ZONING COMMISSION RULES OF PRACTICE AND PROCEDURE
When a related map amendment is requested, the application shall include:
In the case of a planned unit development (PUD):
Not inconsistent with the Comprehensive Plan, including a racial equity analysis in compliance with the Zoning Commission’s current Racial Equity Tool which is available on the Office of Zoning’s website;
| TABLE Z § 1600 – SCHEDULE OF FILING FEES | ||
|---|---|---|
| CASE TYPE | FEE | MAXIMUM |
| Map amendment by rulemaking | $325 | |
| Text amendment | $325 | |
| Planned unit development (PUD), contested case map amendment, air space development | $650 | |
| Modification to an approved PUD, air space development | $520 | |
| Time extension to the validity of an order for an approved design review or PUD | ||
| $520 | |
| $1,000 | |
| The greater of $1,500 or 10% of the original hearing fee | $5,000 |
| College or university – new or revised campus plan | $6,500 | |
| College or university – review of a building or use w/in an approved plan | $3,250 | |
| Design review | ||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | $ 7/100 sq. ft. | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | $13/100 sq. ft. | |
| Modification with hearing to an approved design review | ||
| Required or Voluntary | The greater of 26% of the original hearing fee or $1,300, whichever is greater | |
| TABLE Z § 1600 – SCHEDULE OF FILING FEES | ||
|---|---|---|
| CASE TYPE | FEE | MAXIMUM |
| Map amendment by rulemaking | $325 | |
| Text amendment | $325 | |
| Planned unit development (PUD), contested case map amendment, air space development | $650 | |
| Modification to an approved PUD, air space development | $520 | |
| Time extension to the validity of an order for an approved design review or PUD | ||
| $520 | |
| $1,000 | |
| The greater of $1,500 or 10% of the original hearing fee | $5,000 |
| College or university – new or revised campus plan | $6,500 | |
| College or university – review of a building or use w/in an approved plan | $3,250 | |
| Design review | ||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | $ 7/100 sq. ft. | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | $13/100 sq. ft. | |
| Modification with hearing to an approved design review | ||
| Required or Voluntary | The greater of 26% of the original hearing fee or $1,300, whichever is greater | |
| TABLE Z § 1600 – SCHEDULE OF FILING FEES | ||
|---|---|---|
| CASE TYPE | FEE | MAXIMUM |
| Map amendment by rulemaking | $325 | |
| Text amendment | $325 | |
| Planned unit development (PUD), contested case map amendment, air space development | $650 | |
| Modification to an approved PUD, air space development | $520 | |
| Time extension to the validity of an order for an approved design review or PUD | ||
| $520 | |
| $1,000 | |
| The greater of $1,500 or 10% of the original hearing fee | $5,000 |
| College or university – new or revised campus plan | $6,500 | |
| College or university – review of a building or use w/in an approved plan | $3,250 | |
| Design review | ||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | $ 7/100 sq. ft. | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | $13/100 sq. ft. | |
| Modification with hearing to an approved design review | ||
| Required or Voluntary | The greater of 26% of the original hearing fee or $1,300, whichever is greater | |
| TABLE Z § 1600 – SCHEDULE OF FILING FEES | ||
|---|---|---|
| CASE TYPE | FEE | MAXIMUM |
| Map amendment by rulemaking | $325 | |
| Text amendment | $325 | |
| Planned unit development (PUD), contested case map amendment, air space development | $650 | |
