(A) Adult entertainment uses.
(1) No adult entertainment use shall be located within 1,000 feet of any other adult entertainment use nor within 600 feet of any of the following uses:
(a) All Class C establishments licensed by the Michigan Liquor Control Commission;
(b) Pool or billiard halls;
(c) Coin-operated amusement centers;
(d) Teenage discos or dance halls;
(e) Ice or roller skating rinks;
(g) Indoor or drive-in movie theaters;
(j) Any public or private school having a curriculum including kindergarten or any 1 or more of the grades, 1 through 12.
(2) Distance in division (A)(1) above shall be measured along the centerline of the street or streets or address between 2 fixed points on the center lines determined by projecting straight lines at right angles from the part of the above listed uses nearest to the contemplated location of the structure containing the adult entertainment use, and from the contemplated location of the structure containing the adult entertainment use nearest to a use listed above.
(3) No adult entertainment use shall be located within 500 feet of any area zoned residential. The required distances shall be measured by a straight line between a point on the boundary line of a zoned residential area nearest to the contemplated structure or contemplated location of the structure containing the adult entertainment use to a point on the contemplated structure or contemplated location of the structure containing the adult entertainment use nearest to the boundary lines of a zoned residential area.
(4) All adult entertainment uses shall be contained in a freestanding building. Enclosed malls, commercial strip stores, common wall structures, and multi-uses within the same structure do not constitute a freestanding building.
(5) No adult use shall be conducted in any manner that permits the observation of any material depicting, describing, or relating to "specified sexual activities" or "specified anatomical areas" from any public way or from any property not regulated as an adult entertainment use. This provision shall apply to any display, decoration, sign, show window, or other opening.
(AA) Commercial solar energy systems (SES) (commonly known as a solar farm). To promote the use of solar energy within the township as a clean alternative energy source and to provide for the land development, installation and construction regulations for commercial SES facilities subject to reasonable condition that will protect the public health, safety and welfare. The regulations established herein are minimum requirements and standards for the placement, construction and modification of commercial SES facilities, while promoting a renewable energy source for our community in a safe, effective and efficient manner.
(1) Escrow and fee. An escrow account in the form of a cash deposit of not less than $15,000 or such other amount estimated by the Township Board, shall be set up when the applicant applies for a special use permit. The deposit shall be sufficient to cover all reasonable costs and expenses associated with the special land use zoning review and approval process, which costs can include, but are not limited to, fees of the Township Attorney, Township Planner, and Township Engineer, as well as any reports or studies which the township anticipates it may have done related to the zoning review process for the particular application. Such escrow amount shall include regularly established fees. At any point during the zoning review process, the township may require that the applicant place additional monies into the township escrow should the existing escrow amount filed by the applicant prove insufficient. If the escrow account needs replenishing and the applicant refuses to do so within 14 days after receiving notice, the zoning review and approval process shall cease until and unless the applicant makes the required escrow deposit. Any escrow amounts which are in excess of actual costs shall be returned to the applicant within 90 days of permitting process completion. The township may hire qualified professionals for each and any of the technical fields associated with the special use permit, such as, but not limited to, engineering, electrical, environmental, economic, wildlife, health, and land use.
(2) Applicant identification.
(a) Applicant name and address in full, a statement that the applicant is the owner involved or is acting on the owner’s behalf, and any additional contact information as necessary.
(b) Each application for a solar energy system shall also be dated to indicate the date the application is submitted to Montrose Township.
(c) The applicant, operator, and/or owner is required to place an identification placard on site of the SES with their company name, address, a contact name, and a contact phone number for the life of the project.
(3) Commercial solar energy systems shall be limited and subject to obtaining a special land use permit from the Planning Commission in AG, RF, C-2, I-1, and I-2 zoning districts.
(4) Freestanding or ground-mounted solar energy systems shall be restricted to a height of 14 feet at maximum tilt.
(5) All solar energy systems shall have the following setbacks. See Diagram 1 for divisions (a) through (c) below. Setback distances shall be from the adjacent lot line or road right-of-way line to the proposed perimeter fencing around the solar energy system.
(a) Front yard and/or road right-of-way: 200 feet;
1. 500 feet from the closest side and rear walls of a dwelling unit on an adjoining property.
2. No solar energy system shall be placed between the closest point of a dwelling unit and the road right-of-way line on the same lot as the dwelling unit and the adjacent lots extending the width of the setback area defined above in division (5)(d), see Diagram 2.
(e) Internal property lines: A SES is not subject to property line setback requirements for common property lines of two or more participating parcels, except road right-of-way setbacks shall apply.
(6) (a) Commercial solar energy systems are not subject to any maximum lot coverage restrictions, however any other regulated structures located on the parcel are subject to the maximum lot coverage restrictions for the zoning district in which it is located.
(b) Additional site plan requirements. The applicant shall submit a site plan in full compliance with §§ 153.230 through 153.236 of this zoning ordinance for each solar energy system and other solar energy appurtenances. Additional requirements for a solar energy system site plan are as follows:
1. The project area boundaries.
2. The location, height, and dimensions of all proposed structures and fencing.
3. The location, grades, and dimensions of all temporary and permanent on-site and access roads from the nearest county- or state-maintained road.
5. Water bodies, waterways, wetlands, drainage channels, and drain easements.
6. A site grading, erosion control and storm water drainage plan. The plans will be reviewed by the township’s engineering firm at the applicant’s cost.
7. Proposed setbacks to all existing structures adjacent to the solar energy system.
8. All new infrastructure, both above and below ground, related to the project. This includes inverters and batteries.
9. Identification and site plan of a construction/set-up/laydown area.
10. Landscape/screening plan detailing all proposed changes to the landscape of the site, including temporary or permanent roads or driveways, grading, vegetation clearing, and planting.
(7) Signage and security.
(a) A security fence shall be placed around the perimeter of a commercial solar energy system and the electrical equipment shall be locked. The fence shall be located between the solar array and the landscaping buffer. The fence shall meet the minimum requirements of the National Electrical Code requirements. If deemed appropriate, the Planning Commission can require specific fencing as needed. Knox boxes and keys shall be located at locked entrances, not on the fence for emergency personnel access.
(b) The manufacturers or installer’s identification and appropriate warning sign shall be posted on or near the panels in a clearly visible manner; furthermore, an information sign shall be posted and maintained at the entrance(s), which shall list the name and phone number of the operator.
(c) No portion of the solar energy system shall contain or be used to display advertising. The manufacturers’ name and equipment information or dedication of ownership shall be allowed on any equipment of the solar energy system.
(8) Noise. Commercial solar energy system facilities shall not exceed 40 dBA Leq (1-hour) measured at the project boundary. As part of the application, and prior to installation, the applicant shall provide noise modeling study and analysis that will demonstrate the solar energy system will not exceed the maximum permitted noise levels. Site plans shall include modeled sound isolines extending from the sound source to the property line to demonstrate compliance with this standard. Post-construction, the applicant and/or owner will conduct sound monitoring to ensure the project complies with the zoning ordinance standards.
(a) Land clearing of natural vegetation shall be limited to that which is necessary for the construction, operation, and maintenance of the solar energy system per practices of best management of natural areas or good husbandry of the land or forest other prescribed by applicable laws, regulations, and bylaws.
(b) Landscaping shall consist of a minimum 20-foot-wide, vegetated greenbelt around the entire perimeter of the facility. Such greenbelt shall be adjacent to and outside of any perimeter fencing associated with the facility. Landscaping within the greenbelt shall consist of 70% evergreen trees and 30% deciduous trees of a minimum of 6 feet in height at the time of planting. All plantings shall be native species. All trees shall be planted a minimum of 10 feet on center and have a minimum projected height of 20 feet. Existing vegetation within the greenbelt may be used as a substitute for the required plantings, upon approval of the Planning Commission. A landscape berm, a minimum of 3 feet high to assist in screening may be required. The requirement of providing a berm will be recommended and approved by the Planning Commission.
