A.
A complete sanitary sewer system is required for all new
development. The minimum internal size of sanitary sewer main shall be eight inches in diameter. The top of the sewer main shall be a minimum of three feet lower than the lowest floor elevation at all service connection locations, but not less than eight feet below finished
grade, wherever possible. Should the sewers serving a particular development not be deep enough to serve the
basement, as noted above, then overhead plumbing will be required. However, all levels of the
building must be served by gravity, with only the below-grade levels being served by a pump unit. The
City Engineer may require that certain buildings not have subgrade levels due to special situations.
B.
The sanitary sewer shall be extended to the development's far extremes, as directed by the City Engineer, for proper and orderly growth. The city Engineer will also direct the sizing and grades for the sewer, so as to fit the overall plan for the City. The City strongly discourages the use of lift stations, but if the City Engineer approves the use of a public lift station, the following shall be required as a minimum:
C.
The pumps shall be submersible, with a back up pump and well-designed wet well.
D.
The station building shall be a brick
structure with conventional-pitched roofing and paved access. The building shall comply with all International Building Code regulations, and shall be heated and ventilated. The
subdivider shall follow normal building permit procedures, and pay the normal fees for construction of the lift station building.
E.
The unit will be equipped with a back-up power source, utilizing natural gas as a fuel, and can operate on manual or fully automatic mode, complete with a variable exercise mode.
F.
The motor control center shall have a solid-state duplex logic. Sewage level in the wet well shall be measured with a pressure transducer. A dial-out alarm system matching that currently in use in the City shall be provided.
G.
The City Engineer must approve any and all lift stations, and may require other
improvements.
H.
There shall be good-quality noise control, and all electronic components shall be explosionproof.
I.
Force mains shall be sized to carry the initial, intermediate, and ultimate flow rates from the tributary area, at a velocity of between 3.0 and 6.0 feet per second. Material shall be watermain quality Ductile Iron with polyethylene encasement. Gate valves in vaults shall be constructed in the force main at intervals not exceeding 600 feet, to allow quick isolation in the event of a leak. Blow-off valves in vaults shall be constructed at high points in the force main, and shall discharge to sanitary sewers, where possible. Force mains shall be tested at
J.
150-psi for two hours, similar to watermain testing.
K.
The sub-divider shall maintain an inventory of each size and type fuse, relay, and other plugin type devices used in the lift station motor control center, as recommended by the manufacturer. These items shall be housed in a wall mounted metal cabinet. The subdivider shall also supply a heavy-duty free standing metal shelf with not less than square feet of shelf space, and one (1) fire extinguisher rated for Type A, B, and C fires.
L.
The sub-divider shall provide start-up training to the Public Works Department personnel, and shall provide three sets of Operations and Maintenance Manuals for all equipment at the lift station.
M.
Underground conduit shall be heavy-wall PVC.
N.
The exterior of the wet well shall be waterproofed. The City may require the wet well to have a minimum internal diameter of up to eight feet.
O.
Sewer construction cannot start until the Illinois Environmental Pollution Agency (IEP A) has notified the City Engineer that approvals have been secured. Sanitary sewer pipe shall be PVC plastic pipe, with a minimum SDR 26. All pipe and fittings shall be pressure rated in accordance with ASTM D-2241 and ASTM D-3139 (per AWWA C-900) for sizes 6-15 inches. Solvent joints are not permitted.
P.
All public sanitary sewers will be air and mandrel tested (7-point minimum) by the developer, at his expense, under the supervision of the City Engineer. One copy of the report shall be forwarded to the Yorkville-Bristol Sanitary District, and one report shall be forwarded to the City Engineer.
Q.
All testing will be done in conformance with the "Standard Specifications For Water and Sewer Main Construction in Illinois", current edition.
R.
