Wireless Communications Facilities
Table 480-130(1) Permitted Zoning Districts | ||
|---|---|---|
WCF Type | Permitted Zoning District | Permitted by Right, Conditional Use (CU), or Special Exception |
Tower-based WCF located in the right-of-way (ROW) | CB, NC, I | By right |
Residential zoning districts | CU | |
Tower-based WCF where the tower is 40 feet or less in height, located out of ROW | CB, NC, I Municipally owned property in all zoning districts | By right |
Tower-based WCF where the tower is more than 40 feet in height, located out of the ROW | CB, NC, I | By right |
Church, school, public or semi-public or other institutional lots or properties in residential zoning districts | CU | |
WCF on existing structures | All districts | By right |
Eligible facilities request | ||
Table 480-130(2) Prohibited Zoning Districts | |
|---|---|
WCF Type | Prohibited Zone |
Tower-based WCF located out of the ROW | Residential lots or properties within residential zoning districts |
Tower-based WCF located in the ROW | Residential zoning districts where all public service utilities are primarily located underground within 100 feet of the proposed tower or base station |
Table 480-131 Bulk and Area Requirements | |||
|---|---|---|---|
WCF out of ROW | WCF in ROW | ||
Height | Tower-based WCFs shall be designed to minimum functional height. Applicants must submit documentation justifying the total height | Tower-based WCFs shall be designed to minimum functional height, not to exceed 40 feet in residential zoning districts and 60 feet in CB, NC or I Zoning Districts. Applicants must submit documentation justifying the total height | |
Lot size | Only use on lot or property: | Subject to underlying zoning district | Not applicable |
Combined with another use on lot or property: | Area needed to accommodate the WCF and guy wires, accessory equipment, and if required, security fence and landscaping and screening | ||
Setbacks | Towers: | Setback from property line, not lease lines, at least 100% to 110% of the combined height of the wireless support structure and antennas, or the applicable minimum setback in the underlying zoning district, whichever is greater | Not applicable |
Equipment buildings/cabinets: | Subject to applicable minimum accessory use or structure setback in the underlying zoning district | ||
Table 480-135 WCF Review Timeframes | ||
|---|---|---|
The City shall notify the applicant in writing of information that may be required to complete application | The City shall approve or deny the application unless a shorter time period is applicable under the PA MPC[1] | |
New tower-based WCFs | Within 30 calendar days of the date the application was filed with the City | Within 150 days of submission of the complete application for a WCF |
Non-tower WCFs | Within 30 calendar days of the date the application was filed with the City | Within 90 days of submission of a complete application for a WCF |
Small WCF (requiring new wireless support structure) | Within 10 calendar days of the date the application was filed with the City | Within 90 days of submission of a complete application for a WCF |
Small WCF (collocated) | Within 10 calendar days of the date the application was filed with the City | Within 60 days of submission of a complete application for a WCF |
Eligible facilities requests | Within 30 days of the date the application was filed with the City | Within 60 days of submission of a complete application for a WCF |