Large Collection Facilities. Large collection facilities are operations that occupy an area of not less than five hundred (500) square feet but not more than 12,500 square feet, and are located on a separate property appurtenant to a primary use, and will have permanent structures. Large collection facilities are permitted in "M-1" zoned property, subject to a conditional use permit, and the following standards:
1.
Large collection facilities shall be located a minimum of one hundred fifty (150) feet from any property zoned or planned for residential use. If the facility is located within five hundred (500) feet of residential property, it shall not be operated prior to the hours of eight a.m. and after the hour of seven p.m.;
2.
The facility shall be screened from the public right-of-way, within an enclosed structure;
3.
Structure setbacks and landscape requirements shall be those provided for in the "M-1" zone and any other development criteria imposed at the discretion of the Planning Commission to mitigate potential concerns;
4.
All exterior storage of material shall be in sturdy containers that are covered, secured and maintained in good condition. Storage containers for combustible material (i.e., newspaper and plastic) shall be constructed of non-non-flammable material. No storage, excluding truck trailers and enclosed storage containers, will be visible above the height of the masonry wall enclosure;
5.
Any containers providing for after-hours donation of recyclable materials shall be constructed and maintained with durable waterproof and rustproof materials, and have capacity sufficient to accommodate the materials collected, and shall be secure from unauthorized entry or removal of materials. Donation areas will be kept free of litter and any undesirable material, and the containers must be clearly marked to identify the type of material that may be deposited. The facility shall display a notice stating that no material shall be left outside the recycling containers;
6.
The site shall be maintained free of litter and any other materials that cannot be recycled, and must be cleaned of loose debris on a daily basis;
7.
Space shall be provided on site for six vehicles or the anticipated peak customer load, whichever is higher, to circulate and to deposit recyclable materials, except where the Planning Commission determines that allowing overflow traffic is compatible with surrounding businesses and provided for public safety;
8.
One on-site parking space shall be provided for each employee and each commercial vehicle operated by the recycling facility. The parking requirements for employees may be reduced by the Planning Commission when it can be determined that employees are transported to the facility in a company vehicle;
9.
Signs for the facility shall conform with the sign requirements set forth in Chapter 18.37 of the Norco Municipal Code and include the name and phone number of the facility operator and hours of operation;
10.
The large collection facility shall be limited to the collection of 60 cubic yards or 15 tons per operating day. If the operation does not weigh the material received, then the tonnage shall be determined by using a volumetric conversion factor where one cubic yard is equal to 500 pounds.
11.
Power-driven processing is not allowed, unless it is shown that adverse impacts are insignificant or can be mitigated to a level of insignificance.
12.
The operator shall provide a quarterly report to the Director of Public Works identifying the type and amount of materials recycled by the facility during the quarter, which will assist the City in determining the amount of solid waste diverted from its waste stream.