SESC Plan. In order to prevent both soil erosion and sedimentation, a soil erosion and sedimentation control plan shall be required as part of an application for development whenever any land located in a stream, stream channel or body of water is disturbed and whenever a development will involve any clearing, grading, transporting, or other form of disturbing land by the removal of earth, including the mining of minerals, sand, and gravel; provided, that any one of the following descriptions applies to said movement of land:
(a)
Excavation, fill, or any combination thereof will exceed 500 cubic yards.
(b)
Fill will exceed three feet in vertical depth at its deepest point as measured from the natural ground surface.
(c)
Excavation will exceed four feet in vertical depth at its deepest point as measured from the natural ground surface.
(d)
Excavation, fill, or any combination thereof will exceed an area of 5,000 square feet.
(e)
Plant and/or tree cover is to be removed from an area exceeding 5,000 square feet on any parcel of land.
(Note: Specifically exempted from the requirement of a soil erosion and sedimentation control plan are agricultural uses.)