A building or structure used by a nonconforming use shall not be reconstructed, structurally altered, restored or repaired to an extent exceeding 50% of the replacement cost of such building or structure, exclusive of foundations, unless the use of such building or structure is changed to a conforming use, provided that the reconstruction, restoration or repair of a structure partially destroyed shall commence within six months of the date of the partial destruction and is completed within 12 months of the date of destruction.