Commercial Corridor Overlay District
When abutting an existing residential use, in addition to the twenty-foot "no build" and "no parking" buffer, a step-up approach shall be applied to building heights as illustrated below. Building height will be limited to 35 feet for the first 25 feet after the twenty-foot buffer. |
The required buffers are to be located so as not to interfere with safe emergency vehicle access and will be subject to review and approval by the Weymouth Fire Department. |
Studios and one bedrooms | 1.25 spaces per unit minimum with 1.5 spaces maximum |
All other residential | 1.5 spaces per unit minimum with 2 spaces maximum |
If the proposed development site is within 1,000 feet of an MBTA Commuter Rail station, the Board of Zoning Appeals may accept a reduction in the above requirements to 1.0 space per studio or one-bedroom unit and 1.25 for other units. |
The number of spaces required for other uses are pursuant to § 120-74 of this ordinance. |
Commercial Corridor Overlay District
When abutting an existing residential use, in addition to the twenty-foot "no build" and "no parking" buffer, a step-up approach shall be applied to building heights as illustrated below. Building height will be limited to 35 feet for the first 25 feet after the twenty-foot buffer. |
The required buffers are to be located so as not to interfere with safe emergency vehicle access and will be subject to review and approval by the Weymouth Fire Department. |
Studios and one bedrooms | 1.25 spaces per unit minimum with 1.5 spaces maximum |
All other residential | 1.5 spaces per unit minimum with 2 spaces maximum |
If the proposed development site is within 1,000 feet of an MBTA Commuter Rail station, the Board of Zoning Appeals may accept a reduction in the above requirements to 1.0 space per studio or one-bedroom unit and 1.25 for other units. |
The number of spaces required for other uses are pursuant to § 120-74 of this ordinance. |