| Modification to an approved PUD, air space development | $520 | |
| Time extension to the validity of an order for an approved design review or PUD | ||
| $520 | |
| $1,000 | |
| The greater of $1,500 or 10% of the original hearing fee | $5,000 |
| College or university – new or revised campus plan | $6,500 | |
| College or university – review of a building or use w/in an approved plan | $3,250 | |
| Design review | ||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | $ 7/100 sq. ft. | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | $13/100 sq. ft. | |
| Modification with hearing to an approved design review | ||
| Required or Voluntary | The greater of 26% of the original hearing fee or $1,300, whichever is greater | |
| TABLE Z § 1601 – SCHEDULE OF HEARING FEES | |||
|---|---|---|---|
| MAP AMENDMENT | |||
| Case Type | Unit | Fee | Maximum |
| R-1 through R-3 zones | 43,560 sq. ft. or part of that area | $ 650 | $65,000 |
| RF-1, RF-4, RF-5, or RA-1 zones | 43,560 sq. ft. or part of that area | $1,625 | $65,000 |
| RA-2 zones | 43,560 sq. ft. or part of that area | $3,250 | $65,000 |
| RA-3 through RA-5, D-1-R, SEFC-2, SEFC-3, or CG-1 zones | 43,560 sq. ft. or part of that area | $6,500 | $65,000 |
| MU-1, MU-2, MU-10 through MU-14, D-2, SEFC-1, SEFC-4, CG4 through CG-7, and ARTS-4 zones | 10,000 sq. ft. or part of that area | $2,600 | |
| MU-3 through MU-6, NMU-3 through NMU-6, D-4-R, CG-2, ARTS-1, and ARTS-2 zones | 10,000 sq. ft. or part of that area | $1,625 | |
| NHR, MU-7 through MU-9, MU-20, MU-21, MU‑28, MU-30, NC-6, NC-8, NC-12, NC-13, NC-15, D-3 through D-5, D-5-R, D-6, D-6-R, D-7, D-8, CG-3, and ARTS-3 zone | 10,000 sq. ft. or part of that area | $3,250 | |
| Any PDR zone | 20,000 sq. ft. or part of that area | $2,600 | |
| TEXT AMENDMENT | |||
| Each section of this title proposed to be added, deleted, or amended | Per section modified | $ 325 | $ 1,300 |
| PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 7 | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 13 | |
| MODIFICATION TO A PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| Modification to an approved design review, PUD, air space development, or any other action where review of a specific site or building plan was required | 26% of the original hearing fee or $1,300, whichever is greater | ||
| TABLE Z § 1601 – SCHEDULE OF HEARING FEES | |||
|---|---|---|---|
| MAP AMENDMENT | |||
| Case Type | Unit | Fee | Maximum |
| R-1 through R-3 zones | 43,560 sq. ft. or part of that area | $ 650 | $65,000 |
| RF-1, RF-4, RF-5, or RA-1 zones | 43,560 sq. ft. or part of that area | $1,625 | $65,000 |
| RA-2 zones | 43,560 sq. ft. or part of that area | $3,250 | $65,000 |
| RA-3 through RA-5, D-1-R, SEFC-2, SEFC-3, or CG-1 zones | 43,560 sq. ft. or part of that area | $6,500 | $65,000 |
| MU-1, MU-2, MU-10 through MU-14, D-2, SEFC-1, SEFC-4, CG4 through CG-7, and ARTS-4 zones | 10,000 sq. ft. or part of that area | $2,600 | |
| MU-3 through MU-6, NMU-3 through NMU-6, D-4-R, CG-2, ARTS-1, and ARTS-2 zones | 10,000 sq. ft. or part of that area | $1,625 | |
| NHR, MU-7 through MU-9, MU-20, MU-21, MU‑28, MU-30, NC-6, NC-8, NC-12, NC-13, NC-15, D-3 through D-5, D-5-R, D-6, D-6-R, D-7, D-8, CG-3, and ARTS-3 zone | 10,000 sq. ft. or part of that area | $3,250 | |
| Any PDR zone | 20,000 sq. ft. or part of that area | $2,600 | |
| TEXT AMENDMENT | |||
| Each section of this title proposed to be added, deleted, or amended | Per section modified | $ 325 | $ 1,300 |
| PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 7 | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 13 | |
