Wireless Communications Facilities
Tower-Based WCFs | |||
|---|---|---|---|
WCF out of ROW | WCF in ROW | ||
Height | Tower-based WCFs shall be designed to minimum functional height but not to exceed 100 feet. Applicants must submit documentation justifying the total height, by reference to relevant conditions such as location, topography, nearby structures, network configuration, level of service, etc. Equipment buildings, cabinets and accessory structures shall not exceed 15 feet in height. | Tower-based WCFs shall be designed to minimum functional height, not to exceed 50 feet in nonresidential districts. Applicants must submit documentation justifying the total height, by reference to relevant conditions such as location, topography, nearby structures, network configuration, level of service, etc. | |
Lot size | Only use on lot | Subject to underlying zoning district | Not applicable |
Combined with another use on lot | Subject to underlying zoning district. Area needed to accommodate the WCF and guy wires (if approved), equipment building or cabinets, security fence, and buffer planting must not extend outside the lot. | Not applicable | |
Setbacks | Towers | Set back from property lines at least 100% of the combined height of the wireless support structure and antenna, or the applicable minimum building setback in the underlying zoning district, whichever is greater. | Not applicable |
Equipment buildings/cabinets | Subject to applicable minimum building setback in the underlying zoning district | Not applicable | |
Location | Towers, equipment buildings/cabinets | Shall not be located between front facade of the principal structure and the street the lot fronts on, except for equipment cabinets located underground | Not applicable |
Non-Tower-Based | |||
|---|---|---|---|
WCF out of ROW | WCF in ROW | ||
Height | On building or similar structure | WCF shall not exceed a height of 15 feet above the roof or parapet, whichever is higher, unless the WCF applicant obtains a variance | Not applicable |
On electrical transmission towers, streetlights, utility poles, traffic signals, signs and similar structures | WCF shall not exceed a height of 5 feet above the electrical transmission tower, streetlight, utility pole, traffic signal, sign and similar structure, unless the WCF applicant obtains a variance | WCF located above the surface grade shall be designed at the minimal functional height. Equipment and components shall not be placed so low as to be a hazard to motorist or pedestrian. | |
Setbacks | Mounted antenna | Not applicable | Not applicable |
Equipment buildings/cabinets | WCF equipment buildings/cabinets shall comply with the applicable minimum building setback requirements in the underlying zoning district. | Not applicable | |
Lot size | Subject to applicable minimum lot size in the underlying zoning district | Not applicable | |
Table 8.1 WCF Review Time Frames | |||
|---|---|---|---|
Type of Application | Borough shall notify the applicant in writing of any information that may be required to complete application: | Borough shall approve or deny the application unless a shorter time period is applicable under the Pa. MPC: | |
A | Co-locate small cell on existing structure | Within 10 days after application submitted | Within 60 days of submission of complete application |
B | Co-locate a facility other than a small cell using an existing structure | Within 30 days after application submitted | Within 90 days of submission of complete application |
C | Deploy small cell using a new structure | Within 10 days after application submitted | Within 90 days after submission of a complete application |
D | Eligible facilities requests** (as defined herein) | Within 30 days after the application is submitted | Within 60 days* of submission of a complete application |
E | New tower-based WCFs (not covered by lines A through D above). | Within 30 days after the application is submitted | Within 150 days of submission of a complete application |
NOTES: | |
* | The time period may be tolled by mutual agreement or in cases where the Borough informs the applicant in a timely manner that the application is incomplete. If an application is considered incomplete, the time period begins running again as soon as the applicant makes a supplemental submission, but may be tolled again if the Borough provides written notice to the applicant within 10 days that the application remains incomplete and specifically delineates which of the deficiencies specified in the original notice of incompleteness have not been addressed. |
** | The Borough shall only require the applicant to provide documentation that is reasonably related to determining whether the request is for an eligible facility. |
Wireless Communications Facilities
Tower-Based WCFs | |||
|---|---|---|---|
WCF out of ROW | WCF in ROW | ||
Height | Tower-based WCFs shall be designed to minimum functional height but not to exceed 100 feet. Applicants must submit documentation justifying the total height, by reference to relevant conditions such as location, topography, nearby structures, network configuration, level of service, etc. Equipment buildings, cabinets and accessory structures shall not exceed 15 feet in height. | Tower-based WCFs shall be designed to minimum functional height, not to exceed 50 feet in nonresidential districts. Applicants must submit documentation justifying the total height, by reference to relevant conditions such as location, topography, nearby structures, network configuration, level of service, etc. | |
Lot size | Only use on lot | Subject to underlying zoning district | Not applicable |
Combined with another use on lot | Subject to underlying zoning district. Area needed to accommodate the WCF and guy wires (if approved), equipment building or cabinets, security fence, and buffer planting must not extend outside the lot. | Not applicable | |
Setbacks | Towers | Set back from property lines at least 100% of the combined height of the wireless support structure and antenna, or the applicable minimum building setback in the underlying zoning district, whichever is greater. | Not applicable |
Equipment buildings/cabinets | Subject to applicable minimum building setback in the underlying zoning district | Not applicable | |
Location | Towers, equipment buildings/cabinets | Shall not be located between front facade of the principal structure and the street the lot fronts on, except for equipment cabinets located underground | Not applicable |
Non-Tower-Based | |||
|---|---|---|---|
WCF out of ROW | WCF in ROW | ||
Height | On building or similar structure | WCF shall not exceed a height of 15 feet above the roof or parapet, whichever is higher, unless the WCF applicant obtains a variance | Not applicable |
On electrical transmission towers, streetlights, utility poles, traffic signals, signs and similar structures | WCF shall not exceed a height of 5 feet above the electrical transmission tower, streetlight, utility pole, traffic signal, sign and similar structure, unless the WCF applicant obtains a variance | WCF located above the surface grade shall be designed at the minimal functional height. Equipment and components shall not be placed so low as to be a hazard to motorist or pedestrian. | |
Setbacks | Mounted antenna | Not applicable | Not applicable |
Equipment buildings/cabinets | WCF equipment buildings/cabinets shall comply with the applicable minimum building setback requirements in the underlying zoning district. | Not applicable | |
Lot size | Subject to applicable minimum lot size in the underlying zoning district | Not applicable | |
Table 8.1 WCF Review Time Frames | |||
|---|---|---|---|
Type of Application | Borough shall notify the applicant in writing of any information that may be required to complete application: | Borough shall approve or deny the application unless a shorter time period is applicable under the Pa. MPC: | |
A | Co-locate small cell on existing structure | Within 10 days after application submitted | Within 60 days of submission of complete application |
B | Co-locate a facility other than a small cell using an existing structure | Within 30 days after application submitted | Within 90 days of submission of complete application |
C | Deploy small cell using a new structure | Within 10 days after application submitted | Within 90 days after submission of a complete application |
D | Eligible facilities requests** (as defined herein) | Within 30 days after the application is submitted | Within 60 days* of submission of a complete application |
E | New tower-based WCFs (not covered by lines A through D above). | Within 30 days after the application is submitted | Within 150 days of submission of a complete application |
NOTES: | |
* | The time period may be tolled by mutual agreement or in cases where the Borough informs the applicant in a timely manner that the application is incomplete. If an application is considered incomplete, the time period begins running again as soon as the applicant makes a supplemental submission, but may be tolled again if the Borough provides written notice to the applicant within 10 days that the application remains incomplete and specifically delineates which of the deficiencies specified in the original notice of incompleteness have not been addressed. |
** | The Borough shall only require the applicant to provide documentation that is reasonably related to determining whether the request is for an eligible facility. |