(c) Each owner/operator of a solar energy system shall utilize good husbandry techniques with respect to said vegetation, including but not limited to, proper pruning, proper fertilizer, and proper mulching, so that the vegetation will reach maturity as soon as practical and will have maximum density in foliage. Dead or diseased vegetation shall be removed and must be replanted at the next appropriate planting time. Plants or grasses not part of landscaping shall be maintained by the facility operator not to exceed 12 inches in height.
(d) Applicant must provide a detailed landscape maintenance plan for the proposed solar energy system and surrounding area. The plan shall include a ground cover and vegetation establishment and management plan and include provisions that will be employed to maintain and promote native vegetation while minimizing the proliferation of weeds during and following construction.
(e) The Planning Commission may alter the landscaping requirement depending upon the location of existing plant material on site.
(10) Local, state and federal permits. Solar energy system facilities shall be required to obtain all applicable federal, state, and local laws, regulations, and ordinances including compliance with the following:
(a) Farmland and Open Space Preservation Program (Part 361 of the Natural Resources and Environmental Protection Act, Public Act 451 of 1994 as amended, more commonly known as PA 116), and with applicable parts of the Michigan Natural Resources and Environmental Protection Act (Act 451 of 1994, M.C.L.A. § 324.101 et seq.) including but not limited to Part 31 Water Resources Protection (M.C.L.A. § 324.3101 et seq.), Part 91 Soil Erosion and Sedimentation Control (M.C.L.A. § 324.9101 et seq.), Part 301 Inland Lakes and Streams (M.C.L.A. § 324.30101 et seq.), and Part 303 Wetlands (M.C.L.A. § 324.30301 et seq.).
(b) The applicant shall be responsible for making repairs to any public roads, drains and infrastructure damaged by the construction or operation of the solar energy system. The applicant/owner will be required to enter into a road use agreement and/or drain use agreement with the County Road Commission or Drain Commission for post-construction repairs, if required by these agencies.
(c) Copies of all such permits and approvals that have been obtained or applied for at the time of the application.
(11) Electrical interconnections. All electrical interconnection or distribution lines shall comply with all applicable codes and standard commercial large-scale utility requirements. Use of above-ground transmission lines shall be prohibited within the site, unless waived by the Planning Commission during its review and approval of the project.
(12) Additional special land use criteria. The following additional topics shall be included in a review of a site plan and special use permit application for a commercial SES facility in addition to the general standards listed in § 153.218:
(a) Project description and rationale. Provide a general description of the proposal including:
1. A legal description and parcel identification numbers of the of the property of properties on which the project will be located.
2. Location and height of all proposed above-ground structures and utilities associated with the SES, including horizontal- and vertical-scaled drawings with dimensions that show the location of the of the proposed SES facility.
3. A description of the proposed technology to include the type of solar panels and system, number of panels, angles of orientation, rated power output, performance, safety, and the name and address of the of the manufacturer and model.
4. Identify the anticipated construction schedule, project life, development phases, likely markets for the generated energy, and possible future expansions;
(b) Analysis of onsite traffic and a plan that identifies the routes intended for use in connection with the development, construction, operation, and maintenance of the SES;
(c) Estimated construction jobs, estimated permanent jobs associated with the development;
(d) Review and demonstrate the visual impact of the proposed project from a minimum of 5 viewpoints at the time of commercial operation, projected after 5 years and 10 years post- construction. The visual simulations shall use photos or renditions of the project with consideration given to tree plantings and setback requirements;
(e) Review and demonstrate any potential impact on wildlife on the site;
(f) Identify any impact on the water quality and water supply in the area, any storm water discharge concerns from the property, and any dust concerns generated from project activities during construction and for the life of the project;
(g) Identify any solid waste or hazardous waste generated by the project.
(a) Provide lighting plans showing all lighting within the facility. No light may adversely affect adjacent parcels. All lighting must be shielded from adjoining parcels, and light poles are restricted to 18 feet in height.
(b) All solar energy systems shall be placed such that solar glare does not project onto nearby inhabited structures or roadways and be considered a nuisance.
(c) Solar facilities should be sited and designed properly to eliminate glint and glare effects on roadway users, nearby residences, commercial areas, or other highly sensitive viewing locations, or to reduce them to the lowest achievable levels. The applicant will provide a glint and glare study which accurately assesses and quantifies potential glint and glare effects and to determine the potential health, safety, and visual impacts associated with proposed project.
(d) The design and construction of solar energy facilities shall not produce light emissions, either direct or indirect (reflective), that would interfere with airline pilot vision and/or traffic control operations.
(e) If the design of the project produces light or glare on neighboring homes or businesses, the owner shall mitigate that glare by curtailment.
(14) Provide site access plan during construction and operation phases. Show proposed project service road ingress and egress access onto primary and secondary routes, layout of the plant service road system. Due to infrequent access to such facilities after construction is completed, it is not required to pave or curb access drives. It will be necessary to pave any driveway and parking lots used for occupied offices that are located on site.
(15) Identify emergency and normal shutdown procedures. Identify potential hazards to adjacent properties, public roadways, and to the community in general that may be created.
(16) Identify any electromagnetic fields and communications interference generated by the project.
(17) Maintenance plan. The applicant shall submit a maintenance plan that describes the following:
(a) Explains routine maintenance to solar panels and facility.
(b) Demonstrates the SES will be designed, constructed, and operated to minimize dust generation, including the provision of sufficient watering of excavated or graded soil during construction to prevent excessive dust.
(c) States the manner in which unpaved access roads will be treated and maintained, either with a dust palliative or graveled or treated by another approved dust control method to prevent excessive dust.
(d) Provisions that will be employed to maintain and promote native vegetation while minimizing the proliferation of weeds during and following construction. A record of mowing and the height of vegetation/grass following each cutting shall be recorded in the maintenance log described below.
(e) If a SES is not maintained in operational and reasonable condition or poses a potential safety hazard, the owner shall take expeditious action to correct the situation, including SES removal, as necessary.
(f) The owner shall keep a maintenance log on each SES and must provide a complete log to the township annually within 30 days of request.
(18) Insurance. Proof of the applicant’s public liability insurance with a rated carrier of at least $3,000,000 per occurrence to cover the solar energy system, the township, and the landowner. Applicant shall provide yearly proof of insurance to township that confirms active coverage for the applicant and township.
(a) The solar energy system owner or operator shall provide a copy of the project summary, electrical schematic, and as-built site plan to the local fire chief. The owner or operator shall cooperate with local emergency services in developing an emergency response plan. All means of shutting down the solar photovoltaic installation shall be clearly marked.
(b) The owner or operator shall identify a responsible person for public inquiries throughout the life of the installation.
(20) Complaint resolution.
(a) The applicant shall develop a process to resolve complaints from nearby residents concerning the construction or operation of the project. All complaints shall be acknowledged within 10 days of receipt of such complaint and the township supervisor shall also be notified of each complaint. The process may use an independent mediator or arbitrator and shall include a time limit for acting on a complaint. The process shall not preclude the local government from acting on a complaint.
(b) During construction, the applicant shall maintain and make available to nearby residents a telephone number where a project representative can be reached during normal business hours.
(c) A report of all complaints and resolutions to complaints shall be filed with the township on a quarterly basis.
(a) Prior to a change in the ownership or operation of a large solar energy system the current owner or operator shall provide written notice to the township at least 30 days prior to that change becoming effective. This notice shall inform the township of the intended transfer of control of the large solar energy system and shall include a copy of the instrument or agreement effecting that transfer. Such an instrument or agreement shall include an express statement that the new owner or operator of the large solar energy system shall not be permitted to operate that system until compliance with the terms of this division (AA).
(b) Upon transfer or sale, the financial security for decommissioning shall be maintained at all times, the estimated costs of decommissioning shall be resubmitted, and the security adjusted to account for the new estimate.
(22) Abandonment and decommissioning.
