Applicability. An improvement location permit shall be required prior to permanent construction, installation, addition, alteration, or relocation of a structure; prior to permanent alteration to the land; and prior to establishment of a new land use or change to an existing land use.
Applicable zoning districts: PR, AG, AC, ER, R1, R2, R3, R4, R5, TR, LR, MH, UV, IS, NC, DC, C1, C2, HC, I1, I2, I3, HI, PD.
The following are examples of projects necessitating an improvement location permit process:
(1)
Constructing or installing a primary structure;
(2)
Constructing or installing an accessory dwelling unit;
(3)
Constructing an addition to the primary structure;
(4)
Constructing or installing an accessory structure;
(5)
Modifying a structure's height;
(6)
Installing a wind turbine system;
(7)
Installing or modifying a driveway;
(8)
Constructing or modifying off-street parking;
(9)
Adding impervious surface;
(10)
Constructing a public sidewalk;
(11)
Constructing a deck or patio;
(12)
Constructing or altering a fence;
(13)
Installing a permanent sign;
(14)
Installing a swimming pool;
(15)
Constructing a recreation pond;
(16)
Installing a well or septic system.