| MODIFICATION TO A PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| Modification to an approved design review, PUD, air space development, or any other action where review of a specific site or building plan was required | 26% of the original hearing fee or $1,300, whichever is greater | ||
| TABLE Z § 1601 – SCHEDULE OF HEARING FEES | |||
|---|---|---|---|
| MAP AMENDMENT | |||
| Case Type | Unit | Fee | Maximum |
| R-1 through R-3 zones | 43,560 sq. ft. or part of that area | $ 650 | $65,000 |
| RF-1, RF-4, RF-5, or RA-1 zones | 43,560 sq. ft. or part of that area | $1,625 | $65,000 |
| RA-2 zones | 43,560 sq. ft. or part of that area | $3,250 | $65,000 |
| RA-3 through RA-5, D-1-R, SEFC-2, SEFC-3, or CG-1 zones | 43,560 sq. ft. or part of that area | $6,500 | $65,000 |
| MU-1, MU-2, MU-10 through MU-14, D-2, SEFC-1, SEFC-4, CG4 through CG-7, and ARTS-4 zones | 10,000 sq. ft. or part of that area | $2,600 | |
| MU-3 through MU-6, NMU-3 through NMU-6, D-4-R, CG-2, ARTS-1, and ARTS-2 zones | 10,000 sq. ft. or part of that area | $1,625 | |
| NHR, MU-7 through MU-9, MU-20, MU-21, MU‑28, MU-30, NC-6, NC-8, NC-12, NC-13, NC-15, D-3 through D-5, D-5-R, D-6, D-6-R, D-7, D-8, CG-3, and ARTS-3 zone | 10,000 sq. ft. or part of that area | $3,250 | |
| Any PDR zone | 20,000 sq. ft. or part of that area | $2,600 | |
| TEXT AMENDMENT | |||
| Each section of this title proposed to be added, deleted, or amended | Per section modified | $ 325 | $ 1,300 |
| PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 7 | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 13 | |
| MODIFICATION TO A PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| Modification to an approved design review, PUD, air space development, or any other action where review of a specific site or building plan was required | 26% of the original hearing fee or $1,300, whichever is greater | ||
| TABLE Z § 1601 – SCHEDULE OF HEARING FEES | |||
|---|---|---|---|
| MAP AMENDMENT | |||
| Case Type | Unit | Fee | Maximum |
| R-1 through R-3 zones | 43,560 sq. ft. or part of that area | $ 650 | $65,000 |
| RF-1, RF-4, RF-5, or RA-1 zones | 43,560 sq. ft. or part of that area | $1,625 | $65,000 |
| RA-2 zones | 43,560 sq. ft. or part of that area | $3,250 | $65,000 |
| RA-3 through RA-5, D-1-R, SEFC-2, SEFC-3, or CG-1 zones | 43,560 sq. ft. or part of that area | $6,500 | $65,000 |
| MU-1, MU-2, MU-10 through MU-14, D-2, SEFC-1, SEFC-4, CG4 through CG-7, and ARTS-4 zones | 10,000 sq. ft. or part of that area | $2,600 | |
| MU-3 through MU-6, NMU-3 through NMU-6, D-4-R, CG-2, ARTS-1, and ARTS-2 zones | 10,000 sq. ft. or part of that area | $1,625 | |
| NHR, MU-7 through MU-9, MU-20, MU-21, MU‑28, MU-30, NC-6, NC-8, NC-12, NC-13, NC-15, D-3 through D-5, D-5-R, D-6, D-6-R, D-7, D-8, CG-3, and ARTS-3 zone | 10,000 sq. ft. or part of that area | $3,250 | |
| Any PDR zone | 20,000 sq. ft. or part of that area | $2,600 | |
| TEXT AMENDMENT | |||
| Each section of this title proposed to be added, deleted, or amended | Per section modified | $ 325 | $ 1,300 |
| PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 7 | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 13 | |
| MODIFICATION TO A PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| Modification to an approved design review, PUD, air space development, or any other action where review of a specific site or building plan was required | 26% of the original hearing fee or $1,300, whichever is greater | ||
ZONING COMMISSION RULES OF PRACTICE AND PROCEDURE
When a related map amendment is requested, the application shall include:
In the case of a planned unit development (PUD):