1. For the life of the project, the owner/operator will provide quarterly updates on current operations and energy production to the Township Board or their designee on the status of the solar energy system.
2. A solar energy system that ceases to produce energy on a continuous basis for 6 months will be considered abandoned, unless the current responsible party (or parties) with ownership interest in the solar energy system provides substantial evidence prior to the 6-month expiration period that they intend to maintain and reinstate the operation of the facility. If the responsible party does not provide an update on the solar energy project until after the 6-month time limit of no energy production, the responsible party shall pay a fine according to the fee schedule set by the Township Board and provide a letter with satisfactory explanation and request for reinstatement of the project to the Township Board. Should the above provisions not be adhered to the project will be considered abandoned. It shall be the responsibility of the responsible party (or parties) to remove all equipment and facilities and completely restore the project area to its condition prior to the development of the solar energy system.
a. Upon determination of abandonment, the Building Official shall notify the party (or parties) responsible that they must remove the solar energy system and restore the site to its condition prior to development of the solar energy system within 1 year of notice by the Township Board or its designee.
b. If the responsible party (or parties) fails to comply, the Township Board or its designee may remove the solar energy system, sell any removed materials, and initiate judicial proceedings or take any other steps legally authorized against the responsible parties to recover the costs required to remove the solar energy system and restore the site to a nonhazardous pre- development condition.
(b) Decommissioning. A decommissioning plan signed by the party responsible for decommissioning and the landowner addressing the following shall be submitted prior to the issuance of the zoning permit, which shall include:
1. The anticipated life of the project;
2. The estimated decommissioning costs in current dollars (salvage costs cannot be considered in the estimated decommissioning costs). The estimate shall be prepared by the engineer for the developer and shall be approved by the township;
3. The method of ensuring that funds will be available for decommissioning and restoration, to include but not limited to:
a. Complete removal of all non-utility owned equipment, conduit, structures, fencing, roads, solar panels and foundations; and
b. Complete restoration of property to condition prior to development of the solar energy system;
4. The anticipated manner in which the project will be decommissioned and the site restored:
a. Decommissioning shall include the removal of each PV panel, all electrical components, and all facilities associated with the solar energy system.
b. All access roads to the solar energy system shall be removed, cleared, and graded by the facility owner, unless the property owner requests, in writing, a desire to maintain the access road. The township will not be assumed to take ownership of any access road and such remaining roads will not be considered public roads.
c. The site and any disturbed earth shall be stabilized, graded, and cleared of any debris by the owner of the solar energy system or its assigns. If the site is not to be used for agricultural purposes following removal, the site shall be seeded to prevent soil erosion, and restored to its condition existing prior to any construction activities;
5. A provision to give notice to the township 1 year in advance of decommissioning;
6. A financial instrument to assure payment of the cost of decommissioning shall be required. To ensure proper removal of the structure when it ceases to be used for a period of 6 months or more, any application for a new solar energy system shall include a description of the financial security guaranteeing removal of the solar energy system which will be posted at the time of receiving a zoning permit for the facility. The security shall be a: 1) cash; 2) irrevocable bank letter of credit; or 3) performance bond in a form approved by the township. The amount of such guarantee shall be no less than the estimated cost of removal and shall include a provision for inflationary cost adjustments every 5 years;
7. A condition of the financial instrument shall be notification by the company to the Township Supervisor 30 days prior to its expiration or termination. When determining the amount of such required security, the township shall also require future meetings every 5 years, to establish corrected values for decommissioning. The financial security instrument shall be adjusted to each determined corrected value;
8. Decommissioning shall be complete, and the ground shall be restored to its previous condition, within 1 year from the date of abandonment; which may be extended by 1 additional year by the Building Official.
(23) Repowering. If at the end of the lease period, or the useful life of the SES, the applicant/owner decides to retrofit or repower the installation by reconfiguring, renovating, or replacing the existing components:
(a) The applicant/owner shall provide the Planning Commission a proposal to change the project. It shall be considered a new application, subject to the ordinance standards at the time of the request.
(b) The applicant/owner would not need to apply for a new permit if they are performing routine maintenance, as described in the provided maintenance plan.
(24) Continuing compliance and enforcement escrow deposit. A continuing escrow deposit shall be held by the township and shall be funded by a cash deposit by the applicant prior to the commencement of construction of any solar energy facility and shall be maintained by the owner or operator until the solar energy facility has been permanently decommissioned and removed. The monetary amount placed by the applicant in escrow with the township shall be a minimum of $20,000 and shall cover all reasonable costs and expenses associated with continuing enforcement of this division (AA) and the terms of the special use permit, which costs can include, but are not limited to, reasonable fees for the Township Attorney, Township Planner and Township Engineer, as well as costs for any reports or studies that the township determines are reasonably related to enforcement of the division (AA) and the special use permit. If the township is required to expend any portion of the escrow deposit or if the existing escrow amount paid by the applicant proves to be insufficient to cover the township’s enforcement costs, the township may require the applicant to place additional monies into escrow with the township.
(AB) Wind energy conversion systems (WECS).
(1) Procedure. The Planning Commission review of a special land use permit for a WECS is a 2-step process. The first step is the public hearing and decision by the Planning Commission, per the procedures for review in §§ 153.215 through this 153.219. The second step, which may occur at a separate meeting, is the site plan review process as described in §§ 153.230 through 153.236.
(2) Special land use. All WECS are allowed as a special land use in the AG, RF, C-2, I-1, and I-2 zoning districts.
(3) Escrow and fee. An escrow account in the form of a cash deposit of not less than $15,000, or such other amount estimated by the Township Board, shall be set up when the applicant applies for a special use permit. The deposit shall be sufficient to cover all reasonable costs and expenses associated with the special land use zoning review and approval process, which costs can include, but are not limited to, fees of the Township Attorney, Township Planner, and Township Engineer, as well as any reports or studies which the township anticipates it may have done related to the zoning review process for the particular application. Such escrow amount shall include regularly established fees. At any point during the zoning review process, the township may require that the applicant place additional monies into the township escrow should the existing escrow amount filed by the applicant prove insufficient. If the escrow account needs replenishing and the applicant refuses to do so within 14 days after receiving notice, the zoning review and approval process shall cease until and unless the applicant makes the required escrow deposit. Any escrow amounts which are in excess of actual costs shall be returned to the applicant within 90 days of permitting process completion. The township may hire qualified professionals for each and any of the technical fields associated with the special use permit, such as, but not limited to engineering, electrical, environmental, economic, wildlife, health, and land use.
(4) Applicant identification. Company contact information including telephone numbers and e-mail addresses, name of the company, name of the project, key company contacts with titles, employer identification number (EIN).
(5) Project description. A general description of the proposed project including a legal description and map of the property or properties on which the project would be located and an anticipated construction schedule.
(6) Project map. A map showing all participating properties and non-participating properties within the project boundary.
(7) Site plans. The project site plans shall include maps showing the physical features and land uses in the project area. In addition to the requirements of § 153.233, the site plan shall include:
(a) The project area boundaries, including lot lines and dimensions.
(b) Names and parcel identification numbers of each parcel within the WECS.
(c) The location, height, and dimensions of all existing and proposed structures and fencing.
(d) The location, grades, and dimensions of all temporary and permanent on-site access roads including width and surface material from the nearest county or state-maintained road.
(f) Water bodies, waterways, wetlands, and drainage channels.
(g) All new infrastructure related to the project.
(a) Inhabited structure. The distance between a wind turbine and an inhabited structure shall be at least 3.0 times the tip height.
(b) Non-participating parcel. The distance between a wind turbine and the property lines of adjacent non-participating parcels shall be at least 1.5 times the tip height of the wind turbine.
(c) Road right-of-way and railroad setback. The distance between a wind turbine and the underlying road right-of-way shall be at least 1.5 times the tip height of the wind turbine.
(d) Public utility setback. The distance between a wind turbine and an active public utility corridor, such as overhead communication lines, shall be at least 1.5 times the tip height.
