UDO REVIEW AND APPROVAL PROCEDURES
To hear and act upon requests for interpretations of this Title and appeals of decisions made by the Zoning Administrator or Zoning officer.
Effective on: 1/1/1901
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Table 10-8-2(A): Summary of Administrative Review and Approval Procedures | ||
|---|---|---|
| Administrative Review Procedure | Zoning Administrator | Zoning Officer |
| Building Permit | ₀ | • |
| Certificate of Occupancy | ₀ | • |
| Lot Split | • | |
| Sign Permit | ₀ | • |
| Temporary Use Permit | • | ₀ |
| Key: • = Review and Decision Making Body ₀ = Review Body | ||
| Table 10-8-2(A): Summary of Administrative Review and Approval Procedures | ||
|---|---|---|
| Administrative Review Procedure | Zoning Administrator | Zoning Officer |
| Building Permit | ₀ | • |
| Certificate of Occupancy | ₀ | • |
| Lot Split | • | |
| Sign Permit | ₀ | • |
| Temporary Use Permit | • | ₀ |
| Key: • = Review and Decision Making Body ₀ = Review Body | ||
| Table 10-8-2(A): Summary of Administrative Review and Approval Procedures | ||
|---|---|---|
| Administrative Review Procedure | Zoning Administrator | Zoning Officer |
| Building Permit | ₀ | • |
| Certificate of Occupancy | ₀ | • |
| Lot Split | • | |
| Sign Permit | ₀ | • |
| Temporary Use Permit | • | ₀ |
| Key: • = Review and Decision Making Body ₀ = Review Body | ||
| Table 10-8-2(A): Summary of Administrative Review and Approval Procedures | ||
|---|---|---|
| Administrative Review Procedure | Zoning Administrator | Zoning Officer |
| Building Permit | ₀ | • |
| Certificate of Occupancy | ₀ | • |
| Lot Split | • | |
| Sign Permit | ₀ | • |
| Temporary Use Permit | • | ₀ |
| Key: • = Review and Decision Making Body ₀ = Review Body | ||
A building permit application shall be reviewed by both the Zoning Officer and Zoning Administrator or an appointed designee of their choosing.
Any development which will increase the overall impervious lot coverage of a parcel.
Correction of errors or omissions on a filed Final Plat, such as legal description errors, typographical and mapping errors, lot identification errors, and surveyor corrections.
Lot Split Review Criteria.
Advancement To Variance. The Zoning Administrator may advance any Lot Consolidation/Split application to a Subdivision in instances that, in the opinion of the Zoning Administrator, require public input and review by the Planning and Zoning Commission to approve or deny. Any Lot Consolidation/Split advanced to a Subdivision shall follow the procedure in Section 10-8-6.
Effective on: 1/1/1901
| Table 10-8-4(A): Summary of Board/Commission Review and Approval Procedures | ||||
|---|---|---|---|---|
| Petition Review Procedure | Plan Council | Economic Development Committee | Planning and Zoning Commission | City Council |
| Special Use | A | A | R1 | D |
| Subdivision | A | A | R | D |
| Planned Unit Development | A | A | R1 | D |
| Variation | A | A | R1/D3 | D3 |
| Appeal | D | |||
| Text Amendment | A | R1 | D | |
| Map Amendment | A2 | A | R1 | D |
| Annexations | A2 | A | D | |
| Annexation Agreements | A2 | A | D4 | |
| Economic Incentive/Development Agreement | A2 | A | D | |
| Key: A = Advisory Body R = Recommending Body D = Decision Making Body 1 = Public Notice Required 2 = Optional Review Step at the Zoning Administrator's discretion 3 = Authorized Variances per Section 10-8-9.B 4 = Taxing Body notice per Table 10-8-4B)(1) | ||||
| Table 10-8-4(A): Summary of Board/Commission Review and Approval Procedures | ||||
|---|---|---|---|---|
| Petition Review Procedure | Plan Council | Economic Development Committee | Planning and Zoning Commission | City Council |
| Special Use | A | A | R1 | D |
| Subdivision | A | A | R | D |
| Planned Unit Development | A | A | R1 | D |
| Variation | A | A | R1/D3 | D3 |
| Appeal | D | |||
| Text Amendment | A | R1 | D | |
| Map Amendment | A2 | A | R1 | D |
| Annexations | A2 | A | D | |
| Annexation Agreements | A2 | A | D4 | |
