A-1 Agricultural District
As part of the special exception application, and prior to construction, the operator shall establish the ambient or background noise level baseline. The baseline shall be established hourly over a seventy-two-hour period with at least one twenty-four-hour reading on a Saturday or Sunday. A noise consultant/engineer mutually agreed upon by the Township and owner/operator will be responsible for determining the residual background noise level baseline. The operator and Township will mutually agree to the location of the sampling equipment. The operator shall be responsible for all costs associated with the noise consultant/engineer. The results shall be provided to the Township. |
Permitted Increase (dBA) | Duration of Increase (minutes)* |
|---|---|
5 | 15 |
10 | 5 |
15 | 1 |
* | Cumulative minutes during one hour |
The permitted increase shall be calculated using the greater of the performance standards set forth in § 195-74C or the ambient or background noise level established above. The operator shall provide a computer-generated, site-specific, noise-impact model based on the topography, vegetation and structures of the proposed drill site within a 5,000-foot radius from the outer boundary of the proposed oil and gas vertical bore locations. The simulation model shall include both the unabated noise analysis as well as several noise analyses, including the effects of noise abatement plans. |
Use Category | Min. Lot Area | Min. Lot Width (ft.) | Min. Front Setback (ft. from ROW) | Min. Side Yard (ft.) | Min. Rear Yard (ft.) | Max. Bldg. Height (ft.) | Max. Lot Coverage |
|---|---|---|---|---|---|---|---|
Permitted Use: | |||||||
Agriculture [Amended 10-7-1998 by Ord. No. 388] | 5 acres | 150 | 50 | 25 | 25 | NA | NA |
Greenhouse [Amended 9-1-2010 by Ord. No. 606] | 1 acre | 150 | 50 | 25 | 25 | 45 | 40% |
Municipal or neighbor- hood recreation [Added 7-3-2002 by Ord. No. 462; amended 9-1-2010 by Ord. No. 606] | 20,000 square feet | 100 | 50 | 25 | 25 | 45 | NA |
Riding stable [Amended 10-7-1998 by Ord. No. 388; 9-1-2010 by Ord. No. 606] | 5 acres | 150 | 50 | 25 | 25 | 45 | NA |
Single-family dwelling [Amended 9-1-2010 by Ord. No. 606] | 20,000# square feet | 100 | 25 | 15 | 15 | 45 | 40% |
Special animal raising [Amended 9-1-2010 by Ord. No. 606] | 5 acres | 150 | 50 | 25 | 25 | 45 | NA |
Communications antennas that fall under the Pennsylvania Wireless Broadband Collocation Act[1] [Added 2-23-2000 by Ord. No. 421; amended 9-5-2018 by Ord. No. 705] | Subject to the requirements of § 195-81 | ||||||
Chicken coop [Added 1-20-2016 by Ord. No. 667] | 1 acre** | Same as | 75 | 25 | 25 | NA | NA |
Chicken run/pen [Added 1-20-2016 by Ord. No. 667; amended 5-4-2016 by Ord. No. 675] | Standard for principal use shall apply | ||||||
School bus shelter [Added 7-7-2021 by Ord. No. 739] | 10-foot setback for all rights-of-way | ||||||
Home occupation [Added 7-7-2021 by Ord. No. 739] | Standard for single-family dwelling shall apply | ||||||
Conversion apartment [Added 7-7-2021 by Ord. No. 739] | Standard for principal use shall apply | ||||||
Conditional Use: | |||||||
Day-care/family | * | * | * | * | * | * | * |
Funeral home [Amended 9-1-2010 by Ord. No. 606] | 32,000 square feet | 150 | 50 | 25 | 15 | 45 | 35% |
Hospital facility | 3 acres | 200 | 150 | 150 | 150 | 45 | NA |
Ambulance station [Amended 9-8-1998 by Ord. No. 387; 9-1-2010 by Ord. No. 606] | 1 acre | 150 | 50 | 25 | 15 | 45 | 35% |
Agritourism [Added 2-15-2017 by Ord. No. 682] | 5 acres | 150 | 50 | 25 | 25 | NA | NA |
Garden center/ commercial greenhouse [Added 2-15-2017 by Ord. No. 682] | 5 acres | 150 | 50 | 25 | 25 | NA | NA |
Communications antennas that do not fall under the Pennsylvania Wireless Broadband Collocation Act[2] and communications towers | Subject to the requirements of § 195-81 | ||||||