Not inconsistent with the Comprehensive Plan, including a racial equity analysis in compliance with the Zoning Commission’s current Racial Equity Tool which is available on the Office of Zoning’s website;
| TABLE Z § 1600 – SCHEDULE OF FILING FEES | ||
|---|---|---|
| CASE TYPE | FEE | MAXIMUM |
| Map amendment by rulemaking | $325 | |
| Text amendment | $325 | |
| Planned unit development (PUD), contested case map amendment, air space development | $650 | |
| Modification to an approved PUD, air space development | $520 | |
| Time extension to the validity of an order for an approved design review or PUD | ||
| $520 | |
| $1,000 | |
| The greater of $1,500 or 10% of the original hearing fee | $5,000 |
| College or university – new or revised campus plan | $6,500 | |
| College or university – review of a building or use w/in an approved plan | $3,250 | |
| Design review | ||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | $ 7/100 sq. ft. | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | $13/100 sq. ft. | |
| Modification with hearing to an approved design review | ||
| Required or Voluntary | The greater of 26% of the original hearing fee or $1,300, whichever is greater | |
| TABLE Z § 1600 – SCHEDULE OF FILING FEES | ||
|---|---|---|
| CASE TYPE | FEE | MAXIMUM |
| Map amendment by rulemaking | $325 | |
| Text amendment | $325 | |
| Planned unit development (PUD), contested case map amendment, air space development | $650 | |
| Modification to an approved PUD, air space development | $520 | |
| Time extension to the validity of an order for an approved design review or PUD | ||
| $520 | |
| $1,000 | |
| The greater of $1,500 or 10% of the original hearing fee | $5,000 |
| College or university – new or revised campus plan | $6,500 | |
| College or university – review of a building or use w/in an approved plan | $3,250 | |
| Design review | ||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | $ 7/100 sq. ft. | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | $13/100 sq. ft. | |
| Modification with hearing to an approved design review | ||
| Required or Voluntary | The greater of 26% of the original hearing fee or $1,300, whichever is greater | |
| TABLE Z § 1600 – SCHEDULE OF FILING FEES | ||
|---|---|---|
| CASE TYPE | FEE | MAXIMUM |
| Map amendment by rulemaking | $325 | |
| Text amendment | $325 | |
| Planned unit development (PUD), contested case map amendment, air space development | $650 | |
| Modification to an approved PUD, air space development | $520 | |
| Time extension to the validity of an order for an approved design review or PUD | ||
| $520 | |
| $1,000 | |
| The greater of $1,500 or 10% of the original hearing fee | $5,000 |
| College or university – new or revised campus plan | $6,500 | |
| College or university – review of a building or use w/in an approved plan | $3,250 | |
| Design review | ||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | $ 7/100 sq. ft. | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | $13/100 sq. ft. | |
| Modification with hearing to an approved design review | ||
| Required or Voluntary | The greater of 26% of the original hearing fee or $1,300, whichever is greater | |
| TABLE Z § 1600 – SCHEDULE OF FILING FEES | ||
|---|---|---|
| CASE TYPE | FEE | MAXIMUM |
| Map amendment by rulemaking | $325 | |
| Text amendment | $325 | |
| Planned unit development (PUD), contested case map amendment, air space development | $650 | |
| Modification to an approved PUD, air space development | $520 | |
| Time extension to the validity of an order for an approved design review or PUD | ||
