Applications for design review or site plan review under this chapter must be submitted to the community development department prior to or concurrently with a building permit application, but in no case less than two weeks prior to the meeting of the design review board. Building permits shall not be granted until approval of plans by the design review board or director. All applications shall be accompanied by a filing fee as required in SMC § 17.85.030 and shall include but not be limited to site plans, exterior building elevations, the environmental checklist, if applicable, and other materials as required by the director.
(Ord. 744 § 2, 1995; Ord. 1273 § 1 (Exh. A), 2023)