(e) SCADA (supervisory control and data acquisition) or meteorological (MET) towers shall be setback 1.5 times the tip height of the SCADA or MET tower.
(f) An operations and maintenance office building, a sub-station, or ancillary equipment shall comply with any property setback requirement that may be applicable to that type of building or equipment.
(g) Public waterways. All WECS shall be set back at least 1 mile from all public bodies of water regulated under Part 301, excluding legally established county drains.
(h) Tip height. The maximum height of a wind turbine shall be 499 feet.
(9) Engineering data. The safety of the design of all WECS towers shall be certified by a professional engineer registered in the state. A copy of the manufacturer’s installation instructions, standard for certification, and blueprints shall be provided to the Building Official prior to the issuance of a building permit. Included as part of or as an attachment to the installation instructions shall be standard drawings, including base and footing details, along with engineering data and calculations to demonstrate compliance with the structural design provisions of the Building Code.
(10) Certifications. Certification that the applicant has complied or will comply with all applicable state and federal laws and regulations. Copies of all such permits and approvals that have been obtained or applied for at the time of the application.
(a) WECS including towers shall comply with all applicable state construction and electrical codes and local building permit requirements.
(b) The applicant shall comply with applicable parts of the Michigan Natural Resources and Environmental Protection Act (Act 451 of 1994, M.C.L.A. § 324.101 et seq.) including but not limited to Part 31 Water Resources Protection (M.C.L.A. § 324.3101 et seq.), Part 91 Soil Erosion and Sedimentation Control (M.C.L.A § 324.9101 et seq.), Part 301 Inland Lakes and Streams (M.C.L.A. § 324.30101 et seq.), Part 303 Wetlands (M.C.L.A. § 324.30301 et seq.), Part 323 Shoreland Protection and Management (M.C.L.A. § 324.32301 et seq.), Part 325 Great Lakes Submerged Lands (M.C.L.A. § 324.32501 et seq.), and Part 353 Sand Dunes Protection and Management (M.C.L.A. § 324.35301 et seq.).
(11) Environmental impact. The applicant shall have a third-party, qualified professional conduct an analysis to identify and assess any potential impacts on the natural environment including, but not limited to wetlands and other fragile ecosystems, historical and cultural sites, and antiquities. The applicant shall take appropriate measures to minimize, eliminate or mitigate adverse impacts identified in the analysis. The applicant shall identify and evaluate the significance of any net effects or concerns that will remain after mitigation efforts and provide a copy of the report to the township.
(a) The applicant shall have a third-party, qualified professional conduct an analysis to identify and assess any potential impacts on wildlife and endangered species. The applicant shall take appropriate measures to minimize, eliminate or mitigate adverse impacts identified in the analysis. The applicant shall identify and evaluate the significance of any net effects or concerns that will remain after mitigation efforts and provide a copy of the report to the township.
(b) Sites requiring special scrutiny include wildlife refuges, other areas where birds are highly concentrated, bat hibernacula, wooded ridge tops that attract wildlife, sites that are frequented by federally and/or state-listed endangered species of birds and bats, significant bird-migration pathways, and areas that have landscape features known to attract large numbers of raptors. At a minimum, the analysis shall include a thorough review of existing information regarding species and potential habitats in the vicinity of the project area. Where appropriate, surveys for bats, raptors, and general avian use should be conducted. The analysis shall include the potential effects on species listed under the federal Endangered Species Act and Michigan’s Endangered Species Protection Law.
(c) The analysis shall indicate whether a post-construction wildlife mortality study will be conducted and, if not, the reasons why such a study does not need to be conducted. Power lines should be placed underground, when feasible, to prevent avian collisions and electrocutions. All above-ground lines, transformers, or conductors should comply with the Avian Power Line Interaction Committee (APLIC)-published standards to prevent avian mortality.
(d) The applicant should consider painting a single blade black to reduce avian and wildlife mortality and address this solution in their application.
(a) WECS projects shall use tubular towers and all WECS in a project shall be finished in a non-reflective matte-finished color.
(b) A project shall be constructed using wind turbines of similar design, size, operation, and appearance throughout the project.
(c) No lettering, company insignia, advertising, or graphics shall be on any part of the tower, hub, or blades. Nacelles may have lettering that exhibits the manufacturer’s and/or owner’s identification.
(14) Safety and security.
(a) All WECS shall be designed to prevent unauthorized access to electrical and mechanical components and shall have access doors that are kept securely locked at all times when service personnel are not present.
(b) All spent lubricants and cooling fluids shall be properly and safely removed in a timely manner from the site of the wind energy system.
(c) A sign shall be posted near each tower and operations and maintenance office building that will contain emergency contact information.
(d) Signage placed at the road access shall be used to warn visitors about the potential danger of falling ice.
(e) The minimum vertical blade tip clearance from grade shall be 75 feet for a turbine employing a horizontal axis rotor.
(f) All WECS must be equipped with manual and automatic over-speed controls to limit the blade speed to the engineered design limits of the installation.
(g) The applicant shall work with local emergency services for coordination and training on the WECS.
(a) The minimum FAA lighting standards shall not be exceeded. All tower lighting required by the FAA shall be shielded to the maximum extent possible to reduce glare and visibility from the ground. The tower shaft shall not be illuminated unless required by the FAA.
(b) WECS including towers shall comply with Federal Aviation Administration requirements, the Michigan Airport Zoning Act (Public Act 23 of 1950, M.C.L.A. § 259.431 et seq.), the Michigan Tall Structures Act (Public Act 259 of 1959, M.C.L.A. § 259.481 et seq.), and local jurisdiction airport overlay zone regulations. WECS shall comply with applicable utility, Michigan Public Service Commission, and Federal Energy Regulatory Commission interconnection standards.
(c) A lighting plan must be submitted by the applicant. Such plans must describe all lighting that will be utilized for a proposed project. Such a plan shall include the planned number and location of lights, light color, and whether any lights will be flashing. As part of the lighting plan, applicants must submit the detailed plans to install an aircraft detection lighting system (ADLS) that manages the proposed wind energy facility’s lighting to reduce illumination when unnecessary unless an applicant demonstrates that an applicable local, state, or federal entity prohibits the use of an ADLS on a particular project. All WECS must be equipped with an ADLS to minimize lighting unless prohibited by a governing entity.
(a) The sound pressure level generated by a WECS shall be Leq 40 dB(A) measured at a non-participating inhabited structure and be Leq 45 dB(A) non-participating parcel line. This sound pressure level may be exceeded during short-term events such as utility outages and/or severe wind storms. If the ambient sound pressure level exceeds 40 dB(A), the standard shall be ambient dB(A) plus 5 dB(A).
(b) As part of the application and prior to installation, the applicant shall provide modeling and analysis that will confirm that the WECS will not exceed the maximum permitted sound pressure levels.
(c) Modeling and analysis shall conform to IEC 61400 and ISO 9613.
(d) After installation of the WECS, sound pressure level measurements shall be done by a third-party, qualified professional according to the procedures in the most current version of ANSI S12.18. All sound pressure levels shall be measured with a sound meter that meets or exceeds the most current version of ANSI S1.4.
(e) Documentation of the sound pressure level measurements shall be provided to the local government within 60 days after construction is completed on the WECS.
(a) The applicant shall conduct an analysis of potential shadow flicker created by each proposed wind turbine at all inhabitable structures. Such analysis shall be documented in a shadow flicker modeling report.
(b) The analysis shall identify the locations of shadow flicker created by each proposed wind turbine and the expected durations of the flicker at these locations from sunrise to sunset over the course of a year.
(c) Site plans shall depict a contour around each proposed wind turbine that represents the predicted 30 hours per year of shadow flicker generated by the modeling software used in the report. For participating parcels, shadow flicker shall not exceed 30 hours per year. For non-participating parcels, there shall not be any shadow flicker on non-participating dwellings.
