I-1 Light Industrial District 1
As part of the special exception application, and prior to construction, the operator shall establish the ambient or background noise level baseline. The baseline shall be established hourly over a seventy-two-hour period with at least one twenty-four-hour reading on a Saturday or Sunday. A noise consultant/engineer mutually agreed upon by the Township and owner/operator will be responsible for determining the residual background noise level baseline. The operator and Township will mutually agree to the location of the sampling equipment. The operator shall be responsible for all costs associated with the noise consultant/engineer. The results shall be provided to the Township. |
Permitted Increase (dBa) | Duration of Increase (minutes)* |
|---|---|
5 | 15 |
10 | 5 |
15 | 1 |
* | Cumulative minutes during one hour |
The permitted increase shall be calculated using the greater of the performance standards set forth in § 195-74C or the ambient or background noise level established above. The operator shall provide a computer-generated, site-specific, noise-impact model based on the topography, vegetation and structures of the proposed drill site within a 5,000-foot radius from the outer boundary of the proposed oil and gas vertical bore locations. The simulation model shall include both the unabated noise analysis as well as several noise analyses, including the effects of noise abatement plans. |
As part of the special exception application, and prior to construction, the operator shall establish the ambient or background noise level baseline. The baseline shall be established hourly over a seventy-two-hour period with at least one twenty-four-hour reading on a Saturday or Sunday. A noise consultant/engineer mutually agreed upon by the Township and owner/operator will be responsible for determining the residual background noise level baseline. The operator and Township will mutually agree to the location of the sampling equipment. The operator shall be responsible for all costs associated with the noise consultant/engineer. The results shall be provided to the Township. |
Permitted Increase (dBA) | Duration of Increase (minutes)* |
|---|---|
5 | 15 |
10 | 5 |
15 | 1 |
* | Cumulative minutes during one hour. |
The permitted increase shall be calculated using the greater of the performance standards set forth in § 195-74C or the ambient or background noise level established above. The operator shall provide a computer-generated, site-specific, noise-impact model based on the topography, vegetation and structures of the proposed drill site within a 5,000-foot radius from the outer boundary of the proposed oil and gas vertical bore locations. The simulation model shall include both the unabated noise analysis as well as several noise analyses, including the effects of noise abatement plans. |
Use Category | Min. Lot Area (sq. ft.) | Min. Lot Width (ft.) | Min. Front Setback (ft. from ROW) | Min. Side Yard (ft.) | Min. Rear Yard (ft.) | Max. Bldg. Height (ft.) | Max. Lot Coverage |
|---|---|---|---|---|---|---|---|
Research and testing | 20,000 | 75 | 50 | 25 | 25 | 40 | 50% |
Offices | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Public facility [Amended 6-2-2010 by Ord. No. 601] | 5,000 | 60 | 25 | 15 | 15 | 65 | 50% |
Auto sales and service [Amended 12-29-2008 by Ord. No 580] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Supply yard [Amended 6-2-2010 by Ord. No. 601] | 20,000 | 75 | 50 | 25 | 25 | 40 | 50% |
Restaurants | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Public utility buildings | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Essential services | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Ambulance station [Added 9-2-1998 by Ord. No. 387] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Communications antennas that fall under the Pennsylvania Wireless Broadband Collocation Act[3] [Added 2-23–2000 by Ord. No. 421; amended 9-5-2018 by Ord. No. 705] | Subject to the requirements of § 195-81 | ||||||
Fire Station [Added 10-1-2008 by Ord. No 577] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Bank [Added 4-1-2015 by Ord. No. 654] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Mini-storage facility [Added 4-1-2015 by Ord. No. 654] | 32,000 | 100 | 50 | 25 | 25 | 40 | 50% |
Mobile home sales, service and repair [Added 4-1-2015 by Ord. No. 654] | 32,000 | 150 | 50 | 25 | 25 | 40 | 50% |
Motel/hotel [Added 4-1-2015 by Ord. No. 654] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Retail business [Added 4-1-2015 by Ord. No. 654] | 5,000 | 100 | 50 | 15 | 15 | 65 | 50% |
