MINIMUM AREA, YARD AND HEIGHT REQUIREMENTS
| Lot Size | |||
|---|---|---|---|
| Zoning District | Area (square feet)/Density |
Square feet
per Family | Lot Width 3 |
| RA-200 | 40,000 | 40,000 | 200 feet |
| R-100 |
15,000 sewer
25,500 septic 2 | 15,000 | 100 feet |
| R-75 |
12,000 sewer
25,500 septic 2 | 12,000 | 75 feet |
| R-60 | 7,200 sewer | 7,200 | 60 feet |
| RMD |
16,000 sewer 25,500
septic 2 | 8,000 | 100 feet |
| RM | 18,000 | 12,000 first family plus 2,500 each additional family - not to exceed 13 units per acre | 100 feet |
| RM-6 | 6 units per acre | N/A | 100 feet |
| RM-8 | 8 units per acre | N/A | 100 feet |
| R-TH | 8 units per acre | N/A | See Section 1302 |
| R-ZT | 6 units per acre | 4,000 | 40 feet |
| RM-10 | 10 units per acre | N/A | 100 feet |
| RM-13 | 13 units per acre | N/A | 100 feet |
| O-I, OBP | No minimum | N/A | N/A |
| C-1, C-2, C-3 | No minimum | N/A | N/A |
| M-1, M-2 | 1 acre | N/A | 100 feet |
1 When developing 3-plex, 4-plex subdivision under RM category, lot size is determined as follows: 18,000 square feet plus 550 square feet per unit.
2 The Gwinnett County Health Department may require larger lots for septic tanks. Approximately 75 percent of Gwinnett County's soils will require a lot size of at least 25,500 square feet.
3 In all districts, stormwater facility lots shall maintain a minimum lot width of 30 feet at the minimum building setback line.
(Ord. No. 2016-02-69, Exh. A, 2-28-2016; Ord. No. 2021-10-220, § 1, 11-16-2021)
|
Zoning
District |
Front Yard
Local Street |
Major
Thoroughfare | Side Yard 1 | Rear Yard 1 | Maximum Height of Stories |
|---|---|---|---|---|---|
| RA-200 | 35 feet from right-of-way | 50 feet from right-of-way | 1 yard 15 feet 2 yards 35 feet | 40 feet | 35 feet |
| R-100 | 35 feet from right-of-way | 50 feet from right-of-way | 1 yard 10 feet 2 yards 25 feet | 40 feet | 35 feet |
| R-75 | 35 feet from right-of-way | 50 feet from right-of-way | 1 yard 10 feet 2 yards 20 feet | 40 feet | 35 feet |
| R-60 | 25 feet from right-of-way | See section 1302A.2(e) | 1 yard 5 feet 2 yards 15 feet | 30 feet or see section 1302A.2(e) | 35 feet |
| R-ZT | 20 feet from right-of-way | See section 1302C(7) | 1 yard 5 feet 2 yards 10 feet | 25 feet or see section 1302C(6) | 35 feet |
| R-TH | See section 1302 | See section 1302 | See section 1302 | See section 1302 | See section 1302 |
| RMD | 35 feet from right-of-way sewer 50 feet from right-of-way septic | 50 feet from right-of-way | 1 yard 15 feet 2 yards 30 feet | 40 feet | 35 feet |
| RM, RM-6, RM-8, RM-10, RM-13 | 50 feet from right-of-way | 50 feet from right-of-way | 20' first two stories plus 4' per each additional story | 40 feet | 40 feet |
| MUD 2 (high-rise buildings) | 10 feet from right-of-way | 10 feet from right-of-way | 0 feet 1 | 0 feet 1 | 25 stories not to exceed 300 feet |
| O-1, OBP | 50 feet from right-of-way | 50 feet from right-of-way | 10 feet | 15' but 40' if abuts residential district 1 | 3 stories not to exceed 35 feet |
| C-1, C-2, C-3 | 50 feet from right-of-way | 50 feet from right-of-way | 10' but 20' if abuts residential district 1 | 15' but 40' if abuts residential district 1 | 3 stories not to exceed 35 feet |
| M-1 | 50 feet from right-of-way | 50 feet from right-of-way | 20' abutting non-residential district; 50' abutting residential district 1 | 15' abutting non-residential district; 40' abutting residential district 1 | Within 100' of Residential District; 40 feet; 101'—150' from Residential District; 55 feet; 151' or more from Residential District; 85 feet |
| M-2 | 50 feet from right-of-way | 50 feet from right-of-way | 20' abutting non-residential district; 50' abutting residential district 1 | 15' abutting non-residential district; 40' abutting residential district 1 | 40 feet |
1 Also see Section 606, Buffer Between Dissimilar Districts.
2 For structures in excess of 5 stories or 60 feet, the setback from any abutting single-family district shall be increased by one foot for every additional one-foot rise in building height, up to a maximum of 200 feet.