(d) The analysis shall identify all areas where shadow flicker may affect the occupants of the inhabitable structures and describe measures that shall be taken to eliminate or mitigate the problems. A shadow flicker mitigation plan shall also be submitted with the shadow flicker modeling report. Any shadow flicker complaint shall be addressed by the applicant and be mitigated.
(18) Electromagnetic interference.
(a) No WECS shall be installed in any location where its proximity to existing fixed broadcast, retransmission, or reception antennae for radio, television, or wireless phone or other personal communication systems would produce electromagnetic interference with signal transmission or reception unless the applicant provides a replacement signal to the affected party that will restore reception to at least the level present before operation of the wind energy system.
(b) No WECS shall be installed in any location within the line of sight of an existing microwave communications link where the operation of the wind energy system is likely to produce electromagnetic interference in the link’s operation unless the interference is insignificant.
(19) Road Commission and Drain Commission.
(a) Transportation plan. A description of the routes used by construction and delivery vehicles and of any road improvements that will be necessary to accommodate construction vehicles and equipment deliveries.
1. The applicant shall be responsible for making repairs to any public roads damaged by the construction of the WECS.
2. In addition, the applicant shall submit to Montrose Township and a copy of the agreement or bond agreed upon with the County Road Commission and MDOT, as applicable, which guarantees the repair of damage to public roads and other areas caused by construction of the WECS.
(b) 1. Where utility-grid wind energy system construction cuts through a private or public drain tile field, the drain tile must be repaired and reconnected or other remedial measures performed to properly drain the site to the satisfaction of the landowner if a private drain, or if a public drain, the Genesee County Drain Commission and Montrose Township.
2. In addition, the applicant shall submit to Montrose Township and a copy of the agreement or bond agreed upon with the County Drain Commission which guarantees the repair of damage caused by construction of the WECS.
(20) Operations and maintenance. Description of the operations of the WECS including regular and unscheduled maintenance.
(21) Complaint resolution.
(a) The applicant shall develop a process to resolve complaints from nearby residents concerning the construction or operation of the project. All complaints shall be acknowledged within 10 business days of receipt of such complaint and the township supervisors shall also be notified of each complaint. The process may use an independent mediator or arbitrator and shall include a time limit for acting on a complaint. The process shall not preclude the local government from acting on a complaint.
(b) During construction and for the life of the project, the applicant, owner, or operator shall maintain and make available to nearby residents a telephone number where a project representative can be reached during normal business hours.
(c) A report of all complaints and resolutions shall be filed with the Building Official or assigned designee on a quarterly basis.
(a) Prior to a change in the ownership or operation of a WECS the current owner or operator shall provide written notice to the township at least 30 days prior to that change becoming effective. This notice shall inform the township of the intended transfer of control of the WECS and shall include a copy of the instrument or agreement affecting that transfer. Such an instrument or agreement shall include an express statement that the new owner or operator of the WECS shall not be permitted to operate that system until compliance with the terms of this division (AB).
(b) Upon transfer or sale, the financial security for decommissioning shall be maintained at all times, the estimated costs of decommissioning shall be resubmitted, and the security adjusted to account for the new estimate.
(23) As-built drawings. Within 12 months of project completion, the applicant shall submit as-built site plan drawings of the constructed WECS. The applicant should submit a hard copy of the drawing set and electronic file formats including Adobe PDF, GIS, and CAD files. The information in the drawings should include location data (x,y coordinates) of site features, inclusive of turbines, access roads, junction boxes, underground collection lines, above-ground transmission lines, and borings underneath roads and drains.
(24) Abandonment and decommissioning.
1. a. For the life of the project, the owner/operator will provide quarterly updates on current operations and energy production to the Township Board or their designee on the status of the WECS.
b. A WECS that ceases to produce energy on a continuous basis for 6 months will be considered abandoned unless the current responsible party (or parties) with an ownership interest in the WECS provides substantial evidence prior to the 6-month expiration period that they intend to maintain and reinstate the operation of the facility. If the responsible party does not provide an update on the WECS until after the 6-month time limit of no energy production, the responsible party shall pay a fine according to the fee schedule set by the Township Board and provide a letter with satisfactory explanation and request for reinstatement of the project to the Township Board. Should the above provisions not be adhered to the project will be considered abandoned. It shall be the responsibility of the responsible party (or parties) to remove all equipment and facilities and completely restore the project area to its condition prior to the development of the WECS.
2. Upon determination of abandonment, the Building Official shall notify the party (or parties) responsible that they must remove the wind energy system and restore the site to its condition prior to development within 6 months of notice by the Planning Commission or its designee.
3. If the responsible party (or parties) fails to comply, the Planning Commission or its designee may remove the wind energy system, sell any removed materials, and initiate judicial proceedings or take any other steps legally authorized against the responsible parties to recover the costs required to remove the wireless communication facility and restore the site to a nonhazardous predevelopment condition.
(b) Decommissioning plan.
1. The applicant shall submit a decommissioning plan. The plan shall include:
a. The anticipated life of the project.
b. The estimated decommissioning costs, which does not include salvage value. The estimate shall be prepared by the engineer for the developer and shall be approved by the township.
c. The method of ensuring that funds will be available for decommissioning and restoration.
d. The anticipated manner in which the project will be decommissioned and the site restored.
e. A provision to notice the township 1 year in advance of decommissioning.
f. A clause which requires the applicant, owner, or operator to review the value of the decommissioning bond or surety on a 5-year basis for cost of inflation.
2. At the time of decommissioning the applicant, owner, or operator is required to do the following:
a. The applicant shall be responsible for making repairs to any public roads damaged by the construction of the WECS.
b. Remove all towers and other components of the system.
c. Completely remove all foundations and underground components. Restore all conditions (including topsoil) to the pre-construction condition.
d. Remove all roads and driveways not accepted for use by either the township or the property owner and restore to the pre-construction condition.
e. Restore the site to conditions acceptable to the township and the property owner.
3. Performance bond. At the time of project approval, the applicant shall post a performance bond to insure the decommissioning of the WECS and restoration of the property.
a. The applicant shall post a performance bond, the amount to be determined by the Township Board and legal counsel, to be sufficient to cover the decommissioning of the system.
b. The security shall be a: 1) cash; 2) irrevocable bank letter of credit; or 3) performance bond in a form approved by the township. The amount of such guarantee shall be no less than the estimated cost of removal and shall include a provision for inflationary cost adjustments every 5 years.
c. The security shall be in favor of the township and shall be used in the event the decommissioning plan needs to be enforced with respect to the removal of the system or individual components and restoration of the site.
d. The performance bond shall remain in effect until the system and all components are removed and the site restored.
e. A condition of the financial instrument shall be notification by the company to the Township Supervisor 30 days prior to its expiration or termination. When determining the amount of such required security, the township shall also require future meetings every 5 years, to establish corrected values for decommissioning. The financial security instrument shall be adjusted to each determined corrected value.
(25) Repowering. If at the end of the lease period, or the useful life of the WECS, the applicant/owner decides to retrofit or repower the installation by reconfiguring, renovating, or replacing the existing components:
(a) The applicant/owner shall provide the Planning Commission, a proposal to change the project. It shall be considered a new application, subject to the ordinance standards at the time of the request.
(b) The applicant/owner would not need to apply for a new permit if they are performing routine maintenance, as described in the provided maintenance plan.
(26) Continuing compliance and enforcement escrow deposit. A continuing escrow deposit shall be held by the township and shall be funded by a cash deposit by the applicant prior to the commencement of construction of any wind energy conversion systems and shall be maintained by the owner or operator until the WECS has been permanently decommissioned and removed. The monetary amount placed by the applicant in escrow with the township shall be a minimum of $20,000 and shall cover all reasonable costs and expenses associated with continuing enforcement of this division (AB) and the terms of the special use permit, which costs can include, but are not limited to, reasonable fees for the Township Attorney, Township Planner, and Township Engineer, as well as costs for any reports or studies that the township determines are reasonably related to enforcement of this division (AB) and the special use permit. If the township is required to expend any portion of the escrow deposit or if the existing escrow amount paid by the applicant proves to be insufficient to cover the township’s enforcement costs, the township may require the applicant to place additional monies into escrow with the township.
