Additional information. A change of zone application calls upon the Commission to exercise a legislative function and to determine that the floating zone applied will be superior to the underlying zoning to achieve the purposes of these Regulations as set forth in Article I. Therefore, it is incumbent on the applicant to provide sufficient information, in both detail and scope, to meet its burden of proof in that regard. Further, it is the obligation of the applicant to provide any additional information which the Commission may request or require in order to make such a determination. Such information may include, but is not limited to: information concerning surrounding land uses, building locations, driveways, streets, topography, water courses and wetlands, utilities, and the like; a traffic impact study prepared by a Connecticut registered professional engineer qualified to prepare such studies; an environmental impact statement prepared by professionals qualified to prepare such studies; detailed architectural information, such as color samples, screening of roof-or ground-mounted heating and air conditioning equipment and ventilation ducts, building illumination, samples of construction materials, and the like; detailed landscaping plans, including the type, size, number and location of material to be planted, the location and construction material of any fences, walls, flag poles, street furniture, walkways, trash disposal areas, and the like; reports from its own consultants and staff, or from government agencies.