Wholesale business [Added 4-1-2015 by Ord. No. 654] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Microbrewery/microdistillery [Added 6-6-2018 by Ord. No. 698] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Service station [Added 11-6-2019 by Ord. No. 717] | 20,000 | 100 | 50 | 25 | 25 | 65 | 50% |
Shopping center [Added 11-6-2019 by Ord. No. 717] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Commercial parking lot [Added 8-5-2020 by Ord. No. 731] | 32,000 | 100 | 50 | 25 | 25 | 40 | 50% |
Artisan workspace [Added 7-7-2021 by Ord. No. 739] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Coworking space [Added 7-7-2021 by Ord. No. 739] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Makerspace [Added 7-7-2021 by Ord. No. 739] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Contractor's yard [Added 7-7-2021 by Ord. No. 739] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Light manufacturing and fabrication [Added 7-7-2021 by Ord. No. 739] | 20,000 | 75 | 50 | 25 | 25 | 65 | 50% |
Warehouse [Added 7-7-2021 by Ord. No. 739] | 20,000 | 75 | 50 | 25 | 25 | 65 | 50% |
Conditional Use: | |||||||
Communications antennas that do not fall under the Pennsylvania Wireless Broadband Collocation Act[4] and communications towers [Added 9-5-2018 by Ord. No. 705] | Subject to the requirements of § 195-181 | ||||||
Principal solar energy systems [Added 5-6-2020 by Ord. No. 728] | 1 acre | 75 | 30 | 30 | 30 | NA | 30% |
Wholesale [Amended 4-1-2015 by Ord. No. 654] | 20,000 | 75 | 50 | 25 | 25 | 40 | 50% |
Transportation terminal [Amended 12-29-2008 by Ord. No 580; 6-2-2010 by Ord. No. 601] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Blasting [Added 4-2-2003 by Ord. No. 483] | Subject to the requirements of § 195-14N | ||||||
Educational institution, commercial [Added 4-2-2003 by Ord. No. 483; amended 12-29-2008 by Ord. No 580] | 32,000 | 100 | 50 | 25 | 25 | 65 | 50% |
Gas and oil drill site [Added 6-1-2011 by Ord. No. 617] | Subject to the requirements of § 195-14S | ||||||
Natural gas compressor station [Added 6-1-2011 by Ord. No. 617] | Subject to the requirements of § 195-42L | ||||||
Natural gas processing plant [Added 6-1-2011 by Ord. No. 617] | Subject to the requirements of § 195-42M | ||||||
Staging facility [Added 6-1-2011 by Ord. No. 617] | 32,000 | 150 | 50 | 25 | 25 | 40 | 50% |
Oil and gas water storage facility [Added 6-1-2011 by Ord. No. 617] | 20,000 | 75 | 50 | 25 | 25 | 40 | 60% |
I-1 Light Industrial District 1
As part of the special exception application, and prior to construction, the operator shall establish the ambient or background noise level baseline. The baseline shall be established hourly over a seventy-two-hour period with at least one twenty-four-hour reading on a Saturday or Sunday. A noise consultant/engineer mutually agreed upon by the Township and owner/operator will be responsible for determining the residual background noise level baseline. The operator and Township will mutually agree to the location of the sampling equipment. The operator shall be responsible for all costs associated with the noise consultant/engineer. The results shall be provided to the Township. |
Permitted Increase (dBa) | Duration of Increase (minutes)* |
|---|---|
5 | 15 |
10 | 5 |
15 | 1 |
* | Cumulative minutes during one hour |
The permitted increase shall be calculated using the greater of the performance standards set forth in § 195-74C or the ambient or background noise level established above. The operator shall provide a computer-generated, site-specific, noise-impact model based on the topography, vegetation and structures of the proposed drill site within a 5,000-foot radius from the outer boundary of the proposed oil and gas vertical bore locations. The simulation model shall include both the unabated noise analysis as well as several noise analyses, including the effects of noise abatement plans. |
As part of the special exception application, and prior to construction, the operator shall establish the ambient or background noise level baseline. The baseline shall be established hourly over a seventy-two-hour period with at least one twenty-four-hour reading on a Saturday or Sunday. A noise consultant/engineer mutually agreed upon by the Township and owner/operator will be responsible for determining the residual background noise level baseline. The operator and Township will mutually agree to the location of the sampling equipment. The operator shall be responsible for all costs associated with the noise consultant/engineer. The results shall be provided to the Township. |
Permitted Increase (dBA) | Duration of Increase (minutes)* |
|---|---|
5 | 15 |
10 | 5 |
15 | 1 |
* | Cumulative minutes during one hour. |