| Economic Incentive/Development Agreement | A2 | A | D | |
| Key: A = Advisory Body R = Recommending Body D = Decision Making Body 1 = Public Notice Required 2 = Optional Review Step at the Zoning Administrator's discretion 3 = Authorized Variances per Section 10-8-9.B 4 = Taxing Body notice per Table 10-8-4B)(1) | ||||
| Table 10-8-4(A): Summary of Board/Commission Review and Approval Procedures | ||||
|---|---|---|---|---|
| Petition Review Procedure | Plan Council | Economic Development Committee | Planning and Zoning Commission | City Council |
| Special Use | A | A | R1 | D |
| Subdivision | A | A | R | D |
| Planned Unit Development | A | A | R1 | D |
| Variation | A | A | R1/D3 | D3 |
| Appeal | D | |||
| Text Amendment | A | R1 | D | |
| Map Amendment | A2 | A | R1 | D |
| Annexations | A2 | A | D | |
| Annexation Agreements | A2 | A | D4 | |
| Economic Incentive/Development Agreement | A2 | A | D | |
| Key: A = Advisory Body R = Recommending Body D = Decision Making Body 1 = Public Notice Required 2 = Optional Review Step at the Zoning Administrator's discretion 3 = Authorized Variances per Section 10-8-9.B 4 = Taxing Body notice per Table 10-8-4B)(1) | ||||
| Table 10-8-4(A): Summary of Board/Commission Review and Approval Procedures | ||||
|---|---|---|---|---|
| Petition Review Procedure | Plan Council | Economic Development Committee | Planning and Zoning Commission | City Council |
| Special Use | A | A | R1 | D |
| Subdivision | A | A | R | D |
| Planned Unit Development | A | A | R1 | D |
| Variation | A | A | R1/D3 | D3 |
| Appeal | D | |||
| Text Amendment | A | R1 | D | |
| Map Amendment | A2 | A | R1 | D |
| Annexations | A2 | A | D | |
| Annexation Agreements | A2 | A | D4 | |
| Economic Incentive/Development Agreement | A2 | A | D | |
| Key: A = Advisory Body R = Recommending Body D = Decision Making Body 1 = Public Notice Required 2 = Optional Review Step at the Zoning Administrator's discretion 3 = Authorized Variances per Section 10-8-9.B 4 = Taxing Body notice per Table 10-8-4B)(1) | ||||
| Table 10-8-4(B)(1): Notice Methods by Board/Commission Review and Action Procedure | ||
|---|---|---|
| Petition Review Procedure | Published Notice | Mailed Notice |
| Special Use | • | • |
| Special Use Major Amendment | • | • |
| Planned Unit Development | • | • |
| Planned Unit Development Major Amendment | • | • |
| Variation | • | • |
| Map Amendment | • | • |
| Text Amendment | • | |
| Annexations | ||
| Annexation Agreements | • | 1 |
| Economic Incentive/Development Agreement | ||
| Key: • = Required Notice Method 1 = Required Notice only to Trustees of Fire Protection District and Township Trustees and Commissioner of Highways if the land to be annexed includes any highway under township jurisdiction. | ||
| Table 10-8-4(B)(1): Notice Methods by Board/Commission Review and Action Procedure | ||
|---|---|---|
| Petition Review Procedure | Published Notice | Mailed Notice |
| Special Use | • | • |
| Special Use Major Amendment | • | • |
| Planned Unit Development | • | • |
| Planned Unit Development Major Amendment | • | • |
| Variation | • | • |
| Map Amendment | • | • |
| Text Amendment | • | |
| Annexations | ||
| Annexation Agreements | • | 1 |
| Economic Incentive/Development Agreement | ||
| Key: • = Required Notice Method 1 = Required Notice only to Trustees of Fire Protection District and Township Trustees and Commissioner of Highways if the land to be annexed includes any highway under township jurisdiction. | ||
| Table 10-8-4(B)(1): Notice Methods by Board/Commission Review and Action Procedure | ||
|---|---|---|
| Petition Review Procedure | Published Notice | Mailed Notice |
| Special Use | • | • |
| Special Use Major Amendment | • | • |
| Planned Unit Development | • | • |
| Planned Unit Development Major Amendment | • | • |
| Variation | • | • |
| Map Amendment | • | • |
| Text Amendment | • | |
| Annexations | ||
| Annexation Agreements | • | 1 |