(B) Adult foster care large group home for 13 to 20 residents.
(1) A state licensed adult foster care large group home shall not be located within 750 feet of another similar state licensed facility.
(2) One on-site parking space shall be provided for each employee in addition to the parking required for the dwelling unit or other accessory uses.
(3) A designated passenger loading/unloading area of adequate dimensions shall be provided near a barrier-free entrance to the facility.
(4) A loading/unloading area of adequate dimensions shall be provided for delivery vehicles servicing the facility.
(5) A landscaped buffer shall be provided along all property lines that abut a less intense land use and around the visible perimeters of all parking and loading/unloading areas.
(6) All exterior lighting of entryways, parking spaces, or loading/unloading areas shall not reflect onto adjacent properties and, preferably, should be motion activated.
(C) Adult foster care small group home for 7 to 12 residents.
(1) A state licensed adult foster care large group home shall not be located within 750 feet of another similar state licensed facility.
(2) One on-site parking space shall be provided for each employee in addition to the parking required for the dwelling unit or other accessory uses.
(3) The property (architecture and landscaping) shall be maintained in a manner that is consistent with the character of the neighborhood.
(D) Automobile service stations (convenience stores with gasoline service).
(1) There shall be a minimum lot area of 10,000 square feet and minimum lot width of 100 feet.
(2) Pump islands shall be a minimum of 15 feet from any public right-of-way or lot line.
(3) The curb cuts for ingress and egress to a service station shall not be permitted at a location that will tend to create traffic hazards in the streets immediately adjacent thereto. Entrances shall be no less than 25 feet from a street intersection (measured from the road right-of-way).
(4) Where adjoining a residentially zoned district or use, a solid fence or wall 6 feet in height shall be erected along any common lot line. The fence or wall shall be continuously maintained in good condition.
(5) Any repair work shall be conducted completely within an enclosed building.
(6) There shall be no storage of vehicle components and parts, trash, supplies, or equipment outside of a building.
(7) In the event that an automobile service station use has been abandoned or terminated for a period of more than 1 year, all underground gasoline storage tanks shall be removed from the premises.
(E) Automobile repair facility (repair garage).
(1) The use shall always be located on a plot of ground having frontage along a public street of not less than 150 feet and having a minimum area of not less than 2 acres.
(2) All repair work must be carried out within an enclosed building.
(3) No automobile repair garage shall be erected within a 200 foot radius of any residential district.
(4) (a) Outdoor storage of junked equipment or parts is prohibited unless the junked equipment or parts is storied adjacent to the principal building in an obscure location that is enclosed with a solid masonry-screening wall.
(b) When screening is provided, the junked equipment or parts shall not be stacked or heaped higher than the height of the screening wall nor exceed 10% of the total yard area, excluding area taken up by structures.
(c) The screening wall shall not be higher than 6 feet.
(5) An automobile repair facility (garage, repair) use shall not include the parking of dismantled, non-licensed, or non-repairable vehicles of any kind, unless ordered by a law-enforcement agency. The storage, sale or rental of new or used cars, motorcycles, mini-bikes or similar vehicles, wrecked or otherwise, shall not be considered a use or accessory use to an automobile repair garage, unless additional approval is granted by the Planning Commission for those uses as an open-air business use.
(6) All temporary outdoor storage of vehicles for repair shall not be located within 50 feet of a public right-of-way or a residential district nor stored for more than 30 days.
(F) Banks, credit unions, savings and loan and other businesses with drive-through facilities.
(1) Only 1 ingress/egress driveway shall be permitted on any single street.
(2) If the use is located on a corner lot, access to the drive-up facility shall be derived only from the street which carries the least amount of traffic at the time the application is approved, except that access from any other street may be shared with an adjoining property.
(3) Sufficient stacking capacity for the drive-through facility shall be provided to ensure that traffic does not extend into the street.
(4) A minimum of 5 stacking spaces (including 1 space at the drive-through facility) per each drive-through facility station shall be provided.
(5) Spaces in addition to the minimum required shall be provided if determined by the Planning Commission to be necessary to ensure that traffic does not extend into the street.
(6) Stacking shall be planned so as to minimize conflicts with entering and exiting traffic, pedestrians, and parking areas.
(G) Bed-and-breakfast inns.
(1) Parking areas shall be located off-street and shall not be located in any required front yard.
(2) No bed-and-breakfast inn shall be located closer than 300 feet to another bed-and-breakfast inn.
(3) Meals or other services provided on the premises shall only be available to residents, employees, and overnight guests in the inn.
(4) The dwelling unit in which the bed and breakfast establishment is located shall be the principal residence of the operator, and the operator shall live on the premises while the establishment is active.
(H) Car washes; automatic or self-service.
(1) Only 1 ingress/egress driveway shall be permitted on any single street.
(2) Where adjoining residentially zoned or used property a solid fence or wall 6 feet in height shall be erected along any common lot line. The fence or wall shall be continuously maintained in good condition.
(3) Sufficient stacking capacity shall be provided to ensure that traffic does not extend into the street.
(4) Self-service car washes shall provide a minimum of 4 stacking spaces (including 1 in the wash stall) per each washing stall.
(5) Automatic washes shall provide a minimum of 15 stacking spaces (including 2 in the washing facility).
(6) Spaces in addition to the minimum required shall be provided if determined by the Planning Commission to be necessary to ensure that traffic does not extend into the street.
(7) Stacking shall be planned so as to minimize conflicts with entering and exiting traffic, pedestrians and parking areas.
(I) Churches, synagogues, and other places of worship.
(1) The site shall be so located as to provide for ingress and egress from the site directly onto a major or secondary thoroughfare.
(2) The principal buildings on the site shall be setback from abutting properties zoned for residential uses not less than 15 feet.
(3) Buildings of greater than the maximum height, may be allowed, provided front, side and rear yards are increased above the minimum requirements by 1 foot for each foot of building that exceeds the maximum height allowed.
(J) Commercial outdoor recreation establishments (excluding golf related uses).
(1) These uses shall include, but need not be limited to, the following: recreational fields, rinks, or courts, (including football, softball, soccer, tennis, basketball, ice skating, and similar activities) archery and shooting ranges, go-cart tracks, music concert pavilions and band shells, amusement parks, and driving ranges open to the general public or operated by a private or non-profit organization.
(2) No building or spectator seating facility shall be located within 100 feet of a property line.
(3) Provisions shall be taken, at the discretion of the Planning Commission, to ensure that excessive dust, noise, traffic, lighting glare, and trespassing are not inflicted on adjacent properties.
(4) Children’s amusement park must be fenced on all sides with a 4-foot wall or fence.
(5) Adequate parking shall be provided off the road right-of-way and shall be fenced with a 4-foot, 6-inch wall or fence where adjacent to the use.
(K) Commercial outdoor storage.
(1) A special land use permit for commercial outdoor storage shall be required whenever stored goods are not owned and/or produced by the owner of the property on which they are stored.
(2) No outdoor storage shall be permitted in the front yard or in any required side yard or required rear yard of buildings for the district in which the commercial outdoor storage use is located.
(3) Where an outdoor storage area is adjacent to a residential zoned district or use, a buffer shall be erected along any common lot line. The fence or wall shall be continuously maintained in good condition.
(L) Duplex (2-family residential structure).
(1) The schedule of regulations applicable to the district where the duplex is located shall apply.
(2) Each unit shall have the minimum square footage required for apartments in the RM District.
(3) A minimum of 2 parking spaces per unit must provided. Required residential off-street parking spaces shall consist of a parking strip, parking bay, driveway, garage, or combination thereof and shall be located on the same lot of the premises they intended to serve.
(M) Family care home, day care centers, nursery schools, and day nurseries.
