative Size of Storage Areas1 | |
| 1 | Up to 5 acres | 2,000 sf |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf |
| 3 | 10 acres or greater | 5,000 sf for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf maximum |
TABLE KEY: sf = square feet TABLE NOTE: 1All heavy equipment must be located within a Storage Area. Storage Areas must be screened consistent with the requirements of Section 7.04.05. Outdoor Storage Areas must be enclosed on all sides by a fence that screens the outdoor Storage Area. | ||
| Table 4.08.12-3. Storage Areas | ||
|---|---|---|
| Acreage | Maximum Cumulative Size of Storage Areas1 | |
| 1 | Up to 5 acres | 2,000 sf |
| 2 | Greater than 5 but less than 10 acres | 2,500 sf |
| 3 | 10 acres or greater | 5,000 sf for the initial 10 acres, plus an additional 1,000 sf for each additional 10 acres, not to exceed 15,000 sf maximum |
TABLE KEY: sf = square feet TABLE NOTE: 1All heavy equipment must be located within a Storage Area. Storage Areas must be screened consistent with the requirements of Section 7.04.05. Outdoor Storage Areas must be enclosed on all sides by a fence that screens the outdoor Storage Area. | ||
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025
(ZOAM-2020-0002, 06/12/2024)
Effective on: 3/12/2025