| Economic Incentive/Development Agreement | ||
| Key: • = Required Notice Method 1 = Required Notice only to Trustees of Fire Protection District and Township Trustees and Commissioner of Highways if the land to be annexed includes any highway under township jurisdiction. | ||
| Table 10-8-4(B)(1): Notice Methods by Board/Commission Review and Action Procedure | ||
|---|---|---|
| Petition Review Procedure | Published Notice | Mailed Notice |
| Special Use | • | • |
| Special Use Major Amendment | • | • |
| Planned Unit Development | • | • |
| Planned Unit Development Major Amendment | • | • |
| Variation | • | • |
| Map Amendment | • | • |
| Text Amendment | • | |
| Annexations | ||
| Annexation Agreements | • | 1 |
| Economic Incentive/Development Agreement | ||
| Key: • = Required Notice Method 1 = Required Notice only to Trustees of Fire Protection District and Township Trustees and Commissioner of Highways if the land to be annexed includes any highway under township jurisdiction. | ||
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Figure 8.1. Special Use Procedure |
![]() |
Effective on: 1/1/1901
Widths. The exact width of all easements, streets, and alleys.
Lot Lines. The dimensions of all lot lines, to the nearest one-hundredth of a foot.
Setback Lines. Building setback lines on all lots.
City Planning and Zoning Commission, Chairman.
| Figure 8.2. Subdivision Procedure |
![]() |
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
Effective on: 1/1/1901
| Figure 8.3. Planned Unit Development Procedure |
![]() |
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
| Figure 8.4. Text Amendment Procedure |
![]() |
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Figure 8.5. Map Amendment Procedure |
![]() |
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Figure 8.6. Annexation Agreement Procedure |
![]() |
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Figure 8.7. Economic Incentive/Development Agreement Procedure |
![]() |
Effective on: 1/1/1901
UDO REVIEW AND APPROVAL PROCEDURES
To hear and act upon requests for interpretations of this Title and appeals of decisions made by the Zoning Administrator or Zoning officer.
Effective on: 1/1/1901
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Table 10-8-2(A): Summary of Administrative Review and Approval Procedures | ||
|---|---|---|
| Administrative Review Procedure | Zoning Administrator | Zoning Officer |
| Building Permit | ₀ | • |
| Certificate of Occupancy | ₀ | • |
| Lot Split | • | |
| Sign Permit | ₀ | • |
| Temporary Use Permit | • | ₀ |
| Key: • = Review and Decision Making Body ₀ = Review Body | ||
| Table 10-8-2(A): Summary of Administrative Review and Approval Procedures | ||
|---|---|---|
| Administrative Review Procedure | Zoning Administrator | Zoning Officer |
| Building Permit | ₀ | • |
| Certificate of Occupancy | ₀ | • |
| Lot Split | • | |
| Sign Permit | ₀ | • |
| Temporary Use Permit | • | ₀ |
| Key: • = Review and Decision Making Body ₀ = Review Body | ||
| Table 10-8-2(A): Summary of Administrative Review and Approval Procedures | ||
|---|---|---|
| Administrative Review Procedure | Zoning Administrator | Zoning Officer |
| Building Permit | ₀ | • |
| Certificate of Occupancy | ₀ | • |
| Lot Split | • | |
| Sign Permit | ₀ | • |
| Temporary Use Permit | • | ₀ |
| Key: • = Review and Decision Making Body ₀ = Review Body | ||
| Table 10-8-2(A): Summary of Administrative Review and Approval Procedures | ||
|---|---|---|
| Administrative Review Procedure | Zoning Administrator | Zoning Officer |
| Building Permit | ₀ | • |
| Certificate of Occupancy | ₀ | • |
| Lot Split | • | |
| Sign Permit | ₀ | • |
| Temporary Use Permit | • | ₀ |
| Key: • = Review and Decision Making Body ₀ = Review Body | ||
A building permit application shall be reviewed by both the Zoning Officer and Zoning Administrator or an appointed designee of their choosing.
Any development which will increase the overall impervious lot coverage of a parcel.