(Ord. No. 2016-02-69, Exh. A, 2-28-2016; Ord. No. 2021-10-220, § 1, 11-16-2021)
_____
MINIMUM AREA, YARD AND HEIGHT REQUIREMENTS
| Lot Size | |||
|---|---|---|---|
| Zoning District | Area (square feet)/Density |
Square feet
per Family | Lot Width 3 |
| RA-200 | 40,000 | 40,000 | 200 feet |
| R-100 |
15,000 sewer
25,500 septic 2 | 15,000 | 100 feet |
| R-75 |
12,000 sewer
25,500 septic 2 | 12,000 | 75 feet |
| R-60 | 7,200 sewer | 7,200 | 60 feet |
| RMD |
16,000 sewer 25,500
septic 2 | 8,000 | 100 feet |
| RM | 18,000 | 12,000 first family plus 2,500 each additional family - not to exceed 13 units per acre | 100 feet |
| RM-6 | 6 units per acre | N/A | 100 feet |
| RM-8 | 8 units per acre | N/A | 100 feet |
| R-TH | 8 units per acre | N/A | See Section 1302 |
| R-ZT | 6 units per acre | 4,000 | 40 feet |
| RM-10 | 10 units per acre | N/A | 100 feet |
| RM-13 | 13 units per acre | N/A | 100 feet |
| O-I, OBP | No minimum | N/A | N/A |
| C-1, C-2, C-3 | No minimum | N/A | N/A |
| M-1, M-2 | 1 acre | N/A | 100 feet |
1 When developing 3-plex, 4-plex subdivision under RM category, lot size is determined as follows: 18,000 square feet plus 550 square feet per unit.
2 The Gwinnett County Health Department may require larger lots for septic tanks. Approximately 75 percent of Gwinnett County's soils will require a lot size of at least 25,500 square feet.
3 In all districts, stormwater facility lots shall maintain a minimum lot width of 30 feet at the minimum building setback line.
(Ord. No. 2016-02-69, Exh. A, 2-28-2016; Ord. No. 2021-10-220, § 1, 11-16-2021)
|
Zoning
District |
Front Yard
Local Street |
Major
Thoroughfare | Side Yard 1 | Rear Yard 1 | Maximum Height of Stories |
|---|---|---|---|---|---|
| RA-200 | 35 feet from right-of-way | 50 feet from right-of-way | 1 yard 15 feet 2 yards 35 feet | 40 feet | 35 feet |
| R-100 | 35 feet from right-of-way | 50 feet from right-of-way | 1 yard 10 feet 2 yards 25 feet | 40 feet | 35 feet |
| R-75 | 35 feet from right-of-way | 50 feet from right-of-way | 1 yard 10 feet 2 yards 20 feet | 40 feet | 35 feet |
| R-60 | 25 feet from right-of-way | See section 1302A.2(e) | 1 yard 5 feet 2 yards 15 feet | 30 feet or see section 1302A.2(e) | 35 feet |
| R-ZT | 20 feet from right-of-way | See section 1302C(7) | 1 yard 5 feet 2 yards 10 feet | 25 feet or see section 1302C(6) | 35 feet |
| R-TH | See section 1302 | See section 1302 | See section 1302 | See section 1302 | See section 1302 |
| RMD | 35 feet from right-of-way sewer 50 feet from right-of-way septic | 50 feet from right-of-way | 1 yard 15 feet 2 yards 30 feet | 40 feet | 35 feet |
| RM, RM-6, RM-8, RM-10, RM-13 | 50 feet from right-of-way | 50 feet from right-of-way | 20' first two stories plus 4' per each additional story | 40 feet | 40 feet |
| MUD 2 (high-rise buildings) | 10 feet from right-of-way | 10 feet from right-of-way | 0 feet 1 | 0 feet 1 | 25 stories not to exceed 300 feet |
| O-1, OBP | 50 feet from right-of-way | 50 feet from right-of-way | 10 feet | 15' but 40' if abuts residential district 1 | 3 stories not to exceed 35 feet |
| C-1, C-2, C-3 | 50 feet from right-of-way | 50 feet from right-of-way | 10' but 20' if abuts residential district 1 | 15' but 40' if abuts residential district 1 | 3 stories not to exceed 35 feet |
| M-1 | 50 feet from right-of-way | 50 feet from right-of-way | 20' abutting non-residential district; 50' abutting residential district 1 | 15' abutting non-residential district; 40' abutting residential district 1 | Within 100' of Residential District; 40 feet; 101'—150' from Residential District; 55 feet; 151' or more from Residential District; 85 feet |
| M-2 | 50 feet from right-of-way | 50 feet from right-of-way | 20' abutting non-residential district; 50' abutting residential district 1 | 15' abutting non-residential district; 40' abutting residential district 1 | 40 feet |
1 Also see Section 606, Buffer Between Dissimilar Districts.
2 For structures in excess of 5 stories or 60 feet, the setback from any abutting single-family district shall be increased by one foot for every additional one-foot rise in building height, up to a maximum of 200 feet.
(Ord. No. 2016-02-69, Exh. A, 2-28-2016; Ord. No. 2021-10-220, § 1, 11-16-2021)
_____