Principal solar energy systems [Added 5-6-2020 by Ord. No. 728[ | 3 acres | 150 | 30 | 30 | 30 | NA | 40% |
Cemetery, mausoleum [Amended 9-1-2010 by Ord. No. 606] | 25 acres | NA | 100 | 100 | 100 | 45 | NA |
Group residential | * | * | * | * | * | * | * |
Mine ventilation shaft [Amended 9-1-2010 by Ord. No. 606] | 1 acre | 50 | 100 | 100 | 100 | 45 | 20% |
Mobile home park | |||||||
Motel | 2 acres | 200 | 50 | 50 | 50 | 45 | 40% |
Strip mining | Subject to requirements of § 195-14K | ||||||
Veterinary clinic [Amended 9-1-2010 by Ord. No. 606] | 1 acre | 150 | 50 | 25 | 25 | 45 | 40% |
Blasting [Added 4-2-2003 by Ord. No. 483] | Subject to the requirements of § 195-14N | ||||||
Church [Added 4-2-2003 by Ord. No. 483; amended 9-1-2010 by Ord. No. 606] | 1 acre | 150 | 50 | 25 | 25 | 45 | 40% |
Public facility [Added 4-2-2003 by Ord. No. 483; amended 6-2-2010 by Ord. No. 601; 9-1-2010 by Ord. No. 606] | 1 acre | 50 | 50 | 25 | 25 | 45 | 40% |
Outdoor recreation [Added 4-7-2004 by Ord. No. 508; amended 9-1-2010 by Ord. No. 606] | 32,000 | 150 | 50 | 30 | 30 | 45 | 75% |
Model home [Added 5-4-2005 by Ord. No. 528] | * | * | * | * | * | * | * |
Gas and oil drill site [Added 6-1-2011 by Ord. No. 617] | Subject to the requirements of § 195-14S | ||||||
Short-term rental/tourist home [Added 7-7-2021 by Ord. No. 739] | Standard for single-family dwelling shall apply | ||||||
NOTES: | |||||||
|---|---|---|---|---|---|---|---|
NA | Not applicable | ||||||
# | With public or private central sewer facilities approved by PADEP. In the absence of central sewer facilities, the required minimum lot area shall be 40,000 square feet for each dwelling unit. | ||||||
* | Standard for principal use shall apply | ||||||
** | No roosters permitted on less than five acres [Added 1-20-2016 by Ord. No. 667] | ||||||
A-1 Agricultural District
As part of the special exception application, and prior to construction, the operator shall establish the ambient or background noise level baseline. The baseline shall be established hourly over a seventy-two-hour period with at least one twenty-four-hour reading on a Saturday or Sunday. A noise consultant/engineer mutually agreed upon by the Township and owner/operator will be responsible for determining the residual background noise level baseline. The operator and Township will mutually agree to the location of the sampling equipment. The operator shall be responsible for all costs associated with the noise consultant/engineer. The results shall be provided to the Township. |
Permitted Increase (dBA) | Duration of Increase (minutes)* |
|---|---|
5 | 15 |
10 | 5 |
15 | 1 |
* | Cumulative minutes during one hour |
The permitted increase shall be calculated using the greater of the performance standards set forth in § 195-74C or the ambient or background noise level established above. The operator shall provide a computer-generated, site-specific, noise-impact model based on the topography, vegetation and structures of the proposed drill site within a 5,000-foot radius from the outer boundary of the proposed oil and gas vertical bore locations. The simulation model shall include both the unabated noise analysis as well as several noise analyses, including the effects of noise abatement plans. |
Use Category | Min. Lot Area | Min. Lot Width (ft.) | Min. Front Setback (ft. from ROW) | Min. Side Yard (ft.) | Min. Rear Yard (ft.) | Max. Bldg. Height (ft.) | Max. Lot Coverage |
|---|---|---|---|---|---|---|---|
Permitted Use: | |||||||
Agriculture [Amended 10-7-1998 by Ord. No. 388] | 5 acres | 150 | 50 | 25 | 25 | NA | NA |
Greenhouse [Amended 9-1-2010 by Ord. No. 606] | 1 acre | 150 | 50 | 25 | 25 | 45 | 40% |