All public sanitary sewers shall be internally televised in color and recorded on videotape and written log by the developer, at his expense; under the supervision of the City Engineer, to ensure that the sewers are straight, unbroken, tight, and flawless. There must be good-quality lighting for a sharp and clear image of all sewer segments. Poor quality images will result in re-televising the system, at the developer's expense. The videotape must clearly mark the segment being televised through manhole numbering, and the image must clearly identify the footage as it progresses through the pipe. One copy of the complete videotapes and written log shall be forwarded to the Yorkville-Bristol Sanitary District, and one complete set shall be forwarded to the City Engineer.
S.
All manholes will be required to be internally vacuum tested by the developer, at his expense, under the supervision of the Engineer. This test will check the integrity of the complete structure, from the invert to the casting, including all adjusting rings. One copy of the test results shall be forwarded to the Yorkville-Bristol Sanitary District, and one copy shall be forwarded to the City Engineer. Vacuum testing of each manhole shall be carried out immediately after assembly backfilling, and rough grading, and shall be witnessed and approved by the City Engineer. All lift holes shall be plugged with an approved non-shrinking grout. No grout will be placed in the horizontal joints before testing. All pipes entering the manhole shall be plugged, taking care to securely brace the plugs from being drawn into the manhole. The test head shall be placed at the inside of the top of the casting and the seal inflated in accordance with the manufacturer's recommendations. A vacuum of ten inches of mercury shall be drawn and the vacuum pump shut off. With the valve closed, the time shall be measured for the vacuum to drop to nine inches. The manhole shall pass if the time is greater· than 60 seconds for a 48-inch diameter manhole, 75 seconds for a 60-inch manhole, and 90 seconds for a 72-inch manhole. All manhole castings shall be Neenah No. R-1030 frame, East Jordan No. 105123, and Type B cover, or approved equal.
T.
If the. manhole fails the initial test, necessary repairs shall be made with a non-shrink grout, while the vacuum is still being drawn. Retesting shall proceed until a satisfactory test result is obtained. If the rim of a sanitary manhole needs to be reset or adjusted after successful vacuum testing, but before the expiration oft eh one-year warranty period, it shall be sealed and adjusted properly in the presence of the City Engineer. Failure to do so will require the manhole to be vacuum tested again.
U.
All manhole frames shall be Neenah No. R-1030, East Jordan No., 105123, or approved equal, with Type B covers. All Type B covers shall have "City of Yorkville" and "Sanitary" cast into the lid and shall have concealed pick holes with a machined surface and watertight rubber gasket seals. All manhole segments, including the frame and adjusting rings, shall be set with butyl rope joint sealant. Manholes shall be minimum four-foot diameter, and shall not be located in pavement, curb, gutter, or
sidewalk.
V.
All sanitary sewer manholes shall be provided with approved cast in place rubber boots (flexible manhole sleeve), having a nominal wall thickness of 3/16" with a ribbed concrete configuration and with stainless steel binding straps, properly sized and installed for all conduits.
W.
All manholes shall be reinforced precast concrete, and shall be located at intersections and spaced at a maximum interval of 300 feet, except that a closer spacing may be required for special conditions. The maximum allowable amount of adjusting rings shall be eight inches in height using as few rings as possible. All manholes shall be marked at the time of construction with a four-inch by four-inch hardwood post neatly installed vertically and with a minimum three-feet bury and a minimum four-foot exposed. The top one-foot of the post shall be neatly painted white.
X.
Wells and septic systems are allowed in Estate-residential developments that are not within 250 feet of water and/or sewer service. When each
lot is within 250 feet of water and/or service, that lot may maintain their septic and/or well only until failure of the septic or well. At that time the lot must, if within 250 feet of the sewer and/or water line hook-up to the sewer and/or water, as the case may be, connect to the City utilities at the lot owner's sole expense. After connection to the City Sanitary Sewer System, individual septic fields shall be abandoned by pumping out the tank, knocking in the cover, and filling with dirt or stone in accordance with Health Department regulations.
Effective on: 1/1/1901