In addition to the foregoing, no building permit shall be issued with regard to the construction of new residential homes unless the Borough Engineer has reviewed the application and the plans submitted for the proposed structure with particular attention to the height of the structure, drainage, soil movement, driveway location and access as defined by this chapter. All plans, sections and views necessary to perform the calculations used in arriving at the height of the building shall be made available by the applicant, together with the topography of the land upon which the proposed structure or building is to be located, as well as such other information deemed necessary by the Borough Engineer to assure compliance with Borough ordinances.