Primary utility lines, including, but not limited to, electricity, communications, street lighting and cable television, shall be required to be placed underground, whenever possible. Secondary utility lines must be undergrounded. All such service and facilities shall be located in a public utility easement or right-of-way with a junction box. The developer shall confer with each utility company to determine the necessary conduits and equipment, their location and installation requirements. All costs of such equipment and installation shall be at the developer’s cost or as agreed to between the developer and the utility provider.
(Ord. 89-O-446 § 1. Formerly 17.168.120; Ord. 07-O-596)