Correction of errors or omissions on a filed Final Plat, such as legal description errors, typographical and mapping errors, lot identification errors, and surveyor corrections.
Lot Split Review Criteria.
Advancement To Variance. The Zoning Administrator may advance any Lot Consolidation/Split application to a Subdivision in instances that, in the opinion of the Zoning Administrator, require public input and review by the Planning and Zoning Commission to approve or deny. Any Lot Consolidation/Split advanced to a Subdivision shall follow the procedure in Section 10-8-6.
Effective on: 1/1/1901
| Table 10-8-4(A): Summary of Board/Commission Review and Approval Procedures | ||||
|---|---|---|---|---|
| Petition Review Procedure | Plan Council | Economic Development Committee | Planning and Zoning Commission | City Council |
| Special Use | A | A | R1 | D |
| Subdivision | A | A | R | D |
| Planned Unit Development | A | A | R1 | D |
| Variation | A | A | R1/D3 | D3 |
| Appeal | D | |||
| Text Amendment | A | R1 | D | |
| Map Amendment | A2 | A | R1 | D |
| Annexations | A2 | A | D | |
| Annexation Agreements | A2 | A | D4 | |
| Economic Incentive/Development Agreement | A2 | A | D | |
| Key: A = Advisory Body R = Recommending Body D = Decision Making Body 1 = Public Notice Required 2 = Optional Review Step at the Zoning Administrator's discretion 3 = Authorized Variances per Section 10-8-9.B 4 = Taxing Body notice per Table 10-8-4B)(1) | ||||
| Table 10-8-4(A): Summary of Board/Commission Review and Approval Procedures | ||||
|---|---|---|---|---|
| Petition Review Procedure | Plan Council | Economic Development Committee | Planning and Zoning Commission | City Council |
| Special Use | A | A | R1 | D |
| Subdivision | A | A | R | D |
| Planned Unit Development | A | A | R1 | D |
| Variation | A | A | R1/D3 | D3 |
| Appeal | D | |||
| Text Amendment | A | R1 | D | |
| Map Amendment | A2 | A | R1 | D |
| Annexations | A2 | A | D | |
| Annexation Agreements | A2 | A | D4 | |
| Economic Incentive/Development Agreement | A2 | A | D | |
| Key: A = Advisory Body R = Recommending Body D = Decision Making Body 1 = Public Notice Required 2 = Optional Review Step at the Zoning Administrator's discretion 3 = Authorized Variances per Section 10-8-9.B 4 = Taxing Body notice per Table 10-8-4B)(1) | ||||
| Table 10-8-4(A): Summary of Board/Commission Review and Approval Procedures | ||||
|---|---|---|---|---|
| Petition Review Procedure | Plan Council | Economic Development Committee | Planning and Zoning Commission | City Council |
| Special Use | A | A | R1 | D |
| Subdivision | A | A | R | D |
| Planned Unit Development | A | A | R1 | D |
| Variation | A | A | R1/D3 | D3 |
| Appeal | D | |||
| Text Amendment | A | R1 | D | |
| Map Amendment | A2 | A | R1 | D |
| Annexations | A2 | A | D | |
| Annexation Agreements | A2 | A | D4 | |
| Economic Incentive/Development Agreement | A2 | A | D | |
| Key: A = Advisory Body R = Recommending Body D = Decision Making Body 1 = Public Notice Required 2 = Optional Review Step at the Zoning Administrator's discretion 3 = Authorized Variances per Section 10-8-9.B 4 = Taxing Body notice per Table 10-8-4B)(1) | ||||
| Table 10-8-4(A): Summary of Board/Commission Review and Approval Procedures | ||||
|---|---|---|---|---|
| Petition Review Procedure | Plan Council | Economic Development Committee | Planning and Zoning Commission | City Council |
| Special Use | A | A | R1 | D |
| Subdivision | A | A | R | D |
| Planned Unit Development | A | A | R1 | D |
| Variation | A | A | R1/D3 | D3 |
| Appeal | D | |||
| Text Amendment | A | R1 | D | |
| Map Amendment | A2 | A | R1 | D |
| Annexations | A2 | A | D | |
| Annexation Agreements | A2 | A | D4 | |
| Economic Incentive/Development Agreement | A2 | A | D | |
| Key: A = Advisory Body R = Recommending Body D = Decision Making Body 1 = Public Notice Required 2 = Optional Review Step at the Zoning Administrator's discretion 3 = Authorized Variances per Section 10-8-9.B 4 = Taxing Body notice per Table 10-8-4B)(1) | ||||
