Access Management
Peak-Hour Trips (PHT) at Build-Out | ||||
|---|---|---|---|---|
Road Classification | 0 to 100 PHT (feet) | 101 to 300 PHT (feet) | More Than 300 PHT (feet) | |
Arterial | 330 | 440 | 550 | |
Collector | 220 | 330 | 440 | |
Other | 60% of the minimum frontage requirement | |||
Access Management
Peak-Hour Trips (PHT) at Build-Out | ||||
|---|---|---|---|---|
Road Classification | 0 to 100 PHT (feet) | 101 to 300 PHT (feet) | More Than 300 PHT (feet) | |
Arterial | 330 | 440 | 550 | |
Collector | 220 | 330 | 440 | |
Other | 60% of the minimum frontage requirement | |||