The permitted increase shall be calculated using the greater of the performance standards set forth in § 195-74C or the ambient or background noise level established above. The operator shall provide a computer-generated, site-specific, noise-impact model based on the topography, vegetation and structures of the proposed drill site within a 5,000-foot radius from the outer boundary of the proposed oil and gas vertical bore locations. The simulation model shall include both the unabated noise analysis as well as several noise analyses, including the effects of noise abatement plans. |
Use Category | Min. Lot Area (sq. ft.) | Min. Lot Width (ft.) | Min. Front Setback (ft. from ROW) | Min. Side Yard (ft.) | Min. Rear Yard (ft.) | Max. Bldg. Height (ft.) | Max. Lot Coverage |
|---|---|---|---|---|---|---|---|
Research and testing | 20,000 | 75 | 50 | 25 | 25 | 40 | 50% |
Offices | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Public facility [Amended 6-2-2010 by Ord. No. 601] | 5,000 | 60 | 25 | 15 | 15 | 65 | 50% |
Auto sales and service [Amended 12-29-2008 by Ord. No 580] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Supply yard [Amended 6-2-2010 by Ord. No. 601] | 20,000 | 75 | 50 | 25 | 25 | 40 | 50% |
Restaurants | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Public utility buildings | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Essential services | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Ambulance station [Added 9-2-1998 by Ord. No. 387] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Communications antennas that fall under the Pennsylvania Wireless Broadband Collocation Act[3] [Added 2-23–2000 by Ord. No. 421; amended 9-5-2018 by Ord. No. 705] | Subject to the requirements of § 195-81 | ||||||
Fire Station [Added 10-1-2008 by Ord. No 577] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Bank [Added 4-1-2015 by Ord. No. 654] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Mini-storage facility [Added 4-1-2015 by Ord. No. 654] | 32,000 | 100 | 50 | 25 | 25 | 40 | 50% |
Mobile home sales, service and repair [Added 4-1-2015 by Ord. No. 654] | 32,000 | 150 | 50 | 25 | 25 | 40 | 50% |
Motel/hotel [Added 4-1-2015 by Ord. No. 654] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Retail business [Added 4-1-2015 by Ord. No. 654] | 5,000 | 100 | 50 | 15 | 15 | 65 | 50% |
Wholesale business [Added 4-1-2015 by Ord. No. 654] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Microbrewery/microdistillery [Added 6-6-2018 by Ord. No. 698] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Service station [Added 11-6-2019 by Ord. No. 717] | 20,000 | 100 | 50 | 25 | 25 | 65 | 50% |
Shopping center [Added 11-6-2019 by Ord. No. 717] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Commercial parking lot [Added 8-5-2020 by Ord. No. 731] | 32,000 | 100 | 50 | 25 | 25 | 40 | 50% |
Artisan workspace [Added 7-7-2021 by Ord. No. 739] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Coworking space [Added 7-7-2021 by Ord. No. 739] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Makerspace [Added 7-7-2021 by Ord. No. 739] | 5,000 | 60 | 25 | 15 | 15 | 40 | 50% |
Contractor's yard [Added 7-7-2021 by Ord. No. 739] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Light manufacturing and fabrication [Added 7-7-2021 by Ord. No. 739] | 20,000 | 75 | 50 | 25 | 25 | 65 | 50% |
Warehouse [Added 7-7-2021 by Ord. No. 739] | 20,000 | 75 | 50 | 25 | 25 | 65 | 50% |
Conditional Use: | |||||||
Communications antennas that do not fall under the Pennsylvania Wireless Broadband Collocation Act[4] and communications towers [Added 9-5-2018 by Ord. No. 705] | Subject to the requirements of § 195-181 | ||||||
Principal solar energy systems [Added 5-6-2020 by Ord. No. 728] | 1 acre | 75 | 30 | 30 | 30 | NA | 30% |
Wholesale [Amended 4-1-2015 by Ord. No. 654] | 20,000 | 75 | 50 | 25 | 25 | 40 | 50% |
Transportation terminal [Amended 12-29-2008 by Ord. No 580; 6-2-2010 by Ord. No. 601] | 32,000 | 150 | 50 | 25 | 25 | 65 | 50% |
Blasting [Added 4-2-2003 by Ord. No. 483] | Subject to the requirements of § 195-14N | ||||||
Educational institution, commercial [Added 4-2-2003 by Ord. No. 483; amended 12-29-2008 by Ord. No 580] | 32,000 | 100 | 50 | 25 | 25 | 65 | 50% |
Gas and oil drill site [Added 6-1-2011 by Ord. No. 617] | Subject to the requirements of § 195-14S | ||||||
Natural gas compressor station [Added 6-1-2011 by Ord. No. 617] | Subject to the requirements of § 195-42L | ||||||
Natural gas processing plant [Added 6-1-2011 by Ord. No. 617] | Subject to the requirements of § 195-42M | ||||||
Staging facility [Added 6-1-2011 by Ord. No. 617] | 32,000 | 150 | 50 | 25 | 25 | 40 | 50% |
Oil and gas water storage facility [Added 6-1-2011 by Ord. No. 617] | 20,000 | 75 | 50 | 25 | 25 | 40 | 60% |