BUILDING PERMIT AND CERTIFICATE OF ZONING COMPLIANCE
§ 40-11-1 BUILDING PERMIT.
No building or structure shall be erected, enlarged or altered until a permit has been issued by the city. No such building permit shall be issued for any building or structure where said construction, enlargement, or alteration or use thereof would be in violation of any of the provisions of this code. Further, the issuance of any building permit by the city which involves aspects regulated by this zoning code shall require the approval of the Zoning Administrator, whose decision with respect thereto shall be subject to review and modification or change by the Board of Zoning Appeals.
(A) There shall be submitted with all applications for building permits of buildings or structures one copy of a layout or plat plan drawn to scale, showing actual dimensions of the lot to be built upon, the exact size and location on the lot of the building and accessory buildings to be erected, and such other information as may be necessary to determine and provide for the enforcement of this zoning code.
(B) In addition to the requirements of division (A) above, there shall be submitted with all applications for building permits for condominium dwellings:
(1) The recorded declarations of a condominium association and plat of survey; or
(2) A writing indicating the intent to file and submit the declarations and plat of survey as well as a written acknowledgment that an occupancy permit will not be issued until the declarations are submitted.
(C) In addition to other requirements in this code, there shall be submitted the recorded declarations of the condominium association and plat of survey before an occupancy permit to the dwelling will be granted.
No change in the use of land, nor any change of use in an existing building shall be made, until a Certificate of Zoning Compliance has been issued by the Zoning Administrator.
No permit for excavation shall be issued before the application has been made and approved.
(Ord. 1070, § 40-11-4, passed 7-20-1998)
Waterloo City Zoning Code
ARTICLE XI
BUILDING PERMIT AND CERTIFICATE OF ZONING COMPLIANCE
§ 40-11-1 BUILDING PERMIT.
No building or structure shall be erected, enlarged or altered until a permit has been issued by the city. No such building permit shall be issued for any building or structure where said construction, enlargement, or alteration or use thereof would be in violation of any of the provisions of this code. Further, the issuance of any building permit by the city which involves aspects regulated by this zoning code shall require the approval of the Zoning Administrator, whose decision with respect thereto shall be subject to review and modification or change by the Board of Zoning Appeals.
(A) There shall be submitted with all applications for building permits of buildings or structures one copy of a layout or plat plan drawn to scale, showing actual dimensions of the lot to be built upon, the exact size and location on the lot of the building and accessory buildings to be erected, and such other information as may be necessary to determine and provide for the enforcement of this zoning code.
(B) In addition to the requirements of division (A) above, there shall be submitted with all applications for building permits for condominium dwellings:
(1) The recorded declarations of a condominium association and plat of survey; or
(2) A writing indicating the intent to file and submit the declarations and plat of survey as well as a written acknowledgment that an occupancy permit will not be issued until the declarations are submitted.
(C) In addition to other requirements in this code, there shall be submitted the recorded declarations of the condominium association and plat of survey before an occupancy permit to the dwelling will be granted.
No change in the use of land, nor any change of use in an existing building shall be made, until a Certificate of Zoning Compliance has been issued by the Zoning Administrator.