General Zoning Provisions
NOTE: The exterior facade of the above parking garage is composed of a single color and building material with no variation in roofline or division in massing with building forms, materials or height. The structure generally lacks architectural detail and ornamentation. |
Example of yard delineations in accordance with this chapter. |
NOTE: A complete set of diagrams indicating the locations of front, side and rear yards in a variety of lot configurations is provided in Appendix F at the end of this chapter.[1] |
Bonus Incentive | Certified (40-49 pts.) | Silver (50-59 pts.) | Gold (60 to 79 pts.) | Platinum (80-100 pts.) |
|---|---|---|---|---|
Max. density | N/A | 2.0 units per acre | 4.0 units per acre | 8.0 units per acre |
Max. FAR | N/A | 10% | 15% | 30% |
Max. bldg. height | N/A | N/A | N/A | 1 story/10 feet |
Green Building Component | Standard | Bonus Incentive |
|---|---|---|
Minimum water use reduction derived from baseline calculations and a water balance model in accordance with LEED standards or similar | 50%* | Density: 2.0 units per acre and FAR: 10% |
75%* | Density: 4.0 units per acre and FAR: 15% | |
Minimum energy demand supplied by on-site solar energy system | 50%* | Density: 1.0 unit per acre and FAR: 5% |
75%* | Density: 3.0 units per acre and FAR: 10% | |
100%* | Density: 5.0 units per acre and FAR: 15% | |
Min. on-site land area designated for green stormwater infrastructure (bioretention, rain gardens, etc.) | 25% | Lot coverage: 10% and FAR: 10% |
Minimum green roof coverage of total building coverage | 85% | Density: 3.0 units per acre and FAR: 15% |
Min. cost performance cost index (PCI) below performance cost index target (PCIT) (based on energy cost and greenhouse emissions). | 25%* | Density: 2.0 units per acre and FAR: 10% |
50% | Density: 4.0 units per acre and FAR: 15% |
NOTE: | |
|---|---|
* | Baseline calculations shall be based on the United States Green Building Council's (USGBC) most recent version of LEED standards and requirements. |
General Zoning Provisions
NOTE: The exterior facade of the above parking garage is composed of a single color and building material with no variation in roofline or division in massing with building forms, materials or height. The structure generally lacks architectural detail and ornamentation. |
Example of yard delineations in accordance with this chapter. |
NOTE: A complete set of diagrams indicating the locations of front, side and rear yards in a variety of lot configurations is provided in Appendix F at the end of this chapter.[1] |
Bonus Incentive | Certified (40-49 pts.) | Silver (50-59 pts.) | Gold (60 to 79 pts.) | Platinum (80-100 pts.) |
|---|---|---|---|---|
Max. density | N/A | 2.0 units per acre | 4.0 units per acre | 8.0 units per acre |
Max. FAR | N/A | 10% | 15% | 30% |
Max. bldg. height | N/A | N/A | N/A | 1 story/10 feet |
Green Building Component | Standard | Bonus Incentive |
|---|---|---|
Minimum water use reduction derived from baseline calculations and a water balance model in accordance with LEED standards or similar | 50%* | Density: 2.0 units per acre and FAR: 10% |
75%* | Density: 4.0 units per acre and FAR: 15% | |
Minimum energy demand supplied by on-site solar energy system | 50%* | Density: 1.0 unit per acre and FAR: 5% |
75%* | Density: 3.0 units per acre and FAR: 10% | |
100%* | Density: 5.0 units per acre and FAR: 15% | |
Min. on-site land area designated for green stormwater infrastructure (bioretention, rain gardens, etc.) | 25% | Lot coverage: 10% and FAR: 10% |
Minimum green roof coverage of total building coverage | 85% | Density: 3.0 units per acre and FAR: 15% |
Min. cost performance cost index (PCI) below performance cost index target (PCIT) (based on energy cost and greenhouse emissions). | 25%* | Density: 2.0 units per acre and FAR: 10% |
50% | Density: 4.0 units per acre and FAR: 15% |
NOTE: | |
|---|---|
* | Baseline calculations shall be based on the United States Green Building Council's (USGBC) most recent version of LEED standards and requirements. |