| $520 | |
| $1,000 | |
| The greater of $1,500 or 10% of the original hearing fee | $5,000 |
| College or university – new or revised campus plan | $6,500 | |
| College or university – review of a building or use w/in an approved plan | $3,250 | |
| Design review | ||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | $ 7/100 sq. ft. | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | $13/100 sq. ft. | |
| Modification with hearing to an approved design review | ||
| Required or Voluntary | The greater of 26% of the original hearing fee or $1,300, whichever is greater | |
| TABLE Z § 1601 – SCHEDULE OF HEARING FEES | |||
|---|---|---|---|
| MAP AMENDMENT | |||
| Case Type | Unit | Fee | Maximum |
| R-1 through R-3 zones | 43,560 sq. ft. or part of that area | $ 650 | $65,000 |
| RF-1, RF-4, RF-5, or RA-1 zones | 43,560 sq. ft. or part of that area | $1,625 | $65,000 |
| RA-2 zones | 43,560 sq. ft. or part of that area | $3,250 | $65,000 |
| RA-3 through RA-5, D-1-R, SEFC-2, SEFC-3, or CG-1 zones | 43,560 sq. ft. or part of that area | $6,500 | $65,000 |
| MU-1, MU-2, MU-10 through MU-14, D-2, SEFC-1, SEFC-4, CG4 through CG-7, and ARTS-4 zones | 10,000 sq. ft. or part of that area | $2,600 | |
| MU-3 through MU-6, NMU-3 through NMU-6, D-4-R, CG-2, ARTS-1, and ARTS-2 zones | 10,000 sq. ft. or part of that area | $1,625 | |
| NHR, MU-7 through MU-9, MU-20, MU-21, MU‑28, MU-30, NC-6, NC-8, NC-12, NC-13, NC-15, D-3 through D-5, D-5-R, D-6, D-6-R, D-7, D-8, CG-3, and ARTS-3 zone | 10,000 sq. ft. or part of that area | $3,250 | |
| Any PDR zone | 20,000 sq. ft. or part of that area | $2,600 | |
| TEXT AMENDMENT | |||
| Each section of this title proposed to be added, deleted, or amended | Per section modified | $ 325 | $ 1,300 |
| PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 7 | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 13 | |
| MODIFICATION TO A PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| Modification to an approved design review, PUD, air space development, or any other action where review of a specific site or building plan was required | 26% of the original hearing fee or $1,300, whichever is greater | ||
| TABLE Z § 1601 – SCHEDULE OF HEARING FEES | |||
|---|---|---|---|
| MAP AMENDMENT | |||
| Case Type | Unit | Fee | Maximum |
| R-1 through R-3 zones | 43,560 sq. ft. or part of that area | $ 650 | $65,000 |
| RF-1, RF-4, RF-5, or RA-1 zones | 43,560 sq. ft. or part of that area | $1,625 | $65,000 |
| RA-2 zones | 43,560 sq. ft. or part of that area | $3,250 | $65,000 |
| RA-3 through RA-5, D-1-R, SEFC-2, SEFC-3, or CG-1 zones | 43,560 sq. ft. or part of that area | $6,500 | $65,000 |
| MU-1, MU-2, MU-10 through MU-14, D-2, SEFC-1, SEFC-4, CG4 through CG-7, and ARTS-4 zones | 10,000 sq. ft. or part of that area | $2,600 | |
| MU-3 through MU-6, NMU-3 through NMU-6, D-4-R, CG-2, ARTS-1, and ARTS-2 zones | 10,000 sq. ft. or part of that area | $1,625 | |
| NHR, MU-7 through MU-9, MU-20, MU-21, MU‑28, MU-30, NC-6, NC-8, NC-12, NC-13, NC-15, D-3 through D-5, D-5-R, D-6, D-6-R, D-7, D-8, CG-3, and ARTS-3 zone | 10,000 sq. ft. or part of that area | $3,250 | |
| Any PDR zone | 20,000 sq. ft. or part of that area | $2,600 | |
| TEXT AMENDMENT | |||
| Each section of this title proposed to be added, deleted, or amended | Per section modified | $ 325 | $ 1,300 |
| PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 7 | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 13 | |
| MODIFICATION TO A PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| Modification to an approved design review, PUD, air space development, or any other action where review of a specific site or building plan was required | 26% of the original hearing fee or $1,300, whichever is greater | ||