(1) The structure housing the activity shall comply with all setbacks, required by the zoning district which it is located in.
(2) The structure housing the activity and the landscaping shall be designed and constructed to blend and harmonize with existing residential development in the area.
(3) For each child licensed there shall be provided, equipped and maintained, on the premises, a minimum of 100 square feet of usable outdoor play area (minimum total area of 1,000 square feet per facility).
(4) The outdoor play area shall be suitably fenced and screened by a planted greenbelt from any abutting residential uses.
(5) The facility shall have frontage and direct access to a public road.
(N) Fast-food establishment, carry-out restaurant, drive-in or drive-through restaurant.
(1) A setback of at least 60 feet from the street right-of-way line of any existing or propose public road must be maintained.
(2) Points of vehicular ingress and egress shall be limited to an adjacent paved section line road or shared service drive only and site plans shall be reviewed by the Planning Commission for location and design of curb cuts, service drive, and driveways and for layout of parking lots.
(3) The minimum width of driveways at the property line shall be 24 feet, and not greater than 30 feet.
(4) The minimum distance of any driveway to property line shall be 7 feet.
(5) The minimum distance between driveways on the site shall be 75 feet measured from the 2 closest driveways’ curbs.
(6) The minimum distance a driveway into the site shall be from a street intersection shall be 60 feet measured from the intersection of the street right-of-way to the nearest end of the curb radius.
(7) Concrete curbing, 6 inches in height, shall be properly placed and maintained along or parallel to all property lines, except where bumper guards are required and except across approved driveways, so as to prevent vehicular encroachment onto or over the public right-of-way and to prevent vehicular encroachment onto or over the adjoining property, or vehicular damage to the adjoining buildings.
(8) All outside trash receptacles, except those intended for use by the customer, shall be located within an enclosure constructed of opaque masonry materials 6 feet in height and shall be provided with opaque gates of the same height.
(O) Greenhouses and nurseries.
(1) The parking area shall be buffered a minimum of 4 feet so as not to disrupt abutting residential properties with noise or headlights.
(2) There shall be side yard setbacks of at least 35 feet on either side of the greenhouse.
(3) All loading and parking shall be provided off-street.
(4) The storage or display of any materials shall conform to all building setback requirements of a structure.
(5) The storage of any soil, fertilizer, or other loose, unpackaged materials shall be contained so as to prevent any adverse affects on adjacent uses.
(P) Group day care homes.
(1) A group day care home shall not be located closer than 1,500 feet to any of the following facilities as measured along a street, road, or other public thoroughfare:
(a) Another licensed group day care home;
(b) An adult foster care large group home licensed by the State of Michigan;
(c) A facility offering substance abuse treatment and rehabilitation services to 7 or more people which is licensed by the State of Michigan; or
(d) A community correction center, resident home, halfway house, or other similar facility which houses an inmate population under the jurisdiction of the Department of Corrections.
(2) All outdoor plan areas shall be enclosed by a non-climbable fence that is at least 60 inches high.
(3) The property (landscaping and architecture) shall be maintained in a manner that is consistent with the character of the neighborhood. A group day care home should not require exterior modifications to the dwelling nor should the front yard be the location of play equipment.
(4) One identification sign shall be permitted. The sign face shall not be greater than 2 square feet, shall be mounted flush to a wall, made of a material that is compatible with the dwelling unit, and shall not be illuminated. Sign text shall be limited to the name of the day care operator and an address.
(5) One off-street parking space shall be provided for each non-family employee of the group day care home in addition to the parking normally required for the residence. A driveway may be used to fulfill this requirement.
(6) The hours of operation should not exceed 16 hours during a 24-hour period. The township may limit but not prohibit the operation of a group day-care home between the hours of 10:00 p.m. and 6:00 a.m.
(1) Minimum lot size shall be 10 acres.
(2) The setback from the front property line to the area upon which junk materials are stored shall be not less than 100 feet and shall be provided with a greenbelt buffer. A greenbelt buffer shall also be provided when the junk yard is adjacent to a residential use or district.
(3) Junk yards shall be screened from the roadway and from any adjoining property by an obscuring fence 8 feet in height. The fence shall be kept uniformly painted, neat in appearance, and shall not have any signs or symbols painted on it. A solid masonry wall at least 8 feet in height, shall be required when adjacent to a street or highway or residential or commercial district.
(4) All activities and materials shall be kept within the enclosed area formed by the obscuring fence. Material shall not be stacked or piled above the plane established by the top of the obscuring fence.
(5) All structures, off street parking and fencing and used material storage yards shall be set back not less than 50 feet from any public road right-of-way.
(6) All roads, driveways, and parking lots used by the general public shall be paved, and loading and unloading areas within any junk yard shall be paved, watered or chemically treated so as to limit for adjoining lots and public roads, the nuisance caused by wind-borne dust.
(S) Outdoor sales; new and used automobiles, farm equipment, house trailers and travel trailers.
(1) Ingress and egress to the outdoor sales area shall be at least 60 feet from the intersection of any 2 roads.
(2) An automobile repair facility (garage, repair) shall not be considered an accessory use unless additional approval is granted by the Planning Commission for those uses as an automobile repair facility (garage, repair) use.
(3) The sale of space of new and used automobiles shall comply with all applicable state regulations.
(1) The minimum size of the site devoted to the use shall not be less than 2 acres.
(2) Building separation between self-storage buildings on the same site shall be 15 feet, as measured from side-to-side.
(3) The total lot coverage of all structures shall be limited to 50% of the total lot area.
(4) A barrier shall be provided around the perimeter of the development. The barrier shall be located at the property line. It shall be a minimum of 6 feet in height and shall be constructed of brick, stone, masonry units, wood products, or chain link which are determined by the administrative official to be durable and weather resistant.
(5) A 10 foot landscaped greenbelt shall be provided between the property line and required barrier along all street frontages. A 5-foot landscaped greenbelt shall be provided between the property line and barrier where the site abuts any residential district.
(6) Parking shall be provided in the ratio of 1 space for each 2,000 square feet of gross building area. At a minimum, 2 parking spaces must be assigned to, and located conveniently to, each individual storage building. In addition, 2 spaces for the resident manager, and 1 additional space for each additional employee shall be provided adjacent to the rental office.
(7) Internal driveway aisles shall be a minimum of 24 feet in width.
(8) All off-street parking areas and driveways shall consist of a minimum of 6 inches compacted gravel.
(9) All ingress and egress from this site shall be directly onto a public thoroughfare.
(10) Building height shall not exceed 1 story or 15 feet, except that a caretaker or resident manager’s unit may be allowed a building height of 2 stories or 25 feet.
(11) The use of the premises shall be limited to storage only, and shall not be used for any auction, sales, storage, or the servicing, repair, or fabrication of any vehicle, boat, trailer, or similar item.
(U) Utility and public service buildings.
(1) The area occupied by a like activity shall not include any storage of equipment or parts, nor the stationing of personnel for other than necessary repairs or periodic maintenance of the lot area or buildings.
(2) All operational and moving machinery shall be housed within a building.
(3) All structures shall be located in compliance with all setback and height requirements for residential uses in a district.
(4) The entire perimeter of the lot shall be secured to prevent access to the premises.
(V) Two-family dwellings (duplex).
(1) It is the intent of the township to require 2-family residential dwellings (duplex) to be serviced by municipal sewer and water and developed in accordance with the following standards:
(e) Land area used for computing lot sizes shall exclude the right-of-ways for all roads whether public and private (see § 153.007).
(2) The minimum livable floor area for 2-family residential dwelling units must comply with the standards allowed in the RM Zoning District under §§ 153.200 and 153.201.
(3) The Planning Commission may allow a 2-family residential dwelling (duplex) with an alternate to public sewer and water, (well and septic) only after the approval of the County Health Department has been obtained. In the event that approval is obtained from the Health Department, the minimum lot size shall be increased to that as required by the Health Department for the installation of the well and septic systems.
