The proposed finished grade of the site, shown to contour intervals not exceeding two feet. Spot elevations must be shown at all critical points, including but not limited to edges of pavement, curb returns, building corners, drainage paths, etc. Included must be directional flow arrows in all flow lines, and all existing drainage structures labeled with size, type and flow line elevation. Also show centerline of water courses and existing drainage easements.