As used in this article, the following terms shall have the meanings indicated:
CHARGING LEVELThe amount of voltage provided to charge an electric vehicle varies depending on the type of EVSE as follows:
A. Level 1 operates on a fifteen- to twenty-amp breaker on a 120-volt AC circuit.
B. Level 2 operates on a forty- to 100-amp breaker on a 208- or 240-volt AC circuit.
C. Direct-current fast charger (DCFC) operates on a sixty-amp or higher breaker on a 480-volt or higher three-phase circuit with special grounding equipment. DCFC stations can also be referred to as rapid charging stations that are typically characterized by industrial grade electrical outlets that allow for faster recharging of electric vehicles.
MAKE-READY PARKING SPACEThe pre-wiring of electrical infrastructure at a parking space, or set of parking spaces, to facilitate easy and cost-efficient future installation of electric vehicle supply equipment or electric vehicle service equipment, including, but not limited to, Level Two EVSE and direct-current fast chargers. Make-ready includes expenses related to service panels, junction boxes, conduit, wiring, and other components necessary to make a particular location able to accommodate electric vehicle supply equipment or electric vehicle service equipment on a "plug and play" basis. "Make-ready" is synonymous with the term "charger ready," as used in P.L. 2019, c. 362 (N.J.S.A. 48:25-1 et seq.).
PRIVATE EVSEEVSE that has restricted access to specific users (e.g., single- and two-family homes, executive parking fleet parking with no access to the general public).
PUBLICLY ACCESSIBLE EVSEEVSE that is publicly available (e.g., park and ride, public parking lots and garages, on-street parking, shopping center parking, nonreserved parking in multifamily parking lots, etc.).