| TABLE Z § 1601 – SCHEDULE OF HEARING FEES | |||
|---|---|---|---|
| MAP AMENDMENT | |||
| Case Type | Unit | Fee | Maximum |
| R-1 through R-3 zones | 43,560 sq. ft. or part of that area | $ 650 | $65,000 |
| RF-1, RF-4, RF-5, or RA-1 zones | 43,560 sq. ft. or part of that area | $1,625 | $65,000 |
| RA-2 zones | 43,560 sq. ft. or part of that area | $3,250 | $65,000 |
| RA-3 through RA-5, D-1-R, SEFC-2, SEFC-3, or CG-1 zones | 43,560 sq. ft. or part of that area | $6,500 | $65,000 |
| MU-1, MU-2, MU-10 through MU-14, D-2, SEFC-1, SEFC-4, CG4 through CG-7, and ARTS-4 zones | 10,000 sq. ft. or part of that area | $2,600 | |
| MU-3 through MU-6, NMU-3 through NMU-6, D-4-R, CG-2, ARTS-1, and ARTS-2 zones | 10,000 sq. ft. or part of that area | $1,625 | |
| NHR, MU-7 through MU-9, MU-20, MU-21, MU‑28, MU-30, NC-6, NC-8, NC-12, NC-13, NC-15, D-3 through D-5, D-5-R, D-6, D-6-R, D-7, D-8, CG-3, and ARTS-3 zone | 10,000 sq. ft. or part of that area | $3,250 | |
| Any PDR zone | 20,000 sq. ft. or part of that area | $2,600 | |
| TEXT AMENDMENT | |||
| Each section of this title proposed to be added, deleted, or amended | Per section modified | $ 325 | $ 1,300 |
| PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 7 | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 13 | |
| MODIFICATION TO A PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| Modification to an approved design review, PUD, air space development, or any other action where review of a specific site or building plan was required | 26% of the original hearing fee or $1,300, whichever is greater | ||
| TABLE Z § 1601 – SCHEDULE OF HEARING FEES | |||
|---|---|---|---|
| MAP AMENDMENT | |||
| Case Type | Unit | Fee | Maximum |
| R-1 through R-3 zones | 43,560 sq. ft. or part of that area | $ 650 | $65,000 |
| RF-1, RF-4, RF-5, or RA-1 zones | 43,560 sq. ft. or part of that area | $1,625 | $65,000 |
| RA-2 zones | 43,560 sq. ft. or part of that area | $3,250 | $65,000 |
| RA-3 through RA-5, D-1-R, SEFC-2, SEFC-3, or CG-1 zones | 43,560 sq. ft. or part of that area | $6,500 | $65,000 |
| MU-1, MU-2, MU-10 through MU-14, D-2, SEFC-1, SEFC-4, CG4 through CG-7, and ARTS-4 zones | 10,000 sq. ft. or part of that area | $2,600 | |
| MU-3 through MU-6, NMU-3 through NMU-6, D-4-R, CG-2, ARTS-1, and ARTS-2 zones | 10,000 sq. ft. or part of that area | $1,625 | |
| NHR, MU-7 through MU-9, MU-20, MU-21, MU‑28, MU-30, NC-6, NC-8, NC-12, NC-13, NC-15, D-3 through D-5, D-5-R, D-6, D-6-R, D-7, D-8, CG-3, and ARTS-3 zone | 10,000 sq. ft. or part of that area | $3,250 | |
| Any PDR zone | 20,000 sq. ft. or part of that area | $2,600 | |
| TEXT AMENDMENT | |||
| Each section of this title proposed to be added, deleted, or amended | Per section modified | $ 325 | $ 1,300 |
| PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to dwelling units, and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 7 | $65,000 |
| For each one hundred square feet (100 sq. ft.) of gross floor area or part thereof included in the application devoted to any use other than a dwelling unit and the immediate area needed to serve that dwelling unit | 100 sq. ft. of gross floor area or part of that area | $ 13 | |
| MODIFICATION TO A PLANNED UNIT DEVELOPMENT OR AIR SPACE DEVELOPMENT | |||
| Modification to an approved design review, PUD, air space development, or any other action where review of a specific site or building plan was required | 26% of the original hearing fee or $1,300, whichever is greater | ||