Zoneomics Logo
search icon

Posen City Zoning Code

CHAPTER 7

"G" DISTRICTS

Industries Engaged in

ALL uses of flammable materials shall meet the requirements of the State Department of Public Safety.
   (H)   Performance Standards; Glare and Heat: In the "G" Industrial District any operation producing intense glare or heat shall be performed in such manner as not to create a public nuisance or hazard along lot lines. Exposed sources of light shall be controlled so as not to cause in a Residence District illuminations in excess of 0.1 foot candle.
   (I)   Performance Standards; Certification: Each application for an Industrial Use, in addition to the requirements set forth, shall be accompanied by a certification from a registered Professional Engineer in the State stating that the intended use will comply with all of the performance standards. The Superintendent of Buildings then has fifteen (15) days in which to approve or disapprove the application, during which time he may consult with appropriate experts to determine compliance with the performance standards.
   (J)   Height of Buildings: No building shall exceed forty feet (40') or three (3) stories in height; provided, that chimneys, stacks, penthouses and water tanks may extend to a height of seventy feet (70'). (1965 Code)
   (K)   Building Line Setback: There shall be no building line setback in a "G" zoning district, and, subject to the other applicable provisions of the Village Code, the building may be constructed to the property line. (Ord. 79-17, 11-13-79)
   (L)   Intensity of Use of Lot and Auto Parking Space: Except on section line and half-section line streets, the building area may occupy the entire lot area. Any use or occupancy requiring the loading or unloading of street vehicles shall provide suitable and sufficient space for such operations to be conducted on private property; and in any such use or occupancy off-street parking space for employees' automobiles shall be provided in accordance with Chapter 8 of this Title. (1965 Code; amd. Ord. 79-17, 11-13-1979; Ord. 2023-30, 11-14-2023)