Municipal or neighbor- hood recreation [Added 7-3-2002 by Ord. No. 462; amended 9-1-2010 by Ord. No. 606] | 20,000 square feet | 100 | 50 | 25 | 25 | 45 | NA |
Riding stable [Amended 10-7-1998 by Ord. No. 388; 9-1-2010 by Ord. No. 606] | 5 acres | 150 | 50 | 25 | 25 | 45 | NA |
Single-family dwelling [Amended 9-1-2010 by Ord. No. 606] | 20,000# square feet | 100 | 25 | 15 | 15 | 45 | 40% |
Special animal raising [Amended 9-1-2010 by Ord. No. 606] | 5 acres | 150 | 50 | 25 | 25 | 45 | NA |
Communications antennas that fall under the Pennsylvania Wireless Broadband Collocation Act[1] [Added 2-23-2000 by Ord. No. 421; amended 9-5-2018 by Ord. No. 705] | Subject to the requirements of § 195-81 | ||||||
Chicken coop [Added 1-20-2016 by Ord. No. 667] | 1 acre** | Same as | 75 | 25 | 25 | NA | NA |
Chicken run/pen [Added 1-20-2016 by Ord. No. 667; amended 5-4-2016 by Ord. No. 675] | Standard for principal use shall apply | ||||||
School bus shelter [Added 7-7-2021 by Ord. No. 739] | 10-foot setback for all rights-of-way | ||||||
Home occupation [Added 7-7-2021 by Ord. No. 739] | Standard for single-family dwelling shall apply | ||||||
Conversion apartment [Added 7-7-2021 by Ord. No. 739] | Standard for principal use shall apply | ||||||
Conditional Use: | |||||||
Day-care/family | * | * | * | * | * | * | * |
Funeral home [Amended 9-1-2010 by Ord. No. 606] | 32,000 square feet | 150 | 50 | 25 | 15 | 45 | 35% |
Hospital facility | 3 acres | 200 | 150 | 150 | 150 | 45 | NA |
Ambulance station [Amended 9-8-1998 by Ord. No. 387; 9-1-2010 by Ord. No. 606] | 1 acre | 150 | 50 | 25 | 15 | 45 | 35% |
Agritourism [Added 2-15-2017 by Ord. No. 682] | 5 acres | 150 | 50 | 25 | 25 | NA | NA |
Garden center/ commercial greenhouse [Added 2-15-2017 by Ord. No. 682] | 5 acres | 150 | 50 | 25 | 25 | NA | NA |
Communications antennas that do not fall under the Pennsylvania Wireless Broadband Collocation Act[2] and communications towers | Subject to the requirements of § 195-81 | ||||||
Principal solar energy systems [Added 5-6-2020 by Ord. No. 728[ | 3 acres | 150 | 30 | 30 | 30 | NA | 40% |
Cemetery, mausoleum [Amended 9-1-2010 by Ord. No. 606] | 25 acres | NA | 100 | 100 | 100 | 45 | NA |
Group residential | * | * | * | * | * | * | * |
Mine ventilation shaft [Amended 9-1-2010 by Ord. No. 606] | 1 acre | 50 | 100 | 100 | 100 | 45 | 20% |
Mobile home park | |||||||
Motel | 2 acres | 200 | 50 | 50 | 50 | 45 | 40% |
Strip mining | Subject to requirements of § 195-14K | ||||||
Veterinary clinic [Amended 9-1-2010 by Ord. No. 606] | 1 acre | 150 | 50 | 25 | 25 | 45 | 40% |
Blasting [Added 4-2-2003 by Ord. No. 483] | Subject to the requirements of § 195-14N | ||||||
Church [Added 4-2-2003 by Ord. No. 483; amended 9-1-2010 by Ord. No. 606] | 1 acre | 150 | 50 | 25 | 25 | 45 | 40% |
Public facility [Added 4-2-2003 by Ord. No. 483; amended 6-2-2010 by Ord. No. 601; 9-1-2010 by Ord. No. 606] | 1 acre | 50 | 50 | 25 | 25 | 45 | 40% |
Outdoor recreation [Added 4-7-2004 by Ord. No. 508; amended 9-1-2010 by Ord. No. 606] | 32,000 | 150 | 50 | 30 | 30 | 45 | 75% |
Model home [Added 5-4-2005 by Ord. No. 528] | * | * | * | * | * | * | * |
Gas and oil drill site [Added 6-1-2011 by Ord. No. 617] | Subject to the requirements of § 195-14S | ||||||
Short-term rental/tourist home [Added 7-7-2021 by Ord. No. 739] | Standard for single-family dwelling shall apply | ||||||
NOTES: | |||||||
|---|---|---|---|---|---|---|---|
NA | Not applicable | ||||||
# | With public or private central sewer facilities approved by PADEP. In the absence of central sewer facilities, the required minimum lot area shall be 40,000 square feet for each dwelling unit. | ||||||
* | Standard for principal use shall apply | ||||||
** | No roosters permitted on less than five acres [Added 1-20-2016 by Ord. No. 667] | ||||||