[Amended 8-4-1986 by L.L. No. 7-1986]
Every subdivision plat filed with the Planning Board shall be referred to the Board of Architectural Review within three days after the date on which the same was duly filed, and the Board of Architectural Review shall, within 30 days after said date of filing, report its recommendations thereon, if any, to the Planning Board. In considering any such plat, the Board of Architectural Review may require the proposed developer of the land covered by the plat to submit a plan of proposed building development, including drawings showing the designs of the exterior appearance of all proposed buildings.