(4) Driveway access shall be through a common driveway approved by the County Road Commission and or State Highway Department. The maximum with of the common drive shall not exceed 24 feet and shall be hard surfaced.
(5) Accessory structures shall comply with all requirements of § 153.340.
(6) All uniform design standards shall comply with the requirements of § 153.336.
(W) Single-family semi-detached dwellings.
(1) It is the intent of the township to limit single-family semi-detached residential dwellings to platted subdivisions or site condominium projects where constructions of these types of dwelling units are compatible within the development and be serviced by municipal sewer and water and developed in accordance with the following standards:
(b) Maximum Building Height: Stories 2.5
(c) Maximum lot coverage: 30%
(d) Minimum yard setbacks:
Front - Section Line Road 50 feet
Front - Non-Section Line Road 30 feet
(e) Land area used for computing lot sizes shall exclude the rights-of-way for all roads whether public and private (See § 153.007).
(2) The minimum livable floor area for singe-family semi-detached dwelling units shall not be less than 1,200 square feet.
(3) Accessory structures shall comply with all requirements of § 153.340.
(4) The Planning Commission may allow a single-family semi-detached dwelling with an alternate to public sewer and water, (well and septic) only after the approval of the County Health Department has been obtained. In the event that approval is obtained from the Health Department, the minimum lot size shall be increased to that as required by the Health Department for the installation of the well and septic systems.
(5) All uniform design standards shall comply with the requirements of § 153.336.
(X) Flag lots permitted. Flag lots may be permitted as a special land use in any zoning district in compliance with this chapter and provided that they conform to the requirements of this section.
(1) A flag lot can only be created to serve 1 building structure.
(2) A flag lot must contain 33 feet of road frontage to serve as ingress and egress to a public road. The 33-foot access right-of-way must be part of and included in the legal description of the flag lot (see flag lot illustration, § 153.007).
(3) All flag lots created shall comply with the district regulations for the district in which it is located. The access right-of-way serving a flag lot, wetlands, floodplain areas and easements serving underground drains and utilities, shall be excluded when calculating the requirements for compliance with §§ 153.200 and 153.201.
(4) Flag lots must comply with the Land Division Act and may not exceed the 4 to 1 width to depth ratio unless said lot exceeds 10 acres.
(5) A flag lot may not be created where it would reduce an existing side or rear yard setback of an adjoining lot to less than 50 feet.
(6) Driveways located within an access right-of-way shall maintain a minimum setback of 5 feet from property lines.
(7) The placement of all structures on a flag lot shall be so arraigned so that it shall not be a detriment or nuisance to adjoining properties. The Planning Commission may require buffering along adjoining property lines to provide adequate separation between buildings.
(8) Flag lots containing an access drive within the right-of-way of 200 feet or more in length from a public road shall provide a maneuvering turn around area within 50 feet of the principal structure. The turn around maneuvering area shall be at least 24 feet by 50 feet in size and shall be at least 10 feet in width. The access drive, with a minimum width of 10 feet, shall be constructed of asphalt, concrete, stone, or other material demonstrating a weight bearing capacity for public safety vehicles.
(Y) Animal shelters. Animal shelters, located in an AG -Agricultural and or a RF Residential Farms zoning district shall be reviewed and approved under the regulations for home occupations. Animal shelters, located in a non-residential structure in a C-2, General Commercial and or an I-1, Light Industrial zoning district are not subject to obtaining an annual zoning compliance permit.
(1) Animal shelters located in an AG - Agricultural or a RF - Residential Farms zoning district shall meet and comply with the same standards as required for kennels listed under division (Z) below.
(2) Animal shelters located in a C2 - General Commercial or an I-1 - Light Industrial zoning district shall comply with the general requirements of the district as listed in §§ 153.200 and 153.201, footnotes, however all kennel buildings, structures, and related runs/or exercise areas shall be located not less than 250 feet from all adjacent residential dwelling units.
(3) The Planning Commission during its review and approval may increase the required setbacks if it is determined that the increase setback is necessary to protect adjacent properties from the nuisances caused by noise, odors or other off-site impacts. The Planning Commission may also establish limitation regarding hours of operation, number and types of animals housed, the extent of accessory operations including veterinary services provided on site and other operational characteristic of the use to ensure that the facility is consistent with the character of the surrounding area.
(Z) Kennels, dog - commercial and private. Commercial and private kennels may be permitted as a special land use and reviewed under the requirements for a home occupation in zoning districts AG - Agricultural, and RF - Residential Farm. Commercial kennels may be permitted as a special land use, not subject to the requirements for a home occupation in a C-2 General Commercial zoning district and as a permitted land use in an I-1 - Light Industrial zoning district. All commercial and private kennels must comply with the following requirements:
(1) All kennels shall operate in conformance with all applicable county and state regulations.
(2) The minimum lot size for commercial kennels shall be 10 acres, with 250 feet of road frontage. The minimum lot size for private kennels shall be 5 acres, with 250 feet of road frontage. The Planning Commission may modify the lot size and road frontage requirements for kennels based on the specific characteristic of the use being requested.
(3) Kennel buildings, structures, and related runs/or exercise areas shall not be located in front of the main principal structure located on the property and comply with the following setbacks:
(a) Sides - Not less than 75 feet;
(b) Rear - Not less than 50 feet;
(c) All adjacent residential dwelling units -not less than 250 feet.
(4) Kennels shall comply with the following requirements except where the dogs are housed or kept within the main residential dwelling unit located on the property and a fenced in areas is provided in a rear yard area for use by said household pets.
(a) Kennels shall be structurally sound and shall be maintained in good repair. Floors shall be constructed of non-toxic, easily cleaned water impervious material.
(b) All dogs kept in a kennel shall be provided with an inside sleeping area, which will protect them against inclement weather, preserves the animal's body heat and keeps them dry. These sleeping areas shall also be ventilated in such a manner as will provide fresh air at all times and shall be kept clean and in a sanitary condition. Inside pens or sleeping areas shall be of the following sizes:
1. For dogs weighing not more than 25 pounds, 5 square feet per animal;
2. For dogs weighing more than 25 pounds but not more than 45 pounds, 9 square feet per animal;
3. For dogs weighing over 45 pounds, 16 square feet per animal.
(c) Inside or outside runs shall be provided and shall be not less than 36 inches wide and 10 feet in length.
(d) Feces and other excreta shall be removed as necessary to maintain a safe and sanitary condition. Excreta shall be disposed of in a sanitary manner.
(e) All dogs shall be provided with clean fresh water and sufficient wholesome food. Food and water containers shall be kept clean and sanitized.
(5) In an AG - Agricultural or RF - Residential Farm zoning district there shall be no change in the outside appearance of the structure or premises, or other visible evidence of the conduct of such kennel other than 1 sign not exceeding 2 square feet in area, non-illuminated and ground mounted with a setback of 5 feet from the front right-of-way line.
(6) In a C-2, General Commercial or I-1, Light Industrial zoning district signage for commercial kennels shall comply with requirements found in §§ 153.295 through 153.302, the township's sign regulations.
(7) In an AG - Agricultural or RF - Residential Farm zoning district where an annual zoning compliance/home occupation permit is denied by the Building/Zoning Official, an appeal may be made to the Zoning Board of Appeals.
(Ord. 99, passed 11-18-1996, § 16.05; Am. Ord. 102, passed 7-21-1997; Am. Ord. 114, passed 11-9-1998; Am. Ord. 148, passed 5-16-2006; Am. Ord. 152, passed 1-16-2007; Am. Ord. 155, passed 4-17-2007; Am. Ord. 158, passed 7-17-2007; Am. Ord. 13-200, passed 3-19-2013; Am. Ord. 18-231, passed 12-18-2018; Am. Ord. 21-006-153.006 et seq., passed 10-19-2021; Am. Ord. 23-004, passed 6-13-2023; Am. Ord. 23-005, passed 7-18-2023) Penalty, see § 153.999