IMPACT STATEMENTS
Quantity of Cumulative Proposed Withdrawal | Radius from the Proposed Withdrawal to be Considered | |
|---|---|---|
10,000 to 50,000 GPD | 0.5 miles | |
50,000 to 100,000 GPD | 0.75 miles | |
In excess of 100,000 GPD | 1.00 miles |
Interval Test Well | Not Exceeding Monitor Wells | Minimum Time Period From Pumping Shutdown | |
|---|---|---|---|
1 minute | 5 minutes | from 0 minute to 15 minutes | |
5 minutes | 5 minutes | from 15 minutes to 2 hours | |
1 hour | 1 hour | from 2 hours to 8 hours | |
24 hours | 24 hours | from 0 hour to 7 days | |
1 month | 1 month | monthly until the wells have been integrated into the public water system |
IMPACT STATEMENTS
Quantity of Cumulative Proposed Withdrawal | Radius from the Proposed Withdrawal to be Considered | |
|---|---|---|
10,000 to 50,000 GPD | 0.5 miles | |
50,000 to 100,000 GPD | 0.75 miles | |
In excess of 100,000 GPD | 1.00 miles |
Interval Test Well | Not Exceeding Monitor Wells | Minimum Time Period From Pumping Shutdown | |
|---|---|---|---|
1 minute | 5 minutes | from 0 minute to 15 minutes | |
5 minutes | 5 minutes | from 15 minutes to 2 hours | |
1 hour | 1 hour | from 2 hours to 8 hours | |
24 hours | 24 hours | from 0 hour to 7 days | |
1 month | 1 month | monthly until the wells have been integrated into the public water system |