| Table 10-8-4(B)(1): Notice Methods by Board/Commission Review and Action Procedure | ||
|---|---|---|
| Petition Review Procedure | Published Notice | Mailed Notice |
| Special Use | • | • |
| Special Use Major Amendment | • | • |
| Planned Unit Development | • | • |
| Planned Unit Development Major Amendment | • | • |
| Variation | • | • |
| Map Amendment | • | • |
| Text Amendment | • | |
| Annexations | ||
| Annexation Agreements | • | 1 |
| Economic Incentive/Development Agreement | ||
| Key: • = Required Notice Method 1 = Required Notice only to Trustees of Fire Protection District and Township Trustees and Commissioner of Highways if the land to be annexed includes any highway under township jurisdiction. | ||
| Table 10-8-4(B)(1): Notice Methods by Board/Commission Review and Action Procedure | ||
|---|---|---|
| Petition Review Procedure | Published Notice | Mailed Notice |
| Special Use | • | • |
| Special Use Major Amendment | • | • |
| Planned Unit Development | • | • |
| Planned Unit Development Major Amendment | • | • |
| Variation | • | • |
| Map Amendment | • | • |
| Text Amendment | • | |
| Annexations | ||
| Annexation Agreements | • | 1 |
| Economic Incentive/Development Agreement | ||
| Key: • = Required Notice Method 1 = Required Notice only to Trustees of Fire Protection District and Township Trustees and Commissioner of Highways if the land to be annexed includes any highway under township jurisdiction. | ||
| Table 10-8-4(B)(1): Notice Methods by Board/Commission Review and Action Procedure | ||
|---|---|---|
| Petition Review Procedure | Published Notice | Mailed Notice |
| Special Use | • | • |
| Special Use Major Amendment | • | • |
| Planned Unit Development | • | • |
| Planned Unit Development Major Amendment | • | • |
| Variation | • | • |
| Map Amendment | • | • |
| Text Amendment | • | |
| Annexations | ||
| Annexation Agreements | • | 1 |
| Economic Incentive/Development Agreement | ||
| Key: • = Required Notice Method 1 = Required Notice only to Trustees of Fire Protection District and Township Trustees and Commissioner of Highways if the land to be annexed includes any highway under township jurisdiction. | ||
| Table 10-8-4(B)(1): Notice Methods by Board/Commission Review and Action Procedure | ||
|---|---|---|
| Petition Review Procedure | Published Notice | Mailed Notice |
| Special Use | • | • |
| Special Use Major Amendment | • | • |
| Planned Unit Development | • | • |
| Planned Unit Development Major Amendment | • | • |
| Variation | • | • |
| Map Amendment | • | • |
| Text Amendment | • | |
| Annexations | ||
| Annexation Agreements | • | 1 |
| Economic Incentive/Development Agreement | ||
| Key: • = Required Notice Method 1 = Required Notice only to Trustees of Fire Protection District and Township Trustees and Commissioner of Highways if the land to be annexed includes any highway under township jurisdiction. | ||
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Figure 8.1. Special Use Procedure |
![]() |
Effective on: 1/1/1901
Widths. The exact width of all easements, streets, and alleys.
Lot Lines. The dimensions of all lot lines, to the nearest one-hundredth of a foot.
Setback Lines. Building setback lines on all lots.
City Planning and Zoning Commission, Chairman.
| Figure 8.2. Subdivision Procedure |
![]() |
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
Effective on: 1/1/1901
| Figure 8.3. Planned Unit Development Procedure |
![]() |
Effective on: 1/1/1901
Effective on: 1/1/1901
Effective on: 1/1/1901
| Figure 8.4. Text Amendment Procedure |
![]() |
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Figure 8.5. Map Amendment Procedure |
![]() |
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Figure 8.6. Annexation Agreement Procedure |
![]() |
(Ord. No. 2024-50, effective 09/26/2024)
Effective on: 9/26/2024
| Figure 8.7. Economic Incentive/Development Agreement Procedure |
![]() |
Effective on: 1/1/1901